Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 Paint booth . Equipment only. Electrical and mechanical permits required. Date: March 18, 2015 Contractor: Andrew Moench Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-01766 | |||||
SCORE 56 Paver cleaning test, taking right turn lane for about 1hr casey 801-509-4802 Date: August 29, 2017 Contractor: Paver Cleaning Test Permit type: Right of way | Permit status: Warranty na | Completion date: August 22, 2017 | Current use: Right of way | Permit id: Eng2017-01669 | |||||
SCORE 59 Zoning verification letter Date: September 18, 2017 Contractor: Lettersheila Lyles Permit status: Closed | Current use: Zoning verification letter | Permit id: Plnzad2017-0077 | |||||
SCORE 56 Residential Date: July 6, 2017 Contractor: 99 W South Temple #1502jeffrey Johnson Permit status: Inspections | Current use: Residential | Permit id: Bld2017-05792 | |||||
SCORE 77 Commercial Date: October 29, 2015 Contractor: Rb Manufacturing Llc Frank Young Permit status: Closed | Current use: Commercial | Permit id: Bld2015-05247 | |||||
SCORE 56 Commercial Date: July 21, 2017 Contractor: Keybankgreg Smedley Permit status: Inspections | Current use: Commercial | Permit id: Bld2017-06341 | |||||
SCORE 77 Commercial Date: January 14, 2016 Contractor: Rb Manufacturing Llc Frank Young Permit status: Closed | Current use: Commercial | Permit id: Bld2015-05244 | |||||
SCORE 59 Commercial Date: July 14, 2017 Contractor: Reckitt Benckiserbill Osborn Permit status: Inspections | Current use: Commercial | Permit id: Bld2017-04968 | |||||
SCORE 61 Paint booth . Equipment only. Electrical and mechanical permits required. Date: March 18, 2015 Contractor: Andrew Moench Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-01766 | |||||
SCORE 61 Date: October 22, 2014 Contractor: Drop And Hooksteele Jensen Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-07718 | |||||
SCORE 61 Interior remodel of existing manufacturing facility. Date: June 30, 2014 Contractor: Boeing Assembly Linebruce Cunnington Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-02854 | |||||
SCORE 72 Install pallet racking Date: June 4, 2014 Contractor: Probarlance Jorgenson Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-03869 | |||||
SCORE 67 Date: July 15, 2016 Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-06670 | |||||
SCORE 61 Tenant improvement Date: October 6, 2015 Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-05459 | |||||
SCORE 61 Date: March 21, 2016 Contractor: Smiths Baseball Diamondkay Christensen Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-02544 | |||||
SCORE 72 Install pallet racking Date: March 6, 2015 Contractor: Probarlance Jorgenson Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-01493 | |||||
SCORE 59 Structural work only for an interior (2) level addition d. D. A. M. Date: September 17, 2013 Contractor: Reckitt Benckiser, Project Jordanallan Hartman Permit status: Inspections | Current use: Commercial | Permit id: Bld2013-06001 | |||||
SCORE 67 Date: May 18, 2016 Contractor: Kirton And Mcconkie T.Idan Strear Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-04765 | |||||
SCORE 61 Date: September 4, 2014 Contractor: Intermountain Health Carekurt Wilson Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-04597 | |||||
SCORE 61 Replace existing antennas. Relocate to roof. Date: April 15, 2014 Contractor: Ed Rollins Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-02478 | |||||
SCORE 65 Date: August 31, 2016 Contractor: Wtc Patiojohn Erickson Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-08228 | |||||
SCORE 67 Date: September 7, 2016 Contractor: Workman Nydeggerrebecca Delis Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-03779 | |||||
