Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Tenant improvement to existing 2 suites 7357 sq ft building with new additions of 98 sq ft for a total of 7455 sf - to create 2 suites (vacant) tenants to do their own tis, removing 212 lineal feet of interiot paritions from existing and add ing 6 new exterior doors. Add new 12 amp elec panel and add house meter for exterior lights. New suites as follows suite 1 - 1753 sq ft suite existing retail, adding 36 sq ft pop out drive thru window- and adding 61 lineal feet of interior partitions and 71 lineal feet of demising wall. New 43 sq ft front door (tenant to do ti) for a total of 1789 sq ft suite 2 --5485 sq ft - adding 62 sq ft for (fill in pop out) and lineal feet of demising wall for a total of 5547 and electrical room ft 9-16-2011 plan change removing hvac, electrical panel b c & e removed and the gas line to feed are not being done. 8 24 11 - add testing power per jra. Valid for days. Tgb 08 18 11 plan change add elec see c of a... Vmd 6- Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: September 20, 2011 | Permit id: Pds2011-1019-20 | |||||
SCORE 93 Tenant improvement to existing 2 suites 7357 sq ft building with new additions of 98 sq ft for a total of 7455 sf - to create 2 suites (vacant) tenants to do their own tis, removing 212 lineal feet of interiot paritions from existing and add ing 6 new exterior doors. New suites as follows suite 1 - 1753 sq ft suite existing retail, adding 36 sq ft pop out drive thru window- and adding 61 lineal feet of interior partitions and 71 lineal feet of demising wall. New 43 sq ft front door (tenant to do ti) (no epm) for a total of 1789 sq ft suite 2 --5485 sq ft - adding 62 sq ft for (fill in pop out) and lineal feet of demising wall for a total of 5547 (no epm) and electrical room ft 5-11-2011 - plan change to adjust sq footages. Vam 04. 28. 2011 plan change see conditions of approval.. Lhg Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: May 11, 2011 | Permit id: Pds2010-1017-20 | |||||
Final Date: September 16, 2011 Permit status: Pass | Permit id: Pds2011-1019-20 |