Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Interior remodel for officewarehouse for shimadzu Permit type: Mechanical permit | Permit status: Final | Completion date: July 20, 2000 | Expiration date: July 20, 2000 | Permit id: 2000-0163 Mp | |||||
SCORE 100 Interior remodel for officeproduction Permit type: Mechanical permit | Permit status: Final | Completion date: April 30, 2001 | Expiration date: April 30, 2001 | Permit id: 2001-017406 Mp | |||||
SCORE 100 Move existing gas line Permit type: Plumbing permit | Permit status: Void | Completion date: March 28, 2001 | Expiration date: April 8, 2001 | Permit id: 2000-0170 Pp | |||||
SCORE 100 Hvac replacement like for like only Date: May 20, 2015 Contractor: Wayne Harrel Permit type: Mechanical permit | Permit status: Expired | Expiration date: November 16, 2015 | Permit id: 2015-060467 Mp | |||||
SCORE 100 Replacing service disconnect only Date: December 16, 2009 Contractor: Sherman Debusk Permit type: Electrical permit | Permit status: Final | Completion date: December 17, 2009 | Expiration date: December 17, 2009 | Permit id: 2009-1372 Ep | |||||
SCORE 100 Interior remodel for adm and bus office Permit type: Mechanical permit | Permit status: Final | Completion date: June 13, 2000 | Expiration date: June 13, 2000 | Permit id: 2000-016034 Mp | |||||
SCORE 100 Change of use and interior remodel from personal improvement services to officewarehouse omnicare Permit type: Mechanical permit | Permit status: Final | Completion date: January 3, 2005 | Expiration date: January 3, 2005 | Permit id: 2004-020733 Mp | |||||
SCORE 100 Interior remodel to existing office warehouse Applicant Phone: (512) 238-9512 | Permit type: Building permit | Permit status: Final | Completion date: January 25, 2010 | Expiration date: January 25, 2010 | Permit id: 2009-137611 Bp | |||||
SCORE 100 Interior remodel to existing office warehouse Date: December 21, 2009 Contractor: Tim Moll Permit type: Electrical permit | Permit status: Final | Completion date: January 15, 2010 | Expiration date: January 15, 2010 | Permit id: 2009-137611 Ep | |||||
SCORE 99 Interior remodel to existing office warehouse Date: December 21, 2009 Contractor: David Schimsk Permit type: Mechanical permit | Permit status: Final | Completion date: January 19, 2010 | Expiration date: January 19, 2010 | Permit id: 2009-137611 Mp | |||||
SCORE 100 Interior remodel to existing office warehouse Date: December 31, 2009 Contractor: Luis Manuel Hernandez Sr Permit type: Plumbing permit | Permit status: Final | Completion date: January 21, 2010 | Expiration date: January 21, 2010 | Permit id: 2009-137611 Pp | |||||
SCORE 98 Upgrade elec srv to existing comm bldg Permit type: Electrical permit | Permit status: Final | Completion date: July 3, 2001 | Expiration date: July 3, 2001 | Permit id: 2001-011449 Ep | |||||
SCORE 95 Replace water heater to exist suite like for like Date: June 13, 2013 Contractor: Jose Rodriguez Permit type: Plumbing permit | Permit status: Final | Completion date: June 18, 2013 | Expiration date: June 18, 2013 | Permit id: 2013-061729 Pp | |||||
SCORE 61 Interior remodel to existing lt manuf Applicant Phone: 512 | Permit type: Building permit | Permit status: Final | Completion date: June 19, 2012 | Expiration date: June 19, 2012 | Permit id: 2012-027091 Bp | |||||
SCORE 100 Interior remodel to existing lt manuf Date: April 5, 2012 Contractor: Roger Vaughan Permit type: Electrical permit | Permit status: Final | Completion date: May 2, 2012 | Expiration date: May 2, 2012 | Permit id: 2012-027091 Ep | |||||
SCORE 96 Interior remodel to existing lt manuf Date: March 29, 2012 Contractor: Edward A Foy Permit type: Mechanical permit | Permit status: Final | Completion date: May 9, 2012 | Expiration date: May 9, 2012 | Permit id: 2012-027091 Mp | |||||
SCORE 100 Interior remodel to existing lt manuf Date: April 25, 2012 Contractor: Victor A. Barrera Jr Permit type: Plumbing permit | Permit status: Final | Completion date: June 5, 2012 | Expiration date: June 5, 2012 | Permit id: 2012-027091 Pp | |||||
