Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 9. 24 kw pv system on roof. Panel change. Date: July 16, 2015 Contractor: Solterra Systems Permit type: Electrical | Permit status: Permit closed | Completion date: August 18, 2015 | Expiration date: July 15, 2016 | Current use: Single family / duplex | Permit id: 6484892 | |||||
SCORE 100 Kitchen, entry, bathroom remodel. Some extra lights added in dining room and living room. Date: February 21, 2005 Contractor: Definitive Electric Permit type: Electrical | Permit status: Permit finaled | Completion date: June 3, 2005 | Expiration date: February 21, 2006 | Current use: Single family / duplex | Permit id: 6052371 | |||||
SCORE 96 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 9. 24 kw pv system on roof. Panel change. Date: July 16, 2015 Contractor: Earl Childs Permit type: Electrical | Permit status: Permit closed | Completion date: August 18, 2015 | Expiration date: July 15, 2016 | Current use: Single family / duplex | Permit id: 6484892 | |||||
Repair an existing pier per subject to field inspection (stfi) Date: December 11, 2017 Value: $7,296 Applicant: Wehr, Evan | Permit type: Construction | Permit status: Permit issued | Expiration date: June 11, 2019 | Current use: Single family / duplex | Permit id: 6610558 |