SCORE 59 Date: November 1, 2016 Contractor: Reckitt Benckiserjeff Jeppson Permit status: In for review | Current use: Commercial | Permit id: Bld2016-09152 | |||||
SCORE 65 Date: December 20, 2016 Contractor: 1755 W Sequoia Vista Circlesteven Tripp Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-10025 | |||||
SCORE 65 Date: December 23, 2016 Contractor: Asphalt Systems Incmarty Furmanski Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-11672 | |||||
SCORE 61 Date: June 9, 2016 Permit status: Closed | Current use: Commercial | Permit id: Bld2015-09851 | |||||
SCORE 61 Manufacturing clean room Date: May 29, 2015 Contractor: Reckitt Benckisermatt Cederhorm Permit status: Closed | Current use: Commercial | Permit id: Bld2014-03320 | |||||
SCORE 61 Tenent improvement for lab space. Date: July 2, 2014 Contractor: Rechitt Benckisermatt Cederholm Permit status: Closed | Current use: Commercial | Permit id: Bld2014-03319 | |||||
SCORE 61 Date: February 4, 2014 Contractor: Bank Of Americagreg Flint Permit status: Closed | Current use: Commercial | Permit id: Bld2013-07458 | |||||
SCORE 61 Date: March 28, 2014 Contractor: Boeing Officemike Jacks Permit status: Closed | Current use: Commercial | Permit id: Bld2014-01043 | |||||
SCORE 61 Date: May 29, 2015 Contractor: Reckitt Benckisermatt Cederholm Permit status: Closed | Current use: Commercial | Permit id: Bld2014-02209 | |||||
SCORE 61 Date: June 11, 2015 Contractor: Smiths Ballpark Salt Lake Beesmark Crnick Permit status: Closed | Current use: Commercial | Permit id: Bld2015-02939 | |||||
SCORE 77 Date: October 29, 2015 Contractor: Rb Manufacturing Llc Frank Young Permit status: Closed | Current use: Commercial | Permit id: Bld2015-05247 | |||||
SCORE 61 Date: February 17, 2016 Contractor: Reckitt Benckiserkaycee Anderson Permit status: Closed | Current use: Commercial | Permit id: Bld2015-09610 | |||||
SCORE 61 Date: March 17, 2014 Contractor: Jimmy Johns At City Creekdarin Orton Permit status: Closed | Current use: Commercial | Permit id: Bld2014-00361 | |||||
SCORE 61 Date: May 26, 2015 Contractor: Ray Quinney And Nebeker Tidonavon Minnis Permit status: Closed | Current use: Commercial | Permit id: Bld2015-00070 | |||||
SCORE 61 Date: June 22, 2016 Contractor: Stem Expansion Of Suite 850darrick N Permit status: Closed | Current use: Commercial | Permit id: Bld2016-02990 | |||||
SCORE 61 Date: June 5, 2014 Contractor: Spring Mobile Parkbruce Crotty Permit status: Closed | Current use: Commercial | Permit id: Bld2014-01611 | |||||
SCORE 61 Date: January 26, 2016 Contractor: Questar 1078 Remodelmitch Curtis Permit status: Closed | Current use: Commercial | Permit id: Bld2015-06674 | |||||
SCORE 59 Date: May 29, 2015 Contractor: Reckitt Benckiserblister Linematt Cederhorm Permit status: Closed | Current use: Commercial | Permit id: Bld2014-07234 | |||||
SCORE 61 New energy star qualified 1 story with full basement single family home. Date: February 10, 2016 Contractor: 918 Charlton Circlecoleman Larsen Permit status: Closed | Current use: Residential | Permit id: Bld2014-01869 | |||||
SCORE 61 Date: May 24, 2016 Contractor: Reckett Benckiserkaycee Anderson Permit status: Closed | Current use: Commercial | Permit id: Bld2016-04071 | |||||
