Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
16 sf re-roof (hra) for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material: built up proposed roofing material: built up manufacturer: polyglass icc-esr 2018 brand and model: n a color (if cool roof required): white built-up roofing assembly system number per attached listing report (if applicable):n a specific exemption from cool roof requirements (if applicable): no ducts in attic required building inspector field verification (if applicable): yes note: self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: May 27, 2015 Value: $9,488 Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: June 22, 2015 | Permit id: Pds2015-Resalt- | |||||
16 sf re-roof () for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material built up proposed roofing material built up manufacturer polyglass icc-esr 2018 brand and model n/a color (if cool roof required) white built-up roofing assembly system number per attached listing report (if applicable) n/a specific exemption from cool roof requirements (if applicable) no ducts in attic required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: May 27, 2015 Value: $9,488 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 22, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 86 16 sf re-roof () for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material built up proposed roofing material built up manufacturer polyglass icc-esr 2018 brand and model n a color (if cool roof required) white built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) no ducts in attic required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 22, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: June 18, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |