Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 Install 5 ton rtu to accessory storage bldg to include all associated ductwork & gas lines Date: April 16, 2009 Permit type: Mechanical | Permit status: Inspections | Completion date: April 16, 2009 | Current use: Commercial | Permit id: Bld2009-02215 | |||||
SCORE 61 Bathroom remodel; ada upgrade, kitchen upgrade no electrical. Plumbing only. Fb-un2, not historic, interior work to bathrooms in existing building. Date: August 27, 2015 Permit status: Inspections | Completion date: August 27, 2015 | Current use: Commercial | Permit id: Bld2015-06918 | |||||
SCORE 61 Ada bathroom #1- 2 fixtures to include toto madera right height elongated toilet with open face seat, american standard lucerne wall hung lavatory sink and moen commercial 2 handle chrome lavatory faucet. All underground and rough in drain and water line. Ada bathroom #2- 3 fixtures to include same as bathroom #1 and moen posi temp rough in shower valve and moen brantford chrome posi temp shower trim. Fiberglass shower stall. Tankless electric water heater. Floor drain in each bathroom with trap primer. Kitchenette- sink with garbage disposal. Water fountain add also. Date: September 4, 2015 Contractor: 821 S Washington Permit type: Plumbing | Permit status: Inspections | Completion date: September 4, 2015 | Current use: Commercial | Permit id: Bld2015-07179 |