Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Sfd/roof Client: Thomas & Mary Spohrer | Permit type: Bldg 1f2f add alt | Permit status: Expired | Permit id: Bs11-1439 | |||||
1" service (2996) Date: July 13, 2006 Permit type: Row excavation | Permit status: Issued | Permit id: En06-2050 | |||||
SCORE 99 1" service (2996) Date: July 13, 2006 Contractor: Illinoisamerican Water Compan Permit type: Row excavation | Permit status: Issued | Permit id: En06-2050 | |||||
SCORE 64 Dental lab (ragle dental lab) Client: Eastside Warehouse Dev Llc | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: January 29, 2010 | Permit id: Bs08-2933 | |||||
SCORE 64 Dental lab (ragle dental lab) Date: December 29, 2008 Contractor: Ryan Haselman Client: Ragle Dental Laboratory | Permit type: Grading | Permit status: Issued | Permit id: En08-1371 | |||||
SCORE 100 New service Date: October 18, 2012 Contractor: Mx Electric Inc Client: Coralonyx Real Estate | Permit type: Electrical | Permit status: Finaled | Completion date: October 22, 2012 | Permit id: Bs12-2141 | |||||
SCORE 100 New service Date: October 18, 2012 Contractor: Mx Electric, Inc Client: Coralonyx Real Estate | Permit type: Electrical | Permit status: Finaled | Completion date: October 22, 2012 | Permit id: Bs12-2141 | |||||
SCORE 76 Demo/hospital Client: City Of Champaign | Permit type: Demo c | Permit status: Finaled | Completion date: September 2, 2004 | Permit id: Bs04-0346 | |||||
SCORE 100 Maint. Services (2430) Date: September 18, 2006 Contractor: Shaw Brothers Construction Client: Mcmillan, Jason C | Permit type: Row excavation | Permit status: Issued | Permit id: En06-2526 | |||||
SCORE 94 Rewire a c units & ext lights Date: June 24, 2009 Contractor: Kruts Electric Client: Bradleys | Permit type: Electrical | Permit status: Finaled | Completion date: December 14, 2009 | Permit id: Bs09-1199 | |||||
SCORE 100 Roof (bradleys) Client: Bradleys | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: June 26, 2009 | Permit id: Bs09-1201 | |||||
SCORE 93 Furnace replacement Client: Lillian R Moore-Driver | Permit type: Hvac | Permit status: Finaled | Completion date: December 27, 2010 | Permit id: Bs10-2565 | |||||
SCORE 100 Elec Client: Hillcrest Center Llc | Permit type: Electrical | Permit status: Finaled | Completion date: April 20, 2004 | Permit id: Bs03-1179 | |||||
SCORE 100 Retail/office/assembly Client: Hillcrest Center Llc | Permit type: Bldg c new add | Permit status: Finaled | Completion date: July 2, 2003 | Permit id: Bs03-0793 | |||||
SCORE 95 Hvac Client: Hillcrest Center Llc | Permit type: Hvac | Permit status: Expired | Permit id: Bs03-1167 | |||||
SCORE 100 Retail Date: May 23, 2003 Contractor: Jsm Development Client: Hillcrest Center Llc | Permit type: Grading | Permit status: Issued | Permit id: En03-0526 | |||||
SCORE 100 Footing and foundation Date: April 17, 2003 Contractor: Jsm Development Client: Hillcrest Center Llc | Permit type: Bldg ftg found | Permit status: Expired | Permit id: Bs03-0841 | |||||
SCORE 100 Plbg Date: May 28, 2003 Contractor: Clark Plbg. And Htg Client: Hillcrest Development Llc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 5, 2003 | Permit id: Bs03-1170 | |||||
SCORE 100 Sump pump & pit Date: August 25, 2009 Contractor: Clark Plbg. And Htg Client: Ronald Bribriesco | Permit type: Plumbing | Permit status: Finaled | Completion date: August 25, 2009 | Permit id: Bs09-1763 | |||||
SCORE 96 Water service Date: May 14, 2012 Contractor: Lanz Plbg Client: Timothy J Sharp | Permit type: Plumbing | Permit status: Finaled | Completion date: May 8, 2012 | Permit id: Bs12-0955 | |||||
SCORE 99 Sign Date: May 12, 2010 Contractor: Tri Star Marketing Inc Client: Tri, Star Marketing Inc | Permit status: Issued | Permit id: Pl10-0087 | |||||
SCORE 99 Sign Date: September 7, 2011 Contractor: Vision Neon Client: Tri Star Marketing Inc | Permit status: Issued | Permit id: Pl11-0159 | |||||
SCORE 99 Sign Date: September 7, 2011 Contractor: Tri Star Marketing Inc Client: Tri Star Marketing Inc | Permit status: Issued | Permit id: Pl11-0158 | |||||
SCORE 72 Sign Date: May 2, 2011 Contractor: Pepsi Client: Tri Star Marketing Inc | Permit status: Issued | Permit id: Pl11-0075 | |||||
SCORE 91 Sign Date: May 12, 2010 Contractor: Tri, Star Marketing Inc Client: Tri, Star Marketing Inc | Permit status: Issued | Permit id: Pl10-0087 | |||||
SCORE 100 A/c replacement Client: Pias | Permit type: Hvac | Permit status: Finaled | Completion date: September 18, 2009 | Permit id: Bs09-1752 | |||||
SCORE 100 Dryer vent - exterior Date: November 2, 2009 Contractor: Freds Plbg. Htg. And A C Client: Technology Plaza Llc | Permit type: Hvac | Permit status: Finaled | Completion date: November 2, 2009 | Permit id: Bs09-2270 | |||||
SCORE 100 Plumbing Date: November 2, 2009 Contractor: Freds Plbg. Htg. And A C Client: Technology Plaza Llc | Permit status: Finaled | Completion date: November 10, 2009 | Permit id: Bs09-2271 | |||||