SCORE 61 This project consists of two levels, with a foot print of approximately 7,093 sq. Ft. Per level, to be built-out within an existing warehouse area of an existing health care suppliment fabrication facility. The purpose of this project is to provide space and supporting space for new production lines to produce, package and ship an additional product. The existing building is construction type ii-b, with occupancy groups of b, f-1 & s-1. This build-out is not a change in use or occupancy. The building is currently sprinkled throughout and this build-out space is designed to be sprinkled as well. This build-out does not hinder the exit paths of the existing warehouse portion of the building as illustrated on the life safety plan. The travel distance from all portions of this build-out, to the existing exit passage ways, are 2 feet or less as illustrated on sheet a0. 01 - project area - life safety plans. Date: July 7, 2014 Contractor: Reckitt Benckiser Project Jordanalan Hartman Permit status: Closed | Current use: Commercial | Permit id: Bld2013-07034 | |||||
SCORE 61 Interior remodel of manufacturing operation with one air lock and relocation of equipment. Date: May 29, 2015 Contractor: Granulation Clean Roommatt Cederholm Permit status: Closed | Current use: Commercial | Permit id: Bld2014-03051 | |||||
SCORE 61 Date: June 2, 2014 Contractor: Fifty Filmsdavid Marks Permit status: Closed | Current use: Commercial | Permit id: Bld2014-02456 | |||||
SCORE 61 Date: June 22, 2016 Contractor: Deseret Trust Suite 800darrick Porter Permit status: Closed | Current use: Commercial | Permit id: Bld2016-02992 | |||||
SCORE 59 Date: November 14, 2014 Contractor: Mccann Expansion Permit status: Closed | Current use: Commercial | Permit id: Bld2014-01439 | |||||
SCORE 61 Date: December 15, 2015 Permit status: Closed | Current use: Commercial | Permit id: Bld2015-06220 | |||||
SCORE 63 Interior t. I. Remodel. Electrical, mechanical permits required. Zone - provide automati fire sprinkler protection and occupant notification. R. M. A. H. T. I. Date: August 12, 2016 Contractor: Vantage Titlejason Wedlick Permit status: Closed | Current use: Commercial | Permit id: Bld2014-03313 | |||||
SCORE 61 Date: March 30, 2016 Contractor: Questar Training Tichris Furstenan Permit status: Closed | Current use: Commercial | Permit id: Bld2015-08922 | |||||
SCORE 61 Ti Date: June 10, 2015 Contractor: Ihc Kbtbrett Beal Permit status: Closed | Current use: Commercial | Permit id: Bld2014-08975 | |||||
SCORE 77 Date: January 14, 2016 Contractor: Rb Manufacturing Llc Frank Young Permit status: Closed | Current use: Commercial | Permit id: Bld2015-05244 | |||||
SCORE 65 Date: December 16, 2015 Contractor: Frank Young Permit status: Closed | Current use: Commercial | Permit id: Bld2015-05153 | |||||
SCORE 61 Date: September 1, 2016 Contractor: Norwegian Stabbabrian Nielson Permit status: Closed | Current use: Commercial | Permit id: Bld2016-03771 | |||||
SCORE 65 Date: September 6, 2016 Contractor: Utc Elevator Renovationrebecca Delis Permit status: Closed | Current use: Commercial | Permit id: Bld2015-06218 | |||||
SCORE 59 Date: October 20, 2016 Contractor: Kirton And Mconkie Tiheather Lewelyn Permit status: Closed | Current use: Commercial | Permit id: Bld2016-03982 | |||||
SCORE 59 Replace damaged drywall & cabinetry like for like plumbing work not in contract and will need to be permitted separately. Date: October 17, 2016 Permit status: Closed | Current use: Commercial | Permit id: Bld2016-06397 | |||||
SCORE 59 Date: December 2, 2016 Permit status: Closed | Current use: Commercial | Permit id: Bld2016-07848 | |||||
SCORE 59 Date: December 21, 2016 Contractor: Webster Officestephen Tripp Permit status: Closed | Current use: Commercial | Permit id: Bld2016-11385 | |||||
SCORE 65 Date: January 10, 2017 Contractor: Fifty Films Tenant Improvementheather Lewelyn Permit status: Closed | Current use: Commercial | Permit id: Bld2016-06325 | |||||
SCORE 56 Existing communications site generator pcs aws3 8 rrh installation project Date: April 25, 2017 Contractor: Sal Beneficial Lifekate Asay Permit type: Commercial | Permit status: In for review | Current use: Commercial | Permit id: Bld2017-03096 | |||||
