Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Boiler Date: February 8, 2012 Client: District Of Columbia | Applicant: George Hurst | Permit status: Permit issued | Permit id: Fb1200057 | |||||
A dc public charter school building a temporary construction entrance on a former dcps site. Date: December 11, 2014 Client: District Of Columbia | Applicant: District Of Columbia | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1502267 | |||||
We propose drilling seven, six-inch diameter geotechnical test borings using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be eight feet below the existing ground surface. Drilling equipment will be decontaminated between each hole to avoid cross contamination throughout the site. Upon completion, the geotechnical test borings will be backfilled with grout to the existing ground surface within 24-hours. The borehole will be tremie-grouted in one continuous operation with a positive displacement pump using a bentonite slurry mix from the bottom of the borehole upward. Drilling spoils including soils and water from the test borings will be containerized in 55-gallon drums to be removed for disposal after chemicallaboratory results of the spoils have been received and reviewed. Spoils will be disposed of in accordance with federal and district laws and regulations. Date: September 9, 2014 Client: District Of Columbia | Applicant: Geocapitol Engineering Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400460 | |||||
SCORE 84 Boiler Date: February 8, 2012 Contractor: George Hurst Client: District Of Columbia | Permit status: Permit issued | Permit id: Fb1200057 | |||||
SCORE 96 Electrical Date: April 9, 2015 Contractor: Michael F. Dugan Client: District Of Columbia | Permit status: Completed | Permit id: E1504813 | |||||
SCORE 96 Mechanical Date: April 27, 2015 Contractor: Brooke C Greer Client: District Of Columbia | Permit status: Completed | Permit id: M1501727 | |||||
SCORE 96 Plumbing and gas Date: May 7, 2015 Contractor: Joseph M Magnolia Client: District Of Columbia | Permit status: Permit issued | Permit id: P1505671 | |||||
Plumbing and gas Date: June 16, 2015 Client: District Of Columbia | Permit status: Completed | Permit id: P1506640 | |||||
SCORE 96 Plumbing and gas Date: April 27, 2015 Contractor: Randall W Greer Client: District Of Columbia | Permit status: Completed | Permit id: P1505339 | |||||
SCORE 96 Plumbing and gas Date: February 11, 2016 Contractor: Randall W Greer Client: District Of Columbia | Permit status: Permit issued | Permit id: P1603615 | |||||
SCORE 96 Mechanical Date: July 7, 2016 Contractor: Brooke C Greer Client: District Of Columbia | Permit status: Permit issued | Permit id: M1602640 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcuyqwg4qteqsco80zrckmr Date: August 19, 2015 Contractor: Eric White District Of Columbia Leo Howell Client: District Of Columbia | Permit type: Electrical | Permit status: Permit issued | Permit id: E64549578 | |||||
SCORE 84 Boiler Date: February 8, 2012 Contractor: George Hurst Client: District Of Columbia | Permit status: Permit issued | Permit id: Fb1200057 | |||||
SCORE 96 Mechanical Date: July 7, 2016 Contractor: Brooke C Greer Client: District Of Columbia | Permit status: Permit issued | Permit id: M1602640 | |||||
SCORE 96 Plumbing and gas Date: February 11, 2016 Contractor: Randall W Greer Client: District Of Columbia | Permit status: Permit issued | Permit id: P1603615 | |||||
SCORE 99 A dc public charter school building a temporary construction entrance on a former dcps site. Date: December 11, 2014 Contractor: District Of Columbia Client: District Of Columbia | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1502267 | |||||
SCORE 89 We propose drilling seven, six-inch diameter geotechnical test borings using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be eight feet below the existing ground surface. Drilling equipment will be decontaminated between each hole to avoid cross contamination throughout the site. Upon completion, the geotechnical test borings will be backfilled with grout to the existing ground surface within 24-hours. The borehole will be tremie-grouted in one continuous operation with a positive displacement pump using a bentonite slurry mix from the bottom of the borehole upward. Drilling spoils including soils and water from the test borings will be containerized in 55-gallon drums to be removed for disposal after chemicallaboratory results of the spoils have been received and reviewed. Spoils will be disposed of in accordance with federal and district laws and regulations. Date: September 9, 2014 Contractor: Geocapitol Engineering Llc Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400460 | |||||
SCORE 84 Boiler Date: February 8, 2012 Contractor: George Hurst Client: District Of Columbia | Permit status: Permit issued | Permit id: Fb1200057 | |||||