SCORE 56 Sign Date: September 27, 2010 Contractor: Cosmos Sign Client: Technology Plaza Llc | Permit status: Issued | Permit id: Pl10-0138 | |||||
SCORE 100 Sign Date: October 24, 2011 Contractor: American Dowell Signs Client: Technology Plaza Llc | Permit status: Issued | Permit id: Pl11-0178 | |||||
SCORE 89 Walkway roof Client: Technology Plaza Llc | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: June 27, 2012 | Permit id: Bs11-1907 | |||||
SCORE 100 Dryer, washer & water heater circuits Date: October 30, 2009 Contractor: Freds Plbg. Htg. And A C Client: Technology Plaza Llc | Permit type: Electrical | Permit status: Finaled | Completion date: November 12, 2009 | Permit id: Bs09-2268 | |||||
SCORE 100 Temporarily occupy sidewalk and pavement for sign installati Date: May 12, 2009 Contractor: Prairie Signs Client: Technology Plaza Llc | Permit type: Row occupancy | Permit status: Issued | Permit id: En09-0362 | |||||
SCORE 93 Repair sanitary sewer service Date: May 11, 2009 Contractor: Jackson Excavating Inc Client: Technology Plaza Llc | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: May 6, 2009 | Permit id: En09-0357 | |||||
SCORE 93 Temp occupy 1/2 of alley for sanitary repair Date: May 11, 2009 Contractor: Jackson Excavating Inc Client: Technology Plaza Llc | Permit type: Row occupancy | Permit status: Issued | Permit id: En09-0358 | |||||
Permission to occupy one lane of green st traffic for moving Date: May 14, 2009 Client: Technology Plaza Llc | Permit type: Row occupancy | Permit status: Issued | Permit id: En09-0365 | |||||
SCORE 100 Temp occupy wb lane of green st for sign install Date: October 13, 2009 Contractor: Prairie Signs Client: Technology Plaza Llc | Permit type: Row occupancy | Permit status: Issued | Permit id: En09-0957 | |||||
Juno hair sign permit Date: October 20, 2009 Value: $20 Client: Technology Plaza Llc | Permit type: Sign | Permit status: Issued | Permit id: Pl09-0146 | |||||
SCORE 56 Temp occupy lane of green st for sign installation Date: November 15, 2011 Contractor: A Sign By Design Inc Client: Technology Plaza Llc | Permit type: Row occupancy | Permit status: Issued | Permit id: En11-1012 | |||||
SCORE 100 Plumbing Date: November 2, 2009 Contractor: Freds Plbg., Htg. And A C Client: Technology Plaza Llc | Permit status: Finaled | Completion date: November 10, 2009 | Permit id: Bs09-2271 | |||||
SCORE 100 Dryer vent - exterior Date: November 2, 2009 Contractor: Freds Plbg., Htg. And A C Client: Technology Plaza Llc | Permit type: Hvac | Permit status: Finaled | Completion date: November 2, 2009 | Permit id: Bs09-2270 | |||||
SCORE 56 Temp occupy lane of green st for sign installation Date: November 15, 2011 Contractor: A Sign By Design, Inc Client: Technology Plaza Llc | Permit type: Row occupancy | Permit status: Issued | Permit id: En11-1012 | |||||
SCORE 93 Temp occupy 1 2 of alley for sanitary repair Date: May 11, 2009 Contractor: Jackson Excavating, Inc Client: Technology Plaza Llc | Permit type: Row occupancy | Permit status: Issued | Permit id: En09-0358 | |||||
SCORE 93 Repair sanitary sewer service Date: May 11, 2009 Contractor: Jackson Excavating, Inc Client: Technology Plaza Llc | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: May 6, 2009 | Permit id: En09-0357 | |||||
SCORE 100 Dryer, washer & water heater circuits Date: October 30, 2009 Contractor: Freds Plbg., Htg. And A C Client: Technology Plaza Llc | Permit type: Electrical | Permit status: Finaled | Completion date: November 12, 2009 | Permit id: Bs09-2268 | |||||
SCORE 89 Walkway roof Client: Technology Plaza Llc | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: June 27, 2012 | Permit id: Bs11-1907 | |||||
SCORE 56 Electrical Date: May 14, 2009 Contractor: A Remodeling Permit status: Expired | Permit id: Bs09-0890 | |||||
SCORE 56 Multi-family Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: September 22, 2009 | Permit id: Bs09-0928 | |||||
SCORE 89 Multifamily Permit type: Sprinkler | Permit status: Finaled | Completion date: September 22, 2009 | Permit id: Bs09-1208 | |||||
SCORE 89 Multifamily Client: William & Susan Reimer | Permit type: Sprinkler | Permit status: Finaled | Completion date: September 22, 2009 | Permit id: Bs09-1208 | |||||
SCORE 100 Furnace replacement Client: Barr Real Estate | Permit type: Hvac | Permit status: Finaled | Completion date: November 4, 2011 | Permit id: Bs11-1786 | |||||
SCORE 74 Furnace & a/c replacement Client: Dixie L Dickens | Permit type: Hvac | Permit status: Finaled | Completion date: August 23, 2012 | Permit id: Bs12-1711 | |||||
SCORE 56 Sign Date: March 25, 2010 Contractor: Marsters Client: National Pizza Company | Permit status: Issued | Permit id: Pl10-0041 | |||||
SCORE 63 Temp occupy one lane of green st for sign replacement Date: May 19, 2010 Contractor: Marsters Sign Company Client: National, Pizza Company | Permit type: Row occupancy | Permit status: Issued | Permit id: En10-0505 | |||||
