Ward 3 - install network communication devices (ami radios) on existing dc dot owned streetlight pole arms at 1 location as indicated on the list attached. Wr# 33336 (jwgenwright@pepco. Com) Date: October 27, 2014 Client: Potomac Electric Power Company | Permit type: Over head work; pole | Permit id: Pa94149-R1 | |||||
SCORE 96 Ward 3 - install network communication devices (ami radios) on existing dc dot owned streetlight pole arms at 1 location as indicated on the list attached. Wr# 33336 (jwgenwright@pepco. Com) Date: April 9, 2014 Contractor: Potomac Electric Power Company Permit type: Over head work; pole decor (e. G. Banners) | Permit status: Permit expired | Expiration date: October 13, 2014 | Permit id: Pa94149 | |||||
SCORE 96 Ward 3 - install network communication devices (ami radios) on existing dc dot owned streetlight pole arms at 1 location as indicated on the list attached. Wr# 33336 (jwgenwright@pepco. Com) Date: November 3, 2014 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: April 10, 2015 | Permit id: Pa94149-R1 | |||||
SCORE 59 As part of a ddoe corrective action plan, a multi-phase extraction system pilot test is being conducted at this site. The test requires the installation of a pilot test groundwater well, redevelopment of 2 existing groundwater monitoring wells, and installing a 25 of pvc conduit over surface of roadway for the associated sample collection and wiring. The new pilot test well and the proposed pvc conduit will be located in the public space between the existing gasoline pump island and the road in front of 4861 massachusetts ave. Nw. Date: July 16, 2012 Contractor: Rob Speer Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: October 9, 2012 | Permit id: Pa71573-R1 | |||||
SCORE 86 Construction staging area Date: June 13, 2012 Contractor: Ken Guttman Permit status: Expired | Expiration date: November 30, 2012 | Permit id: Pa10060470 | |||||
SCORE 93 Construction staging area Date: June 12, 2015 Contractor: William R. Kahl Permit status: Expired | Expiration date: July 2, 2015 | Permit id: Pa10192757 | |||||
SCORE 93 Construction staging area Contractor: William R. Kahl Permit status: Notpaid | Expiration date: May 30, 2015 | Permit id: 0 | |||||
SCORE 98 Other reserved parking Contractor: Andrew Miller Permit status: Rejected | Expiration date: September 8, 2011 | Permit id: 0 | |||||
SCORE 93 Construction staging area Date: September 23, 2014 Contractor: William R. Kahl Permit status: Expired | Expiration date: March 22, 2015 | Permit id: Pa10133016-R1 | |||||
SCORE 70 Construction staging area Date: September 14, 2016 Contractor: Megan Good Arcadis Permit status: Expired | Expiration date: October 12, 2016 | Permit id: Pa10133016-R5 | |||||
SCORE 70 Construction staging area Date: October 18, 2016 Contractor: Megan Good Arcadis Permit status: Expired | Expiration date: December 31, 2016 | Permit id: Pa10133016-R6 | |||||
SCORE 72 As part of a ddoe corrective action plan, a multi-phase extraction system pilot test is being conducted at this site. The test requires the installation of a pilot test groundwater well, redevelopment of 2 existing groundwater monitoring wells, and installing a 25 of pvc conduit over surface of roadway for the associated sample collection and wiring. The new pilot test well and the proposed pvc conduit will be located in the public space between the existing gasoline pump island and the road in front of 4861 massachusetts ave. Nw. Date: May 29, 2012 Contractor: Amy Bellanca Permit status: Permit expired | Expiration date: August 10, 2012 | Permit id: Pa71573 | |||||
SCORE 93 As part of a ddoe corrective action plan, five injection wells, feet part, in a single transect and two monitoring wells will be constructed in public space. The injection wells will be installed to a depth of approximately 12 feet and will be screened from 7 to 12 feet bgs. The monitoring wells will be installed to a depth of approximately 24 feet and will be screened from to 24 feet bgs. Well installation is required for groundwater treatment at the site. Tcps have been prepared and temporary cones and sineage will be appropriate placed around the work area during work activities. Tcp components will be in place during work active work hours only. Date: October 25, 2013 Contractor: William R. Kahl Permit status: Permit expired | Expiration date: January 2, 2014 | Permit id: Pa87351 | |||||