SCORE 65 Commercial Date: May 10, 2017 Contractor: 1755 W Sequoia Vista Circlesteven Tripp Permit status: Tco | Current use: Commercial | Permit id: Bld2016-10025 | |||||
SCORE 56 Commercial Date: April 7, 2017 Contractor: Costa Vida At City Creekrebecca Delis Permit status: In for review | Current use: Commercial | Permit id: Bld2017-02749 | |||||
SCORE 59 Commercial Date: June 13, 2017 Contractor: Reckitt Benckiserbill Osborn Permit status: In for review | Current use: Commercial | Permit id: Bld2017-04968 | |||||
SCORE 56 Commercial Date: February 6, 2017 Contractor: Asimartin Furmanski Permit status: Inspections | Current use: Commercial | Permit id: Bld2017-00889 | |||||
SCORE 56 Commercial Date: March 28, 2017 Contractor: Sieverts Contractor Lottony Sieverts Permit status: In for review | Current use: Commercial | Permit id: Bld2017-01383 | |||||
SCORE 56 Staging for crane for new sign on building face - ben 502 6606 Date: February 3, 2014 Contractor: Staging For New Sign On Building At 12 E 21 S Permit type: Right of way | Permit status: Warranty na | Completion date: January 31, 2014 | Current use: Right of way | Permit id: Eng2014-00087 | |||||
SCORE 89 Job #n. 075238; bore 1169 pestduct across 2 roads, boc, install 3 hhs (dig 6 soft surface bore pits; dig 6 hard surface pot holes, 1 soft); dpu john miller approved 4 29 2016; contractor=fugal sam 801-367-2628; project admin=sid 801-205-5643 Date: May 19, 2016 Contractor: Karen Jensen Permit type: Right of way | Permit status: Under warranty | Completion date: May 12, 2016 | Current use: Right of way | Permit id: Eng2016-00776 | |||||
SCORE 89 Job #e. 719728; project admin=sid white 801-974-8105, cell 801-205-5643; contractor=fugal sam singleton 801-367-2628; description=bore pestduct boc thru grass (dig 2 hard surface bore pits, dit 2 hard surface pot holes); slc dpu john miller approved 4 22 2015 extend permit to 5 15 Date: May 11, 2015 Contractor: Karen Jensen Permit type: Right of way | Permit status: Under warranty | Completion date: May 15, 2015 | Current use: Right of way | Permit id: Eng2015-00696 | |||||
SCORE 56 Dumpster on street for 2 weeks kayc 502-1835 Date: May 24, 2016 Contractor: Dumpster On Street At 66 E South Temple Permit type: Right of way | Permit status: Warranty na | Completion date: May 14, 2016 | Current use: Right of way | Permit id: Eng2016-00771 | |||||
Install bike rack for jimmy johns. (6 racks 8 holes per rack). Perry 801-301-8978 Date: December 3, 2014 Permit type: Right of way | Permit status: Under warranty | Completion date: November 19, 2014 | Current use: Right of way | Permit id: Eng2014-01689 | |||||
SCORE 89 Job #e. 667257-a; project admin=rod miles 801-974-8028, cell 801-259-9554; contractor=fugal sam singleton 801-367-2628; description = dig pit off eoa in dirt to place traffic-rated mh, bore e to slco boundary; slc dpu john miller approved 1 16 2015 Date: January 26, 2015 Contractor: Karen Jensen Permit type: Right of way | Permit status: Under warranty | Completion date: January 30, 2015 | Current use: Right of way | Permit id: Eng2015-00091 | |||||
SCORE 56 Sewer lateral repair in street steve 651 1477 Date: November 23, 2015 Permit type: Right of way | Permit status: Under warranty | Completion date: November 17, 2015 | Current use: Right of way | Permit id: Eng2015-02066 | |||||
SCORE 56 2 dumpsters on parking lane for 2 weeks kayc 502-1835 Date: July 28, 2016 Contractor: 2 Dumpsters In Park Lane At E South Temple Permit type: Right of way | Permit status: Warranty na | Completion date: July 1, 2016 | Current use: Right of way | Permit id: Eng2016-01133 | |||||