SCORE 100 Furnace & a/c replacement Client: National Pizza Company | Permit type: Hvac | Permit status: Issued | Permit id: Bs12-2023 | |||||
SCORE 100 Furnace replacement Client: Paul A Mary R Edwards | Permit type: Hvac | Permit status: Finaled | Completion date: July 22, 2011 | Permit id: Bs10-2556 | |||||
SCORE 96 Elec Date: July 11, 2003 Contractor: Ricks Electric Service Client: Wilson, Rolf David | Permit type: Electrical | Permit status: Finaled | Completion date: July 16, 2003 | Permit id: Bs03-1614 | |||||
SCORE 100 Electrical Client: Ken Salo | Permit status: Finaled | Completion date: April 14, 2010 | Permit id: Bs09-1992 | |||||
SCORE 100 Plumbing Date: December 11, 2009 Contractor: Harold R Colbert Company Client: Kenneth E Salo | Permit status: Finaled | Completion date: March 12, 2010 | Permit id: Bs09-2617 | |||||
SCORE 56 Sfd/deck Client: Kenneth E Salo | Permit type: Bldg 1f2f add alt | Permit status: Approved | Permit id: Bs12-2440 | |||||
Discount tobacco warhouse temporary sign Date: July 20, 2012 Client: Shurtz Richard | Permit type: Sign | Permit status: Issued | Permit id: Pl12-0132 | |||||
Sign Date: January 17, 2012 Client: Shurtz Richard | Permit status: Issued | Permit id: Pl12-0006 | |||||
SCORE 100 Sign Date: July 17, 2012 Contractor: American Dowell Signs Client: Shurtz Richard | Permit status: Issued | Permit id: Pl12-0129 | |||||
SCORE 56 Jackson-hewitt temp Date: January 21, 2010 Contractor: Ben Stark Client: Shurtz Richard | Permit type: Sign | Permit status: Issued | Permit id: Pl10-0026 | |||||
SCORE 59 Sign Date: January 17, 2012 Contractor: Jacksonhewitt Client: Shurtz Richard | Permit status: Issued | Permit id: Pl12-0006 | |||||
SCORE 100 Furnace & a/c replacement Client: Richard Shurtz | Permit type: Hvac | Permit status: Finaled | Completion date: May 10, 2011 | Permit id: Bs10-2103 | |||||
SCORE 82 Furnace replacement Client: James C Washburn | Permit type: Hvac | Permit status: Finaled | Completion date: November 26, 2012 | Permit id: Bs12-2410 | |||||
SCORE 100 Retire service Date: June 15, 2009 Contractor: Shaw Brothers Construction Client: Ameren Services | Permit type: Row excavation | Permit status: Issued | Permit id: En09-0477 | |||||
SCORE 65 Sfd Client: Ameren Services | Permit type: Demo 1f2f | Permit status: Finaled | Completion date: June 26, 2009 | Permit id: Bs09-1056 | |||||
SCORE 90 Repair sanitary sewer service Date: August 8, 2012 Contractor: Coit Concrete Client: Payne Barbara | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: August 7, 2012 | Permit id: En12-0788 | |||||
SCORE 90 Occupying the right of way Date: August 8, 2012 Contractor: Coit Concrete Client: Payne Barbara | Permit type: Row occupancy | Permit status: Issued | Permit id: En12-0789 | |||||
SCORE 95 Furnace & a/c replacement Client: Charles E Kucera | Permit type: Hvac | Permit status: Cond final | Completion date: November 8, 2012 | Permit id: Bs12-2161 | |||||
SCORE 100 Repair two panels of sidewalk in parkland side driveway Date: September 25, 2012 Contractor: Pankau Masonry Client: Scrima David | Permit type: Sidewalk | Permit status: Finaled | Completion date: September 27, 2012 | Permit id: En12-1004 | |||||
SCORE 99 Restaurant (hardees) Client: David Scrima | Permit type: Hvac | Permit status: Finaled | Completion date: October 10, 2012 | Permit id: Bs12-1855 | |||||
SCORE 56 Restaurant (hardees) Client: David Scrima | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: October 16, 2012 | Permit id: Bs11-1686 | |||||
SCORE 100 Restaurant (hardees) Client: David Scrima | Permit type: Electrical | Permit status: Finaled | Completion date: October 12, 2012 | Permit id: Bs12-1811 | |||||
SCORE 56 Sign Date: October 3, 2012 Contractor: Erich Perry Client: Scrima David | Permit status: Issued | Permit id: Pl12-0195 | |||||
SCORE 100 Hood supression (hardees) Client: David Scrima | Permit type: Hvac | Permit status: Finaled | Completion date: October 10, 2012 | Permit id: Bs12-1903 | |||||
SCORE 100 Ice machine - hardees Date: September 25, 2012 Contractor: Mattex Service Co. Inc Client: David Scrima | Permit type: Plumbing | Permit status: Finaled | Completion date: October 12, 2012 | Permit id: Bs12-1987 | |||||
SCORE 62 Refrigeration (hardees) Client: David Scrima | Permit type: Hvac | Permit status: Finaled | Completion date: October 10, 2012 | Permit id: Bs12-2003 | |||||
SCORE 100 Sign Date: July 25, 2012 Contractor: American Dowell Signs Client: Scrima David | Permit status: Issued | Permit id: Pl12-0141 | |||||
SCORE 100 Restaurant (hardees) Date: August 23, 2012 Contractor: Clark Plbg. And Htg Client: David Scrima | Permit type: Plumbing | Permit status: Finaled | Completion date: October 12, 2012 | Permit id: Bs12-1754 | |||||
SCORE 66 Refrigeration (hardees) Client: David Scrima | Permit type: Hvac | Permit status: Finaled | Completion date: October 10, 2012 | Permit id: Bs12-2003 | |||||