SCORE 100 Electrical service upgrade to existing residence Date: February 22, 2012 Contractor: Sherman Debusk Permit type: Electrical permit | Permit status: Final | Completion date: March 22, 2012 | Expiration date: March 22, 2012 | Permit id: 2012-017109 Ep | |||||
SCORE 91 Run pipe pull wire and install 6 disconnect to exsting comm bdlg only Date: June 27, 2012 Contractor: Billy E Mooneyham Permit type: Electrical permit | Permit status: Final | Completion date: July 9, 2012 | Expiration date: July 9, 2012 | Permit id: 2012-064598 Ep | |||||
SCORE 91 Temp hook up electric for fork lift battery charger only to existing residence refer 2012027091bp Date: March 27, 2012 Contractor: Billy E Mooneyham Permit type: Electrical permit | Permit status: Final | Completion date: April 5, 2012 | Expiration date: April 5, 2012 | Permit id: 2012-029284 Ep | |||||
SCORE 100 Interior remodel to existing lt manuf Date: April 25, 2012 Contractor: Victor A. Barrera Jr Permit type: Plumbing permit | Permit status: Final | Completion date: June 5, 2012 | Expiration date: June 5, 2012 | Permit id: 2012-027091 Pp | |||||
SCORE 61 Interior remodel to existing lt manuf Applicant Phone: 512 | Permit type: Building permit | Permit status: Final | Completion date: June 19, 2012 | Expiration date: June 19, 2012 | Permit id: 2012-027091 Bp | |||||
SCORE 100 Interior remodel to existing lt manuf Date: April 5, 2012 Contractor: Roger Vaughan Permit type: Electrical permit | Permit status: Final | Completion date: May 2, 2012 | Expiration date: May 2, 2012 | Permit id: 2012-027091 Ep | |||||
SCORE 96 Interior remodel to existing lt manuf Date: March 29, 2012 Contractor: Edward A Foy Permit type: Mechanical permit | Permit status: Final | Completion date: May 9, 2012 | Expiration date: May 9, 2012 | Permit id: 2012-027091 Mp | |||||
SCORE 95 Replace like for like hvac roof top units Date: October 18, 2016 Contractor: Michael J Rocco Ii Permit type: Mechanical permit | Permit status: Expired | Expiration date: April 16, 2017 | Permit id: 2016-126619 Mp | |||||
SCORE 91 Run pipe pull wire and install 6 disconnect to exsting comm bdlg only Date: June 27, 2012 Contractor: Billy E Mooneyham Permit type: Electrical permit | Permit status: Final | Completion date: July 9, 2012 | Expiration date: July 9, 2012 | Permit id: 2012-064598 Ep | |||||
SCORE 100 Electrical service upgrade to existing residence Date: February 22, 2012 Contractor: Sherman Debusk Permit type: Electrical permit | Permit status: Final | Completion date: March 22, 2012 | Expiration date: March 22, 2012 | Permit id: 2012-017109 Ep | |||||
SCORE 95 Replace water heater to exist suite like for like Date: June 13, 2013 Contractor: Jose Rodriguez Permit type: Plumbing permit | Permit status: Final | Completion date: June 18, 2013 | Expiration date: June 18, 2013 | Permit id: 2013-061729 Pp | |||||
SCORE 98 Upgrade elec srv to existing comm bldg Permit type: Electrical permit | Permit status: Final | Completion date: July 3, 2001 | Expiration date: July 3, 2001 | Permit id: 2001-011449 Ep | |||||
SCORE 100 Hvac replacment to existing commercial only like for like Date: October 25, 2016 Contractor: Michael L. Smith Permit type: Mechanical permit | Permit status: Final | Completion date: November 4, 2016 | Expiration date: November 4, 2016 | Permit id: 2016-130688 Mp | |||||
SCORE 100 Hvac replacement like for like only Date: May 20, 2015 Contractor: Wayne Harrel Permit type: Mechanical permit | Permit status: Expired | Expiration date: November 16, 2015 | Permit id: 2015-060467 Mp | |||||
SCORE 100 Interior remodel for adm and bus office Permit type: Mechanical permit | Permit status: Final | Completion date: June 13, 2000 | Expiration date: June 13, 2000 | Permit id: 2000-016034 Mp | |||||
SCORE 100 Change of use and interior remodel from personal improvement services to officewarehouse omnicare Permit type: Mechanical permit | Permit status: Final | Completion date: January 3, 2005 | Expiration date: January 3, 2005 | Permit id: 2004-020733 Mp | |||||