SCORE 56 Install new water and sewer laterals including removal and replacement of asphalt, curb, gutter and sidewalk mark 4993772 Date: August 14, 2015 Permit type: Right of way | Permit status: Under warranty | Completion date: August 3, 2015 | Current use: Right of way | Permit id: Eng2015-01295 | |||||
SCORE 56 Staging for manlift on sidewalk to paint building for one week tyler 717 6853 Date: July 15, 2015 Permit type: Right of way | Permit status: Warranty na | Completion date: July 13, 2015 | Current use: Right of way | Permit id: Eng2015-01196 | |||||
SCORE 71 Staging dumpster brandon 801-205-7563 Date: August 29, 2016 Contractor: Staging A Dumpster Permit type: Right of way | Permit status: Warranty na | Completion date: August 9, 2016 | Current use: Right of way | Permit id: Eng2016-01406 | |||||
SCORE 56 Staging crane in row to replace glass ron 801-209-5114 Date: August 29, 2016 Contractor: Staging A Crane To Replace Glass Permit type: Right of way | Permit status: Warranty na | Completion date: August 28, 2016 | Current use: Right of way | Permit id: Eng2016-01608 | |||||
SCORE 56 Staging permit for dumpster on street for less than a week brandon 205-7563 Date: September 14, 2016 Permit type: Right of way | Permit status: Warranty na | Completion date: September 3, 2016 | Current use: Right of way | Permit id: Eng2016-01655 | |||||
SCORE 69 Staging dumpster in row. Brandon 801-205-7563 Date: November 3, 2016 Contractor: Staging A Dumpster In Row Permit type: Right of way | Permit status: Warranty na | Completion date: October 7, 2016 | Current use: Right of way | Permit id: Eng2016-01777 | |||||
Staging dumpster in road. Brandon 801-205-7563 Date: December 20, 2016 Permit type: Right of way | Permit status: Warranty na | Completion date: December 15, 2016 | Current use: Right of way | Permit id: Eng2016-02462 | |||||
SCORE 82 My glass probuild - directional bore for fiber optic cable 80. Trench 50. Two hard surface potholes and one soft surface bore pit. Field contact is cj fox @ 719-351-7811. Date: February 14, 2017 Contractor: Emily Guerrero Permit type: Right of way | Permit status: Under warranty | Completion date: January 6, 2017 | Current use: Right of way | Permit id: Eng2016-02600 | |||||
Staging a dumpster in row. Brandon 801-205-7563 Date: February 21, 2017 Permit type: Right of way | Permit status: Warranty na | Completion date: February 3, 2017 | Current use: Right of way | Permit id: Eng2017-00177 | |||||
Installing an isolation valve station for public utilities, see plans. Ken 801-589-9880 Date: March 31, 2017 Permit type: Right of way | Permit status: Under warranty | Completion date: April 30, 2017 | Current use: Right of way | Permit id: Eng2017-00178 | |||||
SCORE 91 Contractor will install (4) 1. 25" hdpe conduits by directional bore across 56 s and (1) bore pit in soft surface. Field contact kelly nielsen-work 801-773-43 ext 224 | mobile 801-628-7232. Date: April 18, 2017 Contractor: Laura Burns Permit type: Right of way | Permit status: Under warranty | Completion date: May 19, 2017 | Current use: Right of way | Permit id: Eng2017-00614 | |||||
SCORE 64 Drawings approved by john miller with slcpud. Approval email attached. Once contractor is selected, they will provide traffic control plan. Date: April 12, 2017 Contractor: Danielle Greene Permit type: Right of way | Permit status: Inspection | Completion date: May 23, 2017 | Current use: Right of way | Permit id: Eng2017-00697 | |||||
Installing concrete cut back parking per plans, see attached plans. Carlos 801-577-8419 Date: May 17, 2017 Permit type: Right of way | Permit status: Inspection | Completion date: June 16, 2017 | Current use: Right of way | Permit id: Eng2017-00963 | |||||