SCORE 100 Ice machine - hardees Date: September 25, 2012 Contractor: Mattex Service Co., Inc Client: David Scrima | Permit type: Plumbing | Permit status: Finaled | Completion date: October 12, 2012 | Permit id: Bs12-1987 | |||||
SCORE 99 Restaurant (hardees) Client: David Scrima | Permit type: Hvac | Permit status: Finaled | Completion date: October 10, 2012 | Permit id: Bs12-1855 | |||||
SCORE 100 Restaurant (hardees) Client: David Scrima | Permit type: Electrical | Permit status: Finaled | Completion date: October 12, 2012 | Permit id: Bs12-1811 | |||||
SCORE 100 Fire alarm system Client: Campus Investors Llc | Permit type: Electrical | Permit status: Finaled | Completion date: May 20, 2009 | Permit id: Bs09-0860 | |||||
Temp occupy parkway (exc for sanitary repair) Date: May 1, 2012 Client: Wooters Gregory B | Permit type: Row occupancy | Permit status: Issued | Permit id: En12-0441 | |||||
SCORE 56 Repair sanitary sewer service Date: May 1, 2012 Contractor: Darrah Contracting Client: Wooters Gregory B | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: April 13, 2012 | Permit id: En12-0439 | |||||
SCORE 100 Water heater Date: September 20, 2011 Contractor: Halfar Plumbing Client: William J Graham | Permit type: Plumbing | Permit status: Finaled | Completion date: October 12, 2011 | Permit id: Bs11-1818 | |||||
SCORE 89 Electrical Client: William J Graham | Permit status: Finaled | Completion date: October 28, 2011 | Permit id: Bs11-1915 | |||||
SCORE 100 Furnace replacement Client: William J Graham | Permit type: Hvac | Permit status: Finaled | Completion date: September 30, 2011 | Permit id: Bs11-1824 | |||||
SCORE 97 Sfd/roof Client: William J Graham | Permit type: Bldg 1f2f add alt | Permit status: Finaled | Completion date: November 7, 2011 | Permit id: Bs11-2104 | |||||
SCORE 89 3 story apartment bldg Client: Ralph Henneman | Permit type: Demo c | Permit status: Finaled | Completion date: May 18, 2011 | Permit id: Bs11-0663 | |||||
SCORE 99 Temporary service Date: May 17, 2011 Contractor: Davis Electric Client: Ronald Cook | Permit type: Electrical | Permit status: Finaled | Completion date: June 21, 2011 | Permit id: Bs11-0931 | |||||
Noodles sidewalk cafe Date: April 5, 2011 Client: Boardwalk Development Co | Permit type: Outdoor cafe | Permit status: Issued | Permit id: Pl11-0038 | |||||
Outdoor cafe Date: April 13, 2010 Client: Boardwalk Development Co | Permit status: Under review | Permit id: Pl10-0062 | |||||
Elevator pit discharge to go to the sanitary sewer Date: March 31, 2005 Client: Jsm, Apartments | Permit type: Sanitary sewer | Permit status: Issued | Permit id: En05-0467 | |||||
SCORE 95 Sanitary sewer repair Date: June 1, 2009 Contractor: Mr. Rooter Client: Gillen Jerold L | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: May 27, 2009 | Permit id: En09-0407 | |||||
SCORE 95 Plumbing Date: May 29, 2009 Contractor: Mr. Rooter Client: Jerold L Gillen | Permit status: Issued | Permit id: Bs09-1009 | |||||
SCORE 89 A/c replacement Client: Jerold L Gillen | Permit type: Hvac | Permit status: Finaled | Completion date: April 18, 2012 | Permit id: Bs12-0793 | |||||
SCORE 100 Pavement degradation fee Date: November 24, 2010 Contractor: Duce Construction Permit type: Row excavation | Permit status: Issued | Permit id: En10-1184 | |||||
SCORE 100 Maint. Mains Date: September 16, 2009 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En09-0856 | |||||
SCORE 100 Sfd/foundation Client: Ajith Antony | Permit type: Bldg 1f2f add alt | Permit status: Finaled | Completion date: August 23, 2010 | Permit id: Bs09-2567 | |||||
SCORE 59 Demo/sfd det. Gar. Client: Ajith Antony | Permit type: Demo 1f2f | Permit status: Finaled | Completion date: May 20, 2011 | Permit id: Bs11-0911 | |||||
Ameren ip annual erosion control permit Date: March 30, 2009 Permit type: Erosion | Permit status: Issued | Permit id: En09-0241 | |||||
At&t annual erosion control permit Date: March 31, 2009 Permit type: Erosion | Permit status: Issued | Permit id: En09-0247 | |||||
Illinois american water annual erosion control permit Date: March 30, 2009 Permit type: Erosion | Permit status: Issued | Permit id: En09-0240 | |||||
At&t annual erosion control permit Date: April 20, 2010 Permit type: Erosion | Permit status: Issued | Permit id: En10-0393 | |||||
Ameren ip annual erosion control permit Date: April 20, 2010 Permit type: Erosion | Permit status: Issued | Permit id: En10-0390 | |||||
Illinois american water annual erosion control permit Date: April 20, 2010 Permit type: Erosion | Permit status: Issued | Permit id: En10-0391 | |||||
SCORE 100 Maint. Mains Date: September 16, 2009 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En09-0859 | |||||
SCORE 100 Furnace replacement Client: Lawrence Bouton | Permit type: Hvac | Permit status: Finaled | Completion date: April 21, 2011 | Permit id: Bs11-0712 | |||||
SCORE 100 Temporary/tent Client: Douglass Park Lp | Permit type: Tent | Permit status: Finaled | Completion date: May 24, 2006 | Permit id: Bs06-1748 | |||||
