Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: September 17, 2013 Client: Lin Xunan Lin Xunxi | Permit status: Completed | Permit id: 495054 | |||||
Alteration permit Date: September 17, 2013 Client: Lin Xunan Lin Xunxi | Permit status: Completed | Permit id: 495054 | |||||
SCORE 93 Stucco the second and third floors on the front of building. The listed general contractor, wu nen di, has no employees as per notarized letter. All sub-contractors are to be licensed in the city of philadelphia, and listed on permit. A sub-contractors list is to be given to the inspector before any work starts. Stucco_-_exterior plaster. Installation of these materials shall be in compliance with astmc926 and astmc1063 and the provisions of this code. R703. 6. 1 lath. All lath and lath attachments shall be of corrosion- resistant materials. Expanded metal or woven wire lath shall be attached with 1-1 2-inch-long (38 mm), 11 gage nails having a 7 16-inch (11. 1 mm) head, or 7 8-inch-long (22. 2 mm), 16 gage staples, spaced at no more than 6 inches (152 mm), or as otherwise approved. Contact inspector at district office for wall inspection prior to starting work. Date: September 17, 2013 Contractor: Wu Nen Di Client: Lin Xunan Lin Xunxi | Permit type: Alteration permit | Permit status: Completed | Completion date: November 15, 2013 | Permit id: 495054 |