SCORE 56 Install new water and sewer from public way into property. Shawn 801-814-6975 Date: June 13, 2017 Contractor: Sok Tann Bldg #2shawn Durrant Permit type: Right of way | Permit status: Warranty na | Completion date: March 26, 2014 | Current use: Right of way | Permit id: Eng2014-00352 | |||||
SCORE 67 Commercial Date: May 4, 2017 Contractor: Workman Nydeggerrebecca Delis Permit status: Closed | Current use: Commercial | Permit id: Bld2016-03779 | |||||
SCORE 56 Replace windows like for like with retrofit vinyl windows that have a . 32 or better u-value, installed per manufacturers specifications. Date: June 9, 2017 Contractor: Long Windows 9947187jamie Reed Permit type: Residential | Permit status: Closed | Current use: Residential | Permit id: Bld2017-02968 | |||||
SCORE 56 Commercial Date: March 30, 2017 Contractor: Reckitt Benchiserfrank Young Permit status: Closed | Current use: Commercial | Permit id: Bld2017-01225 | |||||
SCORE 56 Administrative interpretation Date: March 12, 2014 Permit status: Closed | Current use: Administrative interpretation | Permit id: Plnzad2014-0013 | |||||
SCORE 56 Preliminary subdiv Date: June 23, 2015 Contractor: Teton Plaza Subdivisiondavid Mortensen Permit status: Closed | Current use: Preliminary subdiv | Permit id: Plnsub2015-0049 | |||||
SCORE 56 Special exception Date: July 6, 2015 Contractor: Google Fiber Hut #135dave Carter Permit status: Closed | Current use: Special exception | Permit id: Plnpcm2015-0053 | |||||
SCORE 56 Lot line adjustment Date: September 11, 2014 Permit status: Closed | Current use: Lot line adjustment | Permit id: Plnsub2014-0060 | |||||
SCORE 56 Special exception Date: August 5, 2014 Contractor: 4217 W Central Nonhard Surfacingtalia Yamamoto Permit status: Closed | Current use: Special exception | Permit id: Plnpcm2014-0051 | |||||
SCORE 56 Special exception Date: April 6, 2015 Contractor: Relocation Of Fencemark Crnich Permit status: Closed | Current use: Special exception | Permit id: Plnpcm2015-0023 | |||||
SCORE 56 Routine and uncontested lot ln Date: January 22, 2014 Contractor: 1818 S 55 West Lot Line Adjustmentlori Jackson Permit status: Closed | Current use: Routine and uncontested lot ln | Permit id: Plnsub2014-0003 | |||||
SCORE 56 Zoning verification letter Date: February 4, 2016 Contractor: Zoning Verification Letterdebbie Cannon Permit status: Closed | Current use: Zoning verification letter | Permit id: Plnzad2016-0008 | |||||
SCORE 56 Final plat approval Date: August 27, 2015 Contractor: Teton Plazadavid Mortensen Permit status: Closed | Current use: Final plat approval | Permit id: Plnsub2015-0068 | |||||
SCORE 56 Re-roof low slope portion of building Date: November 10, 2015 Contractor: Reroof Low Slope Portionangie Bourdos Permit type: Minor alteration | Permit status: Closed | Current use: Minor alteration | Permit id: Plnhlc2015-0093 | |||||
SCORE 56 Appeal admin decision Date: June 16, 2014 Permit status: Closed | Current use: Appeal admin decision | Permit id: Plnapp2014-0039 | |||||
SCORE 65 Zoning verification letter Date: August 15, 2016 Contractor: Zoning Verification Letteramanda Roe Permit status: Closed | Current use: Zoning verification letter | Permit id: Plnzad2016-0063 | |||||
SCORE 56 Special exception Date: February 14, 2017 Contractor: Specialex M1 Nonhard Surface Lottony Sieverts Permit status: Closed | Current use: Special exception | Permit id: Plnpcm2017-0010 | |||||
SCORE 56 Consolidation Date: April 19, 2017 Contractor: Lot Consolidationtony Sieverts Permit status: Closed | Current use: Consolidation | Permit id: Plnsub2017-0029 | |||||
SCORE 56 Preliminary subdiv Date: April 13, 2017 Contractor: Preliminary Subdivisiontyler Buswell Permit status: Additional information | Current use: Preliminary subdiv | Permit id: Plnsub2017-0027 | |||||