SCORE 100 Replacing service disconnect only Date: December 16, 2009 Contractor: Sherman Debusk Permit type: Electrical permit | Permit status: Final | Completion date: December 17, 2009 | Expiration date: December 17, 2009 | Permit id: 2009-1372 Ep | |||||
SCORE 100 Interior remodel for officewarehouse for shimadzu Permit type: Mechanical permit | Permit status: Final | Completion date: July 20, 2000 | Expiration date: July 20, 2000 | Permit id: 2000-0163 Mp | |||||
SCORE 100 Interior remodel for officeproduction Permit type: Mechanical permit | Permit status: Final | Completion date: April 30, 2001 | Expiration date: April 30, 2001 | Permit id: 2001-017406 Mp | |||||
SCORE 100 Move existing gas line Permit type: Plumbing permit | Permit status: Void | Completion date: March 28, 2001 | Expiration date: April 8, 2001 | Permit id: 2000-0170 Pp | |||||
SCORE 100 Interior remodel to existing office warehouse Date: December 21, 2009 Contractor: Tim Moll Permit type: Electrical permit | Permit status: Final | Completion date: January 15, 2010 | Expiration date: January 15, 2010 | Permit id: 2009-137611 Ep | |||||
SCORE 99 Interior remodel to existing office warehouse Date: December 21, 2009 Contractor: David Schimsk Permit type: Mechanical permit | Permit status: Final | Completion date: January 19, 2010 | Expiration date: January 19, 2010 | Permit id: 2009-137611 Mp | |||||
SCORE 100 Interior remodel to existing office warehouse Date: December 31, 2009 Contractor: Luis Manuel Hernandez, Sr Permit type: Plumbing permit | Permit status: Final | Completion date: January 21, 2010 | Expiration date: January 21, 2010 | Permit id: 2009-137611 Pp | |||||
SCORE 100 Interior remodel to existing office warehouse Applicant Phone: (512) 238-9512 | Permit type: Building permit | Permit status: Final | Completion date: January 25, 2010 | Expiration date: January 25, 2010 | Permit id: 2009-137611 Bp | |||||
SCORE 100 Interior remodel to existing lt manuf Date: April 25, 2012 Contractor: Victor A. Barrera Jr Permit type: Plumbing permit | Permit status: Final | Completion date: June 5, 2012 | Expiration date: June 5, 2012 | Permit id: 2012-027091 Pp | |||||
SCORE 96 Interior remodel to existing lt manuf Date: March 29, 2012 Contractor: Edward A Foy Permit type: Mechanical permit | Permit status: Final | Completion date: May 9, 2012 | Expiration date: May 9, 2012 | Permit id: 2012-027091 Mp | |||||
SCORE 61 Interior remodel to existing lt manuf Applicant Phone: 512 | Permit type: Building permit | Permit status: Final | Completion date: June 19, 2012 | Expiration date: June 19, 2012 | Permit id: 2012-027091 Bp | |||||
SCORE 100 Interior remodel to existing lt manuf Date: April 5, 2012 Contractor: Roger Vaughan Permit type: Electrical permit | Permit status: Final | Completion date: May 2, 2012 | Expiration date: May 2, 2012 | Permit id: 2012-027091 Ep | |||||
SCORE 100 Hvac replacement like for like only Date: May 20, 2015 Contractor: Wayne Harrel Permit type: Mechanical permit | Permit status: Expired | Expiration date: November 16, 2015 | Permit id: 2015-060467 Mp | |||||
SCORE 100 Interior remodel for adm and bus office Permit type: Mechanical permit | Permit status: Final | Completion date: June 13, 2000 | Expiration date: June 13, 2000 | Permit id: 2000-016034 Mp | |||||
SCORE 100 Replacing service disconnect only Date: December 16, 2009 Contractor: Sherman Debusk Permit type: Electrical permit | Permit status: Final | Completion date: December 17, 2009 | Expiration date: December 17, 2009 | Permit id: 2009-1372 Ep | |||||
SCORE 100 Hvac replacment to existing commercial only like for like Date: October 25, 2016 Contractor: Michael L. Smith Permit type: Mechanical permit | Permit status: Final | Completion date: November 4, 2016 | Expiration date: November 4, 2016 | Permit id: 2016-130688 Mp | |||||
SCORE 100 Change of use and interior remodel from personal improvement services to officewarehouse omnicare Permit type: Mechanical permit | Permit status: Final | Completion date: January 3, 2005 | Expiration date: January 3, 2005 | Permit id: 2004-020733 Mp | |||||
