Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
1700sqft re-roof (hra) from built up to built up (icc # 1274 class a) for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material: built up proposed roofing material: built-up manufacturer: gif brand and model: rubberoid energy cap... Torch granule fr color (if cool roof required): n a built-up roofing assembly system number per attached listing report (if applicable): class a specific exemption from cool roof requirements (if applicable): c. 2. Flat roof required building inspector field verification (if applicable): n a note: self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: September 17, 2014 Value: $10,081 Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: September 24, 2014 | Permit id: Pds2014-Resalt- | |||||
Convert 8 sq ft of existing 19 sq ft barn to workshop with misc for sfd Date: August 12, 2011 Value: $10,800 Permit type: Building : 43 - res | Permit status: Permit finaled | Completion date: October 28, 2011 | Permit id: Pds2011-1006-20 | |||||
1700sqft re-roof () from built up to built up (icc # 1274 class a) for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material built up proposed roofing material built-up manufacturer gif brand and model rubberoid energy cap... Torch granule fr color (if cool roof required) n/a built-up roofing assembly system number per attached listing report (if applicable) class a specific exemption from cool roof requirements (if applicable) c. 2. Flat roof required building inspector field verification (if applicable) n/a note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: September 17, 2014 Value: $10,081 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 24, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 88 1700sqft re-roof () from built up to built up (icc # 1274 class a) for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material built up proposed roofing material built-up manufacturer gif brand and model rubberoid energy cap... Torch granule fr color (if cool roof required) n a built-up roofing assembly system number per attached listing report (if applicable) class a specific exemption from cool roof requirements (if applicable) c. 2. Flat roof required building inspector field verification (if applicable) n a note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 24, 2014 | Permit id: Pds2014-Resalt- | |||||
Roof nail Date: September 23, 2014 Permit status: Cancel | Permit id: Pds2014-Resalt- | |||||
Final Date: October 26, 2011 Permit status: Pass | Permit id: Pds2011-1006-20 | |||||
Final Date: September 5, 2007 Permit status: Pass | Permit id: Pds2006-1007-20 | |||||
Final Date: July 21, 2006 Permit status: Fail | Permit id: Pds2006-1007-20 |