SCORE 89 A dc public charter school conducting foundation-to-grade work for a new school building. Date: February 13, 2015 Contractor: Carrie Rollman Client: District Of Columbia | Permit type: Foundation only | Permit status: Permit issued | Permit id: Fd1500011 | |||||
SCORE 96 Electrical Date: June 5, 2015 Contractor: Michael F. Dugan Client: District Of Columbia | Permit status: Permit issued | Permit id: E1506367 | |||||
SCORE 96 Electrical Date: April 9, 2015 Contractor: Michael F. Dugan Client: District Of Columbia | Permit status: Completed | Permit id: E1504813 | |||||
SCORE 96 Electrical Date: October 13, 2015 Contractor: Michael F. Dugan Client: District Of Columbia | Permit status: Completed | Permit id: E1600378 | |||||
SCORE 96 Plumbing and gas Date: May 7, 2015 Contractor: Joseph M Magnolia Client: District Of Columbia | Permit status: Permit issued | Permit id: P1505671 | |||||
Plumbing and gas Date: June 16, 2015 Client: District Of Columbia | Permit status: Completed | Permit id: P1506640 | |||||
SCORE 96 Plumbing and gas Date: April 27, 2015 Contractor: Randall W Greer Client: District Of Columbia | Permit status: Completed | Permit id: P1505339 | |||||
Plumbing and gas Date: November 24, 2015 Client: District Of Columbia | Permit status: Completed | Permit id: P1601595 | |||||
SCORE 96 Mechanical Date: April 27, 2015 Contractor: Brooke C Greer Client: District Of Columbia | Permit status: Completed | Permit id: M1501727 | |||||
SCORE 96 Plumbing and gas Date: July 7, 2016 Contractor: Randall W Greer Client: District Of Columbia | Permit status: Permit issued | Permit id: P1607596 | |||||
SCORE 96 Plumbing and gas Date: February 11, 2016 Contractor: Randall W Greer Client: District Of Columbia | Permit status: Permit issued | Permit id: P1603615 | |||||
SCORE 96 Mechanical Date: July 7, 2016 Contractor: Brooke C Greer Client: District Of Columbia | Permit status: Permit issued | Permit id: M1602640 | |||||
SCORE 89 A dc public charter school renovating an existing school building on a former dcps site. This facility will host 5 students and 48 faculty/staff with a reheat kitchen. Date: May 14, 2015 Contractor: Carrie Rollman Client: District Of Columbia | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1502801 | |||||
SCORE 89 A dc public charter school building a new school wing on a former dcps site. This facility will host 4 students and 45 faculty/staff with a reheat kitchen Date: March 19, 2015 Contractor: Carrie Rollman Client: District Of Columbia | Permit type: New building | Permit status: Completed | Permit id: B1502259 | |||||
SCORE 96 Rtu-1 540mbh/rtu-2 195mbh/rtu-3 293/mbh doas-1 236mbh/ dhw-1 150mbh emergency generator 1965 mbh Date: April 27, 2015 Contractor: Brooke C Greer Client: District Of Columbia | Permit type: Boiler | Permit status: Permit issued | Permit id: Fb1500106 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcuyqwg4qteqsco80zrckmr Date: August 19, 2015 Contractor: Eric White; District Of Columbia; Leo Howell Client: District Of Columbia | Permit type: Electrical | Permit status: Permit issued | Permit id: E64549578 | |||||
SCORE 84 Type of elevator :one (1) electrical /steel/center/ passenger Date: August 3, 2015 Contractor: John Denny Client: District Of Columbia | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1502877 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfslyq4kdxskibhnrqgz123 Date: July 22, 2016 Client: Achievement Prep Achievement Prep | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P97411027 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildgsfhzmk%2bodbxsfneg6eif Date: July 22, 2016 Client: Achievement Prep Achievement Prep | Permit type: Mechanical | Permit status: Completed | Permit id: Ar65766575 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile6pswxfer9vhoy%2btojapqy Date: July 22, 2016 Contractor: Eric White; Carrie Rollman; Leo Howell Client: Carrie Rollman | Permit type: Electrical | Permit status: Completed | Permit id: E10348282 | |||||
SCORE 56 A dc public charter school fitting out the basement level at a former dcps site. This facility will host 5 students and 48 faculty/staff with a reheat kitchen. Scope of work is associated with building permit b1502801, however it is limited to the basement level fit-out. Date: June 14, 2016 Contractor: Na District Of Columbia; Ayesha Andrade Client: District Of Columbia | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1606995 | |||||
SCORE 61 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcfsr7yqrjrlubzfnd9o4qb Date: August 2, 2016 Client: District Of Columbia | Permit type: Electrical | Permit status: Permit issued | Permit id: E12802681 | |||||
Plumbing and gas Date: August 22, 2016 Client: District Of Columbia | Permit status: Permit issued | Permit id: P1608873 | |||||
Plumbing and gas Date: August 22, 2016 Client: District Of Columbia | Permit status: Permit issued | Permit id: P1608873 | |||||
Plumbing and gas Date: August 22, 2016 Client: District Of Columbia | Permit status: Permit issued | Permit id: P1608873 |