SCORE 95 Crisis pregnancy center Date: March 20, 2007 Contractor: Quality Plumbing Client: Living Alternatives | Permit type: Plumbing | Permit status: Expired | Permit id: Bs07-0672 | |||||
SCORE 63 G&d Date: October 4, 2005 Contractor: Apple Creek Construction Servi Client: Living Alternatives | Permit type: Grading | Permit status: Issued | Permit id: En05-2378 | |||||
SCORE 63 Expired - offices (crisis pregnancy center) Client: Living Alternatives | Permit type: Bldg c new add | Permit status: Expired | Permit id: Bs05-2832 | |||||
SCORE 77 (crisis pregnancy center) Client: Living Alternatives | Permit type: Electrical | Permit status: Finaled | Completion date: October 22, 2007 | Permit id: Bs07-0911 | |||||
SCORE 96 Crisis pregnancy center Client: Living Alternatives | Permit type: Hvac | Permit status: Finaled | Completion date: October 10, 2007 | Permit id: Bs07-1838 | |||||
SCORE 100 Plumbing Date: May 27, 2009 Contractor: Clark Plbg. And Htg Permit status: Finaled | Completion date: December 8, 2010 | Permit id: Bs09-0957 | |||||
SCORE 91 Repair sanitary sewer service Date: August 19, 2011 Contractor: Trademark Construction Inc Permit type: Sanitary sewer | Permit status: Finaled | Completion date: August 22, 2011 | Permit id: En11-0732 | |||||
SCORE 80 Repair sanitary sewer service Date: August 19, 2011 Contractor: Trademark Construction, Inc Client: Koons Timothy & Kathryn M | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: August 22, 2011 | Permit id: En11-0732 | |||||
SCORE 100 Water heater Date: June 15, 2009 Contractor: Harold R Colbert Company Client: Donald K Thompson | Permit type: Plumbing | Permit status: Finaled | Completion date: December 30, 2009 | Permit id: Bs09-1118 | |||||
SCORE 100 Furnace & a/c replacement Client: Donald K Thompson | Permit type: Hvac | Permit status: Finaled | Completion date: December 30, 2009 | Permit id: Bs09-1080 | |||||
SCORE 91 Repair sanitary sewer service Date: November 17, 2011 Contractor: Trademark Construction Inc Client: Mayer Michael F | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: November 17, 2011 | Permit id: En11-1014 | |||||
SCORE 78 Water heater Date: April 15, 2009 Contractor: Quality Plumbing Heating And Air Client: Michael F Mayer | Permit type: Plumbing | Permit status: Finaled | Completion date: April 21, 2009 | Permit id: Bs09-0659 | |||||
SCORE 80 Repair sanitary sewer service Date: November 17, 2011 Contractor: Trademark Construction, Inc Client: Mayer Michael F | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: November 17, 2011 | Permit id: En11-1014 | |||||
SCORE 79 Water heater Date: April 15, 2009 Contractor: Quality Plumbing,Heating And Air Client: Michael F Mayer | Permit type: Plumbing | Permit status: Finaled | Completion date: April 21, 2009 | Permit id: Bs09-0659 | |||||
SCORE 100 Sanitary sewer service repair Date: July 12, 2010 Contractor: Stephens Excav. And Concrete Client: Moore Geraldine | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: July 8, 2010 | Permit id: En10-0669 | |||||
SCORE 100 Ground rod/meter Client: Jerri Moore | Permit type: Electrical | Permit status: Finaled | Completion date: August 27, 2009 | Permit id: Bs09-1784 | |||||
SCORE 100 Water heater Date: February 24, 2010 Contractor: Ameriplumb Client: Michael Carey | Permit type: Plumbing | Permit status: Finaled | Completion date: March 4, 2010 | Permit id: Bs10-0331 | |||||
SCORE 93 Electrical Date: November 18, 2009 Contractor: Empty Tomb Client: Restoration Urban | Permit status: Finaled | Completion date: November 18, 2009 | Permit id: Bs09-2452 | |||||
SCORE 100 Plumbing Date: February 24, 2010 Contractor: Halfar Plumbing Client: Timothy Lewis | Permit status: Finaled | Completion date: April 21, 2010 | Permit id: Bs10-0347 | |||||
SCORE 100 Electrical Client: Lewis Timothy | Permit status: Finaled | Completion date: April 22, 2010 | Permit id: Bs10-0435 | |||||
SCORE 99 Sfd Client: Lewis Timothy | Permit type: Bldg 1f2f add alt | Permit status: Finaled | Completion date: April 23, 2010 | Permit id: Bs09-2475 | |||||
SCORE 96 Electrical Client: Lewis Timothy | Permit status: Finaled | Completion date: April 22, 2010 | Permit id: Bs10-0435 | |||||
SCORE 99 Hand sink Date: February 24, 2010 Contractor: Kobel P And H Client: Westchester Center (w) | Permit type: Plumbing | Permit status: Finaled | Completion date: February 26, 2010 | Permit id: Bs10-0349 | |||||
SCORE 56 Feed to rooftop units Client: Westchester Center | Permit type: Electrical | Permit status: Finaled | Permit id: Bs10-0760 | |||||
SCORE 100 Furnace & a/c replacement Client: Westchester Center (e) | Permit type: Hvac | Permit status: Finaled | Completion date: April 30, 2010 | Permit id: Bs10-0829 | |||||
SCORE 99 Mechanical room Client: Abbas Kazemi | Permit type: Sprinkler | Permit status: Finaled | Completion date: July 27, 2011 | Permit id: Bs10-1399 | |||||
