Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 6. 72 kw pv system on roof. 2 amp service upgrade. Date: September 8, 2015 Contractor: Solterra Systems Permit type: Electrical | Permit status: Permit closed | Completion date: December 29, 2015 | Expiration date: September 7, 2016 | Current use: Single family / duplex | Permit id: 6493599 | |||||
SCORE 96 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 6. 72 kw pv system on roof. 2 amp service upgrade. Date: September 8, 2015 Contractor: Earl Childs Permit type: Electrical | Permit status: Permit closed | Completion date: December 29, 2015 | Expiration date: September 7, 2016 | Current use: Single family / duplex | Permit id: 6493599 |