SCORE 95 Replace like for like hvac roof top units Date: October 18, 2016 Contractor: Michael J Rocco Ii Permit type: Mechanical permit | Permit status: Expired | Expiration date: April 16, 2017 | Permit id: 2016-126619 Mp | |||||
SCORE 91 Run pipe pull wire and install 6 disconnect to exsting comm bdlg only Date: June 27, 2012 Contractor: Billy E Mooneyham Permit type: Electrical permit | Permit status: Final | Completion date: July 9, 2012 | Expiration date: July 9, 2012 | Permit id: 2012-064598 Ep | |||||
SCORE 100 Electrical service upgrade to existing residence Date: February 22, 2012 Contractor: Sherman Debusk Permit type: Electrical permit | Permit status: Final | Completion date: March 22, 2012 | Expiration date: March 22, 2012 | Permit id: 2012-017109 Ep | |||||
SCORE 100 Interior remodel for officewarehouse for shimadzu Permit type: Mechanical permit | Permit status: Final | Completion date: July 20, 2000 | Expiration date: July 20, 2000 | Permit id: 2000-0163 Mp | |||||
SCORE 100 Interior remodel for officeproduction Permit type: Mechanical permit | Permit status: Final | Completion date: April 30, 2001 | Expiration date: April 30, 2001 | Permit id: 2001-017406 Mp | |||||
SCORE 100 Move existing gas line Permit type: Plumbing permit | Permit status: Void | Completion date: March 28, 2001 | Expiration date: April 8, 2001 | Permit id: 2000-0170 Pp | |||||
SCORE 100 Interior remodel to existing office warehouse Date: December 21, 2009 Contractor: Tim Moll Permit type: Electrical permit | Permit status: Final | Completion date: January 15, 2010 | Expiration date: January 15, 2010 | Permit id: 2009-137611 Ep | |||||
SCORE 99 Interior remodel to existing office warehouse Date: December 21, 2009 Contractor: David Schimsk Permit type: Mechanical permit | Permit status: Final | Completion date: January 19, 2010 | Expiration date: January 19, 2010 | Permit id: 2009-137611 Mp | |||||
SCORE 100 Interior remodel to existing office warehouse Date: December 31, 2009 Contractor: Luis Manuel Hernandez, Sr Permit type: Plumbing permit | Permit status: Final | Completion date: January 21, 2010 | Expiration date: January 21, 2010 | Permit id: 2009-137611 Pp | |||||
SCORE 100 Interior remodel to existing office warehouse Applicant Phone: (512) 238-9512 | Permit type: Building permit | Permit status: Final | Completion date: January 25, 2010 | Expiration date: January 25, 2010 | Permit id: 2009-137611 Bp | |||||
SCORE 91 Temp hook up electric for fork lift battery charger only to existing residence refer 2012027091bp Date: March 27, 2012 Contractor: Billy E Mooneyham Permit type: Electrical permit | Permit status: Final | Completion date: April 5, 2012 | Expiration date: April 5, 2012 | Permit id: 2012-029284 Ep | |||||
SCORE 95 Replace water heater to exist suite like for like Date: June 13, 2013 Contractor: Jose Rodriguez Permit type: Plumbing permit | Permit status: Final | Completion date: June 18, 2013 | Expiration date: June 18, 2013 | Permit id: 2013-061729 Pp | |||||
SCORE 98 Upgrade elec srv to existing comm bldg Permit type: Electrical permit | Permit status: Final | Completion date: July 3, 2001 | Expiration date: July 3, 2001 | Permit id: 2001-011449 Ep | |||||
SCORE 100 Replace damaged block in service gutter only Date: December 8, 2014 Contractor: Rick J. Reardon Permit type: Electrical permit | Permit status: Final | Completion date: December 12, 2014 | Expiration date: December 12, 2014 | Permit id: 2014-130306 Ep | |||||
SCORE 100 Replace damaged electrical service gutter to existing commerical only Date: March 15, 2016 Contractor: Rick J. Reardon Permit type: Electrical permit | Permit status: Final | Completion date: April 4, 2016 | Expiration date: April 4, 2016 | Permit id: 2016-029132 Ep | |||||
New shell officewarehouse Date: April 3, 1996 Value: $1,100,000 Permit type: Mechanical permit | Permit status: Final | Completion date: September 13, 1996 | Expiration date: August 29, 2007 | Permit id: 1996-007282 Mp | |||||
