Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Permit type: Roof | Completion date: March 15, 2016 | Parcel: 23764 | |||||
SCORE 86 Permit type: Roof | Completion date: April 29, 2014 | Parcel: 1734 | |||||
SCORE 86 Permit type: Addition/alteration | Completion date: August 11, 2014 | Current use: One-family | Parcel: 3636 | |||||
SCORE 86 Permit type: Roof | Completion date: July 21, 2015 | Parcel: 7789 | |||||
SCORE 86 Permit type: Roof | Completion date: July 24, 2015 | Parcel: 20648 | |||||
SCORE 86 Permit type: Roof | Completion date: August 19, 2015 | Parcel: 20680 | |||||
SCORE 86 Clinton St Cambridge, Ma Strip asphalt shingle roof and install 12 sq of slate roofing and put rubber on flat sections Permit type: Roof | Completion date: November 6, 2015 | Parcel: 1185 | |||||
SCORE 86 25 Rockingham St Cambridge, Ma 19-25 rockingham street will be a 2 family building with each condo including a basement, 1st floor, 2nd floor, 3rd floor/attic and a deeded yard. Renovation will start with one side of the building (unit 25) and later on will take place on the other side (unit 19). Renovation includes a full gutting of the interior of the building and establishing a firewall between the 2 units that extends all the way to the third floor roof. Fire proofing will take place on the ceiling and on the exterior portion of the roof with new fire proof shingles as recommended by fire code. New sidings will be added. Architectural designs and structural engineering work have been done and drawings are included to demonstrate the work that will take place. All floors are being redesigned. New window positions are added and some are closed. New doors are added as well. Here is a description by floor: -basement: finishing the basement as a storage area to include utility room, laundry room, bathroom, and storag Permit type: Addition/alteration | Completion date: March 30, 2016 | Current use: Two-family | Parcel: 9815 | |||||
SCORE 86 25 Rockingham St Cambridge, Ma 19-25 rockingham street will be a 2 family building with each condo including a basement, 1st floor, 2nd floor, 3rd floor attic and a deeded yard. Renovation will start with one side of the building (unit 25) and later on will take place on the other side (unit 19). Renovation includes a full gutting of the interior of the building and establishing a firewall between the 2 units that extends all the way to the third floor roof. Fire proofing will take place on the ceiling and on the exterior portion of the roof with new fire proof shingles as recommended by fire code. New sidings will be added. Architectural designs and structural engineering work have been done and drawings are included to demonstrate the work that will take place. All floors are being redesigned. New window positions are added and some are closed. New doors are added as well. Here is a description by floor: -basement: finishing the basement as a storage area to include utility room, laundry room, bathroom, and storag Permit type: Addition/alteration | Completion date: March 30, 2016 | Current use: Two-family | Permit id: 0 | Parcel: 9815 | |||||
SCORE 86 46 Gold Star Rd Cambridge, Ma Scrape and remove all exiting asphalt composition shingles and drip edges and install new architectural shingle Permit type: Roof | Completion date: April 14, 2016 | Permit id: 0 | Parcel: 184119 | |||||
SCORE 86 Permit type: Addition/alteration | Completion date: June 20, 2016 | Current use: Two-family | Permit id: 0 | Parcel: 149110 | |||||
SCORE 86 17 Woodbridge St Cambridge, Ma Attic remodeling demolation: remove wall paneling, remove all sheetrock to the studs on interior wall (adjacent to bathroom, relocate closet wall. Installation finish: design a dedicated laundry area, blueboard all walls, plaster all walls. Permit type: Addition/alteration | Completion date: August 2, 2016 | Current use: Two-family | Permit id: 0 | Parcel: 183107 |