SCORE 100 Service upgrade Date: August 10, 2010 Contractor: Mx Electric Inc Permit type: Electrical | Permit status: Finaled | Completion date: January 4, 2011 | Permit id: Bs10-1625 | |||||
SCORE 100 Service upgrade Date: August 10, 2010 Contractor: Mx Electric, Inc Client: Peter & Joann Molnar | Permit type: Electrical | Permit status: Finaled | Completion date: January 4, 2011 | Permit id: Bs10-1625 | |||||
SCORE 59 Retail/roof parapet Client: Bankier Land Investment | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: September 22, 2010 | Permit id: Bs10-1734 | |||||
Fire alarm system Date: May 13, 2010 Value: $22,140 Client: Marc R Miller | Permit type: Electrical | Permit status: Issued | Permit id: Bs10-0954 | |||||
SCORE 100 Sprinkler Date: November 20, 2009 Contractor: Twohey Plumbing Client: Marc R Miller | Permit status: Issued | Permit id: Bs09-2485 | |||||
SCORE 100 Fire alarm system Client: Marc R Miller | Permit type: Electrical | Permit status: Issued | Permit id: Bs10-0954 | |||||
SCORE 56 Multi-family/egress windows Client: Illinois First Corp | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: May 14, 2010 | Permit id: Bs10-0459 | |||||
SCORE 100 Service upgrade Date: December 22, 2010 Contractor: Interstate Electric Client: Cindy Drahota | Permit type: Electrical | Permit status: Finaled | Completion date: December 22, 2010 | Permit id: Bs10-2605 | |||||
SCORE 100 Water heater Date: January 20, 2011 Contractor: Hillards Plbg Htg And Cooling Client: Paul Marcumjean Mengelkoch | Permit type: Plumbing | Permit status: Finaled | Completion date: March 7, 2011 | Permit id: Bs11-0121 | |||||
SCORE 100 Water heater Date: January 20, 2011 Contractor: Hillards Plbg, Htg And Cooling Client: Paul Marcum Jean Mengelkoch | Permit type: Plumbing | Permit status: Finaled | Completion date: March 7, 2011 | Permit id: Bs11-0121 | |||||
SCORE 100 Furnace & a/c replacement Client: Paul Marcum Jean Mengelkoch | Permit type: Hvac | Permit status: Finaled | Completion date: March 16, 2011 | Permit id: Bs11-0447 | |||||
SCORE 100 Furnace & a/c replacement Client: Danny Reynolds Cody Abbott | Permit type: Hvac | Permit status: Expired | Permit id: Bs11-1338 | |||||
SCORE 95 Furnace replacement Client: Rebecca Hays | Permit type: Hvac | Permit status: Finaled | Completion date: March 31, 2010 | Permit id: Bs10-0588 | |||||
SCORE 100 Htg & a/c replacement Client: Hays Rebecca | Permit type: Hvac | Permit status: Finaled | Completion date: August 21, 2009 | Permit id: Bs09-1296 | |||||
SCORE 100 Furnace & a/c replacement Client: Behrooz Ghamari | Permit type: Hvac | Permit status: Expired | Permit id: Bs10-0616 | |||||
SCORE 99 Restaurant (chopstix) Client: Bankier Family Limited | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: September 3, 2010 | Permit id: Bs10-0625 | |||||
Restaurant (chopstix) Date: May 28, 2010 Value: $20,000 Client: Bankier Family Limited | Permit type: Electrical | Permit status: Finaled | Completion date: September 3, 2010 | Permit id: Bs10-1067 | |||||
SCORE 99 Restaurant (chopstix) Date: June 7, 2010 Contractor: Sam Lu Construction Co Client: Bankier Family Limited | Permit type: Plumbing | Permit status: Finaled | Completion date: August 31, 2010 | Permit id: Bs10-1124 | |||||
SCORE 100 Hood supression (chop stixs restaurant) Date: August 23, 2010 Contractor: Getz Fire Equipment Client: Bankier Family Limited | Permit type: Hvac | Permit status: Finaled | Completion date: September 3, 2010 | Permit id: Bs10-1713 | |||||
Hood & hood supression (chopstix) Date: May 28, 2010 Value: $20,000 Client: Bankier Family Limited | Permit type: Hvac | Permit status: Finaled | Completion date: September 3, 2010 | Permit id: Bs10-1068 | |||||
SCORE 82 Temporary service Date: January 18, 2012 Contractor: Boehm Elect. Contractors Llc Client: Edward Rose Developement | Permit type: Electrical | Permit status: Finaled | Completion date: January 18, 2012 | Permit id: Bs12-0093 | |||||
SCORE 82 Temporary service Date: January 18, 2012 Contractor: Boehm Elect. Contractors, Llc Client: Edward Rose Developement | Permit type: Electrical | Permit status: Finaled | Completion date: January 18, 2012 | Permit id: Bs12-0093 | |||||
Fire alarm (bldg. 2) Date: March 16, 2012 Value: $15,500 Permit type: Fire alarm | Permit status: Finaled | Completion date: July 23, 2012 | Permit id: Bs12-0470 | |||||
SCORE 99 Multi-family (bldg. 2) Permit type: Bldg c new add | Permit status: Cond final | Permit id: Bs11-1858 | |||||
SCORE 100 Multi-family (bldg. 2) Date: October 20, 2011 Contractor: Wells And Wells Construction Permit type: Grading | Permit status: Issued | Permit id: En11-0956 | |||||
Multi-family (bldg. 2) Date: February 29, 2012 Value: $37,200 Permit type: Sprinkler | Permit status: Finaled | Completion date: September 7, 2012 | Permit id: Bs12-0340 | |||||
SCORE 65 Multi-family (bldg. 2) Permit type: Hvac | Permit status: Finaled | Completion date: July 20, 2012 | Permit id: Bs12-0731 | |||||