SCORE 93 Two groundwater extraction wells (mw-11 and mw-12) will be installed to address contaminants of concern in response to discussions with ddoe on december 4, 2013. New extraction well mw-11 will be located in the current location of well iw-1 (see site plan). Existing well iw-1 will be abandoned by over-drilling and new extraction well mw-11 will be installed in the same location. New extraction well mw-12 will be installed in a new location, per the site plan. The wells will have a screen length extending to 25 ft. The wells will be installed to approximately 25 ft and completed to ground surface with a 4" diameter polyvinyl chloride (pvc) wire wrapped 0. 0 slotted screen that will extend from approximately 10-25 ft bgs. The 4" diameter pvc casing will extend from the surface to ft bgs. A no. 1 sand filter pack will be placed around the well screen to approximately 2 ft above the top of the screened interval. At least 2 ft of bentonite slurry or fully hydrated medium-sized bentonite chip Date: May 7, 2014 Contractor: William R. Kahl Permit status: Permit expired | Expiration date: July 17, 2014 | Permit id: Pa92684 | |||||
SCORE 93 Construction staging area Date: April 2, 2014 Contractor: William R. Kahl Permit status: Permit expired | Expiration date: September 23, 2014 | Permit id: Pa10133016 | |||||
SCORE 93 Construction staging area Contractor: William R. Kahl Permit status: Not paid | Expiration date: May 30, 2015 | Permit id: 0 | |||||
SCORE 59 As part of a ddoe corrective action plan, a multi-phase extraction system pilot test is being conducted at this site. The test requires the installation of a pilot test groundwater well, redevelopment of 2 existing groundwater monitoring wells, and installing a 25 of pvc conduit over surface of roadway for the associated sample collection and wiring. The new pilot test well and the proposed pvc conduit will be located in the public space between the existing gasoline pump island and the road in front of 4861 massachusetts ave. Nw. Date: April 26, 2012 Contractor: Rob Speer Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: August 10, 2012 | Permit id: Pa71573 | |||||
SCORE 70 As part of a ddoe corrective action plan, five injection wells, feet part, in a single transect and two monitoring wells will be constructed in public space. The injection wells will be installed to a depth of approximately 12 feet and will be screened from 7 to 12 feet bgs. The monitoring wells will be installed to a depth of approximately 24 feet and will be screened from to 24 feet bgs. Well installation is required for groundwater treatment at the site. Tcps have been prepared and temporary cones and sineage will be appropriate placed around the work area during work activities. Tcp components will be in place during work active work hours only. Date: September 30, 2013 Contractor: Gene Burke Client: Rob Speer | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: January 2, 2014 | Permit id: Pa87351 | |||||
SCORE 70 Two groundwater extraction wells (mw-11 and mw-12) will be installed to address contaminants of concern in response to discussions with ddoe on december 4, 2013. New extraction well mw-11 will be located in the current location of well iw-1 (see site plan). Existing well iw-1 will be abandoned by over-drilling and new extraction well mw-11 will be installed in the same location. New extraction well mw-12 will be installed in a new location, per the site plan. The wells will have a screen length extending to 25 ft. The wells will be installed to approximately 25 ft and completed to ground surface with a 4" diameter polyvinyl chloride (pvc) wire wrapped 0. 0 slotted screen that will extend from approximately 10-25 ft bgs. The 4" diameter pvc casing will extend from the surface to ft bgs. A no. 1 sand filter pack will be placed around the well screen to approximately 2 ft above the top of the screened interval. At least 2 ft of bentonite slurry or fully hydrated medium-sized bentonite chip Date: March 5, 2014 Contractor: Gene Burke Client: Monty Berhane | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: July 17, 2014 | Permit id: Pa92684 | |||||
SCORE 98 Other reserved parking Contractor: Andrew Miller Permit status: Rejected | Expiration date: September 8, 2011 | Permit id: 0 | |||||
SCORE 93 Construction staging area Contractor: William R. Kahl Permit status: Notpaid | Expiration date: May 30, 2015 | Permit id: 0 | |||||
SCORE 93 Construction staging area Date: October 23, 2013 Contractor: William R. Kahl Permit status: Permit expired | Expiration date: April 18, 2014 | Permit id: Pa10116716 | |||||
SCORE 93 Construction staging area Date: March 3, 2015 Contractor: William R. Kahl Permit status: Permit expired | Expiration date: September 18, 2015 | Permit id: Pa10133016-R2 | |||||
SCORE 93 Construction staging area Contractor: William R. Kahl Permit status: Not paid | Expiration date: May 30, 2015 | Permit id: 0 | |||||
SCORE 70 Construction staging area Date: March 1, 2016 Contractor: Megan Good Arcadis Permit status: Permit expired | Expiration date: September 12, 2016 | Permit id: Pa10133016-R4 | |||||
SCORE 70 Construction staging area Date: January 18, 2017 Contractor: Megan Good Arcadis Permit status: Permit expired | Expiration date: June 29, 2017 | Permit id: Pa10133016-R7 |