Temporary construction trailer max 6mths Date: May 17, 1996 Permit type: Mechanical permit | Permit status: Void | Completion date: November 13, 1996 | Expiration date: August 29, 2007 | Permit id: 1996-010743 Mp | |||||
Tenant finish for officemanufacturing Date: March 21, 1997 Value: $120,000 Permit type: Mechanical permit | Permit status: Final | Completion date: June 2, 1997 | Expiration date: June 2, 1997 | Permit id: 1997-000263 Mp | |||||
Finishout for officewarehouse Date: December 5, 1997 Value: $85,700 Permit type: Mechanical permit | Permit status: Final | Completion date: January 29, 1998 | Expiration date: January 29, 1998 | Permit id: 1997-010791 Mp | |||||
Add elec gutter junction box Date: May 5, 1999 Value: $2,000 Permit type: Mechanical permit | Permit status: Void | Completion date: November 1, 1999 | Expiration date: November 7, 1999 | Permit id: 1999-010282 Mp | |||||
Emergency repair to house service Date: February 28, 1997 Value: $400 Permit type: Mechanical permit | Permit status: Final | Completion date: February 28, 1997 | Expiration date: August 29, 2007 | Permit id: 1997-0007 Mp | |||||
Finish out officewhse Date: May 8, 1997 Value: $65,000 Permit type: Mechanical permit | Permit status: Final | Completion date: June 5, 1997 | Expiration date: June 5, 1997 | Permit id: 1997-008878 Mp | |||||
Finishout for officewarehouse Date: June 11, 1997 Value: $158,000 Permit type: Mechanical permit | Permit status: Void | Completion date: December 8, 1997 | Expiration date: December 10, 1997 | Permit id: 1997-015445 Mp | |||||
Finish out for austin dance studio Date: April 1, 1999 Value: $164,800 Permit type: Mechanical permit | Permit status: Final | Completion date: June 16, 1999 | Expiration date: December 19, 1999 | Permit id: 1999-000462 Mp | |||||
Finish out for dpt Date: June 28, 1999 Value: $118,050 Permit type: Mechanical permit | Permit status: Final | Completion date: October 4, 1999 | Expiration date: October 4, 1999 | Permit id: 1999-013566 Mp | |||||
SCORE 99 New shell officewarehouse Permit type: Plumbing permit | Permit status: Final | Completion date: November 9, 2007 | Expiration date: November 9, 2007 | Permit id: 2007-000269 Pp | |||||
Interior demolition nonstructural Date: February 23, 1999 Value: $4,500 Permit type: Building permit | Permit status: Void | Completion date: August 22, 1999 | Expiration date: October 25, 1999 | Permit id: 1999-012929 Bp | |||||
SCORE 99 Reparing exst elec gutter at main bldg only Permit type: Electrical permit | Permit status: Void | Expiration date: September 12, 2006 | Permit id: 2006-0055 Ep | |||||
SCORE 74 New shell officewarehouse Permit type: Electrical permit | Permit status: Final | Completion date: December 7, 2007 | Expiration date: December 7, 2007 | Permit id: 2007-000269 Ep | |||||
SCORE 83 Interior remodel to existing officewarehouse to create two suites suite 1 and suite 101 Applicant Phone: (512) 801-0684 | Permit type: Building permit | Permit status: Expired | Expiration date: February 1, 2016 | Permit id: 2015-005213 Bp | |||||
SCORE 74 Install fireline and water wastewater Date: March 16, 2007 Contractor: Barton Oaks Plaza Iv Permit type: Plumbing permit | Permit status: Final | Completion date: October 18, 2007 | Expiration date: October 18, 2007 | Permit id: 2007-1068 Pp | |||||
SCORE 100 Temp power loop to commercial bldg Date: March 21, 2007 Contractor: Jerry L Roudebush Permit type: Electrical permit | Permit status: Final | Completion date: April 10, 2007 | Expiration date: February 2, 2008 | Permit id: 2007-107931 Ep | |||||
SCORE 74 Install 2 backflow preventers for irrigations system for buildings b c only Date: September 11, 2007 Contractor: Barton Oaks Plaza Iv Permit type: Plumbing permit | Permit status: Void | Expiration date: July 13, 2008 | Permit id: 2007-150297 Pp | |||||
Install irrigation system to exst comm backflow preventor only Date: December 5, 2007 Permit type: Plumbing permit | Permit status: Final | Completion date: December 7, 2007 | Expiration date: December 7, 2007 | Permit id: 2007-169701 Pp |