SCORE 95 Water service/fire service (bldg. 2) Date: December 13, 2011 Contractor: A And R Mechanical Permit type: Plumbing | Permit status: Finaled | Completion date: July 12, 2012 | Permit id: Bs11-2476 | |||||
SCORE 84 Multi-family (bldg. 2) Date: November 28, 2011 Contractor: Triple M Plbg. And Hvac Permit type: Plumbing | Permit status: Finaled | Completion date: July 20, 2012 | Permit id: Bs11-2340 | |||||
SCORE 100 Multi-family (bldg. 2) Date: March 20, 2012 Contractor: Thomas Electric Permit type: Electrical | Permit status: Finaled | Completion date: November 13, 2012 | Permit id: Bs12-0498 | |||||
SCORE 95 Water service fire service (bldg. 2) Date: December 13, 2011 Contractor: A And R Mechanical Permit type: Plumbing | Permit status: Finaled | Completion date: July 12, 2012 | Permit id: Bs11-2476 | |||||
SCORE 100 Multi-family (bldg. 2) Permit type: Sprinkler | Permit status: Finaled | Completion date: September 7, 2012 | Permit id: Bs12-0340 | |||||
SCORE 100 Fire alarm (bldg. 2) Permit type: Fire alarm | Permit status: Finaled | Completion date: July 23, 2012 | Permit id: Bs12-0470 | |||||
SCORE 100 A/c replacement Permit type: Hvac | Permit status: Finaled | Completion date: March 28, 2012 | Permit id: Bs12-0568 | |||||
SCORE 100 A c replacement Permit type: Hvac | Permit status: Finaled | Completion date: March 28, 2012 | Permit id: Bs12-0568 | |||||
SCORE 100 Renew service Date: September 21, 2012 Contractor: Shaw Brothers Construction Client: Meilleur Maurice M Jr | Permit type: Row excavation | Permit status: Issued | Permit id: En12-0991 | |||||
SCORE 56 Upgrade (200a u/g) Date: March 29, 2012 Contractor: Peter Martinic Client: Miriam A Martincic | Permit type: Electrical | Permit status: Expired | Permit id: Bs12-0618 | |||||
SCORE 99 Generator w/auto transfer switch Client: Gail Scherba | Permit type: Electrical | Permit status: Finaled | Completion date: April 21, 2010 | Permit id: Bs10-0701 | |||||
SCORE 86 Generator w auto transfer switch Client: Gail Scherba | Permit type: Electrical | Permit status: Finaled | Completion date: April 21, 2010 | Permit id: Bs10-0701 | |||||
SCORE 99 Mast and bonding Client: John Oneill | Permit type: Electrical | Permit status: Finaled | Completion date: April 16, 2010 | Permit id: Bs10-0702 | |||||
SCORE 100 Service upgrade Date: June 11, 2010 Contractor: Michael G. Rumer Client: Andrew Nadolski | Permit type: Electrical | Permit status: Finaled | Completion date: January 5, 2011 | Permit id: Bs10-1175 | |||||
SCORE 86 Mast and bonding Client: John Oneill | Permit type: Electrical | Permit status: Finaled | Completion date: April 16, 2010 | Permit id: Bs10-0702 | |||||
SCORE 92 Multifamily Client: Campus Property Management | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: April 20, 2010 | Permit id: Bs09-2211 | |||||
SCORE 100 Multifamily Client: Campus Property Management | Permit type: Electrical | Permit status: Finaled | Completion date: April 15, 2010 | Permit id: Bs10-0239 | |||||
Void - community blood bank of champaign Date: June 11, 2012 Client: Andrea L Poling | Permit type: Electrical | Permit status: Void | Permit id: Bs12-1170 | |||||
SCORE 100 Plumbing Date: July 19, 2012 Contractor: Lanz Htg. And Cooling Client: Bankier Family | Permit status: Finaled | Completion date: July 19, 2012 | Permit id: Bs12-1478 | |||||
SCORE 86 For washer and dryer Date: July 26, 2012 Contractor: Bankier Client: Bankier Family | Permit type: Electrical | Permit status: Finaled | Completion date: August 7, 2012 | Permit id: Bs12-1535 | |||||
SCORE 76 Electrical Client: Ronald W Koehler | Permit status: Finaled | Completion date: July 20, 2012 | Permit id: Bs12-1482 | |||||
SCORE 100 Construct new driveway approach Date: October 2, 2012 Contractor: Harmon Excavating Client: Rasch Joel | Permit type: Driveway | Permit status: Issued | Permit id: En12-1021 | |||||
SCORE 90 Sfd Client: Willard Helmuth Construction | Permit type: Bldg 1f | Permit status: Issued | Permit id: Bs12-1684 | |||||
SCORE 90 Sfd Date: September 7, 2012 Contractor: Willard Helmuth Construction Client: Willard Helmuth Construction | Permit type: Erosion | Permit status: Issued | Permit id: En12-0918 | |||||
SCORE 90 Electrical Date: September 21, 2012 Contractor: Corray Electric Client: Willard Helmuth Construction | Permit status: Issued | Permit id: Bs12-1948 | |||||
SCORE 89 Hvac Client: Willard Helmuth Construction | Permit status: Issued | Permit id: Bs12-2183 | |||||
SCORE 100 Fireplace Date: November 20, 2012 Contractor: Clayton Sales Client: Willard Helmuth Construction | Permit status: Issued | Permit id: Bs12-2374 | |||||
SCORE 99 Plumbing Date: October 9, 2012 Contractor: Aspire Plumbing Client: Willard Helmuth Construction | Permit status: Issued | Permit id: Bs12-2081 | |||||
SCORE 100 Install new sanitary sewer service Date: October 2, 2012 Contractor: Harmon Excavating Client: Rasch Joel | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: September 24, 2012 | Permit id: En12-1020 | |||||