SCORE 59 Install all finishes in "white box" condo which was partially completed by okland construction in 2011 Date: March 4, 2016 Contractor: 99 W South Temple 2705joseph Scott Permit type: Residential | Permit status: Inspections | Current use: Residential | Permit id: Bld2016-01676 | |||||
SCORE 59 Complete construction of "white box" condo completed by okland construction in 2011 Date: March 4, 2016 Contractor: 99 W South Temple 2704joseph Scott Permit type: Residential | Permit status: Inspections | Current use: Residential | Permit id: Bld2016-01675 | |||||
SCORE 67 Commercial Date: June 28, 2017 Permit status: Closed | Current use: Commercial | Permit id: Bld2016-06670 | |||||
SCORE 56 Commercial Date: December 5, 2017 Contractor: Reckit Benckiser Manufacturingjerimiah Carter Permit status: Closed | Current use: Commercial | Permit id: Bld2017-09568 | |||||
SCORE 89 Job #n. 288355; trench bore duct boc, thru asphalt roadway under drainage canal, across road & boc, install 3 hhs & 4 peds (dig 7 soft surface pits, 2 hard; dig 2 soft surface pot holes); dpu john miller approved 12 1 2017; project admin=rod 801-259-9554 Date: December 1, 2017 Contractor: Karen Jensen Permit type: Right of way | Permit status: Inspection | Completion date: December 22, 2017 | Current use: Right of way | Permit id: Eng2017-02365 | |||||
SCORE 56 Finish build out: plumbing finishes (incl plan test), cabinetry, doors, woodwork and hardware, floor coverings, ceramic tile, stone slabs, fireplace surround, bath fixtures, and finish appliances. Date: September 11, 2017 Contractor: 99west Unit 2604joseph Scott Permit type: Residential | Permit status: Void | Current use: Residential | Permit id: Bld2017-06355 | |||||
SCORE 59 Install new drive approach per plans also working on drainage swale. Greg 801-602-6784 Date: April 11, 2014 Contractor: Greg Peterson Permit type: Right of way | Permit status: Passed warranty | Completion date: April 16, 2014 | Current use: Right of way | Permit id: Eng2014-00480 | |||||
SCORE 56 Commercial Date: November 30, 2017 Contractor: Costa Vida At City Creekdavid Morley Permit status: Closed | Current use: Commercial | Permit id: Bld2017-02749 | |||||
SCORE 65 Commercial Date: July 3, 2017 Contractor: Wtc Patiojohn Erickson Permit status: Closed | Current use: Commercial | Permit id: Bld2016-08228 | |||||
SCORE 59 Final plat approval Date: November 8, 2017 Contractor: Final Plattyler Buswell Permit status: Active | Current use: Final plat approval | Permit id: Plnsub2017-0092 | |||||
SCORE 89 Perform approx 34 pot holes on down the middle of road , existing utilties to gather depths and locations questar gas cardno tbe kurtis 801-324-3071 Date: September 19, 2014 Contractor: Jay Gordet Permit type: Right of way | Permit status: Passed warranty | Completion date: September 19, 2014 | Current use: Right of way | Permit id: Eng2014-01287 | |||||
SCORE 56 Zoning amendment Date: November 3, 2017 Contractor: Map Amendmentmason Laycock Permit status: Active | Current use: Zoning amendment | Permit id: Plnpcm2017-0091 | |||||
Installing concrete cut back parking per plans, see attached plans. Carlos 801-577-8419 -extended permit for a week for asphalt patch (josh) Date: July 6, 2017 Permit type: Right of way | Permit status: Under warranty | Completion date: June 23, 2017 | Current use: Right of way | Permit id: Eng2017-00963 | |||||
SCORE 56 Existing white box unit. Demolition & relocation of some interior walls. Changing some plumbing locations. Adding lights. Installing all finishes. Date: September 11, 2017 Contractor: 99west Unit 3002joseph Scott Permit type: Residential | Permit status: Void | Current use: Residential | Permit id: Bld2017-06353 | |||||
