Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Copper re-pipe sfd Date: August 24, 2011 Permit type: Plumbing : 80 - acc | Permit status: Permit finaled | Completion date: September 7, 2011 | Permit id: Pds2011-1011-20 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 12, 2016 Contractor: N B Baker Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 28, 2016 | Permit id: Pds2016-Resalt- | |||||
If a re-roof project is proposed, the following specifications apply. Existing roofing material proposed roofing material manufacturer brand and model color (if cool roof required) built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: July 14, 2016 Permit type: Commercial alteration-addn | Permit status: Open | Permit id: Pds2016-Comalt- | |||||
25 sf re-roof for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material concrete tiles proposed roofing material concrete tiles manufacturer boral brand and model sunrise color (if cool roof required) multicolor, crrc product id# 0742-0024 built-up roofing assembly system number per attached listing report (if applicable) no specific exemption from cool roof requirements (if applicable) no required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: July 14, 2016 Value: $14,825 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 29, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 24, 2016 Contractor: A S I Hastings Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 86 Copper re-pipe sfd Date: August 24, 2011 Contractor: Ultimate Builders, Inc Dba Repipe 1 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 7, 2011 | Permit id: Pds2011-1011-20 | |||||
SCORE 98 25 sf re-roof for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material concrete tiles proposed roofing material concrete tiles manufacturer boral brand and model sunrise color (if cool roof required) multicolor, crrc product id# 0742-0024 built-up roofing assembly system number per attached listing report (if applicable) no specific exemption from cool roof requirements (if applicable) no required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 29, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: October 19, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: September 2, 2011 Permit status: Pass | Permit id: Pds2011-1011-20 |