SCORE 86 19-25 rockingham street will be a 2 family building with each condo including a basement, 1st floor, 2nd floor, 3rd floor/attic and a deeded yard. Renovation will start with one side of the building (unit 25) and later on will take place on the other side (unit 19). Renovation includes a full gutting of the interior of the building and establishing a firewall between the 2 units that extends all the way to the third floor roof. Fire proofing will take place on the ceiling and on the exterior portion of the roof with new fire proof shingles as recommended by fire code. New sidings will be added. Architectural designs and structural engineering work have been done and drawings are included to demonstrate the work that will take place. All floors are being redesigned. New window positions are added and some are closed. New doors are added as well. Here is a description by floor: -basement: finishing the basement as a storage area to include utility room, laundry room, bathroom, and storag Permit type: Addition/alteration | Completion date: March 30, 2016 | Current use: Two-family | Parcel: 9815 | |||||
SCORE 86 19-25 rockingham street will be a 2 family building with each condo including a basement, 1st floor, 2nd floor, 3rd floor attic and a deeded yard. Renovation will start with one side of the building (unit 25) and later on will take place on the other side (unit 19). Renovation includes a full gutting of the interior of the building and establishing a firewall between the 2 units that extends all the way to the third floor roof. Fire proofing will take place on the ceiling and on the exterior portion of the roof with new fire proof shingles as recommended by fire code. New sidings will be added. Architectural designs and structural engineering work have been done and drawings are included to demonstrate the work that will take place. All floors are being redesigned. New window positions are added and some are closed. New doors are added as well. Here is a description by floor: -basement: finishing the basement as a storage area to include utility room, laundry room, bathroom, and storag Permit type: Addition/alteration | Completion date: March 30, 2016 | Current use: Two-family | Permit id: 0 | Parcel: 9815 |