Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 4861 Massachusetts Avenue Nw Washington Dc As part of a ddoe corrective action plan, a multi-phase extraction system pilot test is being conducted at this site. The test requires the installation of a pilot test groundwater well, redevelopment of 2 existing groundwater monitoring wells, and installing a 25 of pvc conduit over surface of roadway for the associated sample collection and wiring. The new pilot test well and the proposed pvc conduit will be located in the public space between the existing gasoline pump island and the road in front of 4861 massachusetts ave. Nw. Date: July 16, 2012 Contractor: Rob Speer Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: October 9, 2012 | Permit id: Pa71573-R1 | |||||
SCORE 59 4861 Massachusetts Avenue Nw Washington Dc As part of a ddoe corrective action plan, a multi-phase extraction system pilot test is being conducted at this site. The test requires the installation of a pilot test groundwater well, redevelopment of 2 existing groundwater monitoring wells, and installing a 25 of pvc conduit over surface of roadway for the associated sample collection and wiring. The new pilot test well and the proposed pvc conduit will be located in the public space between the existing gasoline pump island and the road in front of 4861 massachusetts ave. Nw. Date: April 26, 2012 Contractor: Rob Speer Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: August 10, 2012 | Permit id: Pa71573 |