SCORE 56 Preliminary subdiv Date: November 1, 2017 Contractor: 99 West 7th Amendment Preliminarytyler Buswell Permit status: Closed | Current use: Preliminary subdiv | Permit id: Plnsub2017-0090 | |||||
SCORE 56 Preliminary subdiv Date: December 1, 2017 Contractor: 99 West 8th Amendmentjennifer Nishiguchi Permit status: Active | Current use: Preliminary subdiv | Permit id: Plnsub2017-0100 | |||||
SCORE 59 Zoning verification letter Date: November 2, 2017 Contractor: Lettersheneetra Scroggins Permit status: Closed | Current use: Zoning verification letter | Permit id: Plnzad2017-0090 | |||||
SCORE 56 Commercial Date: September 14, 2017 Contractor: Rb Manufacturingbill Souvall Permit status: Inspections | Current use: Commercial | Permit id: Bld2017-08101 | |||||
SCORE 56 Commercial Date: November 16, 2017 Contractor: E South Temple 3rd Flr #300brett Beal Permit status: Inspections | Current use: Commercial | Permit id: Bld2017-10270 | |||||
SCORE 56 Commercial Date: December 15, 2017 Contractor: 2002 S 50 Wdavid Richardson Permit status: Inspections | Current use: Commercial | Permit id: Bld2017-11237 | |||||
SCORE 56 Conditional use Date: June 27, 2017 Permit status: Closed | Current use: Conditional use | Permit id: Plnpcm2017-0050 | |||||
SCORE 56 Final plat approval Date: October 10, 2017 Contractor: Unit Combinationtyler Buswell Permit status: Active | Current use: Final plat approval | Permit id: Plnsub2017-0083 | |||||
SCORE 56 Commercial Date: November 17, 2017 Contractor: Common Area Remodel9th Floordarrick Porter Permit status: Closed | Current use: Commercial | Permit id: Bld2017-05709 | |||||
Install bike rack for jimmy johns. (6 racks 8 holes per rack). Perry 801-301-8978 Date: October 18, 2017 Permit type: Right of way | Permit status: Passed warranty | Completion date: November 19, 2014 | Current use: Right of way | Permit id: Eng2014-01689 | |||||
SCORE 65 Commercial Date: August 16, 2017 Contractor: Asphalt Systems Incmarty Furmanski Permit status: Closed | Current use: Commercial | Permit id: Bld2016-11672 | |||||
SCORE 56 Water line repair on shoulder of road. Kieth 801-514-6042 Date: March 21, 2014 Contractor: Kieth Brimley Permit type: Right of way | Permit status: Passed warranty | Completion date: March 21, 2014 | Current use: Right of way | Permit id: Eng2014-00349 | |||||
SCORE 56 Landscaping and paving. Date: June 28, 2017 Contractor: Tony Sieverts Permit type: Right of way | Permit status: Revoked | Completion date: November 1, 2017 | Current use: Right of way | Permit id: Eng2017-01250 | |||||
SCORE 59 Tenant improvement floors 16-18 Date: October 21, 2016 Permit type: Commercial | Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-07643 | |||||
SCORE 67 Commercial Date: August 9, 2017 Contractor: Kirton And Mcconkie T.Idan Strear Permit status: Closed | Current use: Commercial | Permit id: Bld2016-04765 | |||||
SCORE 59 Interior only non-structural demolition Date: January 25, 2017 Contractor: Bank Of Americaesther Gabb Permit type: Commercial | Permit status: Need info | Current use: Commercial | Permit id: Bld2016-08532 | |||||
SCORE 56 Demolition and reconfiguration of walls to combine units 2501, 2502, and 2503. Finish installation of plumbing, electrical, ceramic, woodwork, paint, hardware, etc. Date: October 6, 2017 Contractor: 99west 2501 Ostler Combinationjoseph Scott Permit type: Residential | Permit status: Inspections | Current use: Residential | Permit id: Bld2017-06356 | |||||
SCORE 56 A remodel of the 5th floor for bank of america. Date: September 5, 2017 Contractor: Bank Of America Home Loansryan Garcia Permit type: Commercial | Permit status: Inspections | Current use: Commercial | Permit id: Bld2017-05457 |