Install new sump discharging to 6" spd at rear of lot Date: August 17, 2012 Client: Rasch Joel | Permit type: Storm sewer | Permit status: Finaled | Completion date: August 17, 2012 | Permit id: En12-0807 | |||||
SCORE 89 Hvac Client: Willard Helmuth Construction | Permit status: Issued | Permit id: Bs12-2183 | |||||
SCORE 87 Electric for water heater Date: April 21, 2010 Contractor: Bernard Ramos Permit type: Electrical | Permit status: Expired | Permit id: Bs10-0778 | |||||
SCORE 100 Demo/duplex Client: City Of Champaign | Permit type: Demo 1f2f | Permit status: Finaled | Completion date: July 9, 2012 | Permit id: Bs12-0512 | |||||
SCORE 99 Furnace & a/c replacement Client: Bankier Family | Permit type: Hvac | Permit status: Finaled | Completion date: November 15, 2012 | Permit id: Bs12-2242 | |||||
SCORE 96 Multi-family (27 units - see notes) Date: November 5, 2012 Contractor: Lanz Plbg Client: Bankier Family | Permit type: Plumbing | Permit status: Finaled | Completion date: November 13, 2012 | Permit id: Bs12-2273 | |||||
SCORE 99 Furnace & a c replacement Client: Bankier Family | Permit type: Hvac | Permit status: Finaled | Completion date: November 15, 2012 | Permit id: Bs12-2242 | |||||
SCORE 96 Plumbing Date: November 20, 2012 Contractor: Lanz Plbg Permit status: Issued | Permit id: Bs12-2380 | |||||
SCORE 100 A/c replacement Client: Bernard Puglisimary Gorski | Permit type: Hvac | Permit status: Finaled | Completion date: May 14, 2012 | Permit id: Bs12-0811 | |||||
SCORE 100 Nw suite Date: April 1, 2011 Contractor: Mattex Service Co. Inc Client: Bernard Puglisimary Gorski | Permit type: Hvac | Permit status: Finaled | Completion date: April 5, 2011 | Permit id: Bs11-0561 | |||||
SCORE 100 Nw suite Date: April 1, 2011 Contractor: Mattex Service Co., Inc Client: Bernard Puglisi Mary Gorski | Permit type: Hvac | Permit status: Finaled | Completion date: April 5, 2011 | Permit id: Bs11-0561 | |||||
SCORE 100 A c replacement Client: Bernard Puglisi Mary Gorski | Permit type: Hvac | Permit status: Finaled | Completion date: May 14, 2012 | Permit id: Bs12-0811 | |||||
Retire hydrant (3174) Date: May 23, 2003 Permit type: Row excavation | Permit status: Issued | Permit id: En03-0534 | |||||
Retire hydrant (3174) Date: May 23, 2003 Permit type: Row excavation | Permit status: Issued | Permit id: En03-0533 | |||||
Plumbing Date: May 6, 2010 Permit status: Finaled | Completion date: April 27, 2010 | Permit id: Bs10-0908 | |||||
SCORE 100 Plumbing Date: May 6, 2010 Contractor: Rebath Of Illinois Client: Jack & Barbara May | Permit status: Finaled | Completion date: April 27, 2010 | Permit id: Bs10-0908 | |||||
Plumbing Date: May 6, 2010 Client: Thomas Walsh | Permit status: Issued | Permit id: Bs10-0918 | |||||
SCORE 100 Plumbing Date: May 6, 2010 Contractor: Rebath Of Illinois Client: Thomas Walsh | Permit status: Issued | Permit id: Bs10-0918 | |||||
SCORE 100 Service upgrade Date: May 7, 2010 Contractor: Butchers Electrical Service Client: Charles Blixen | Permit type: Electrical | Permit status: Finaled | Completion date: May 10, 2010 | Permit id: Bs10-0928 | |||||
SCORE 93 Service upgrade Date: May 7, 2010 Contractor: Butchers Electrical Service, Client: Charles Blixen | Permit type: Electrical | Permit status: Finaled | Completion date: May 10, 2010 | Permit id: Bs10-0928 | |||||
SCORE 100 Water heater Date: May 10, 2010 Contractor: Hillards Plbg Htg And Cooling Client: Robert G Vandiver | Permit type: Plumbing | Permit status: Finaled | Completion date: July 13, 2010 | Permit id: Bs10-0935 | |||||
SCORE 100 Water heater Date: May 10, 2010 Contractor: Hillards Plbg, Htg And Cooling Client: Robert G Vandiver | Permit type: Plumbing | Permit status: Finaled | Completion date: July 13, 2010 | Permit id: Bs10-0935 | |||||
SCORE 100 Water heater Date: May 10, 2010 Contractor: Ameriplumb Client: David G Pyer | Permit type: Plumbing | Permit status: Finaled | Completion date: May 24, 2010 | Permit id: Bs10-0937 | |||||
SCORE 100 Sanitary sewer service repair Date: July 15, 2010 Contractor: Stephens Excav. And Concrete Permit type: Sanitary sewer | Permit status: Finaled | Completion date: July 12, 2010 | Permit id: En10-0700 | |||||
SCORE 100 Sfd detached garage Permit type: Bldg 1f2f gar | Permit status: Finaled | Completion date: July 12, 2010 | Permit id: Bs10-0947 | |||||
SCORE 100 Sfd detached garage Permit type: Demo 1f2f | Permit status: Finaled | Completion date: December 6, 2010 | Permit id: Bs10-0926 | |||||
SCORE 93 Electrical Client: Randy Locke | Permit status: Finaled | Completion date: January 13, 2011 | Permit id: Bs10-1204 | |||||
Sfd detached garage Date: May 19, 2010 Permit type: Grading | Permit status: Issued | Permit id: En10-0510 | |||||
SCORE 93 Electrical Client: Randy Locke | Permit status: Finaled | Completion date: January 13, 2011 | Permit id: Bs10-1204 | |||||
SCORE 100 Water heater Date: May 18, 2010 Contractor: Ameriplumb Client: John G Stuff | Permit type: Plumbing | Permit status: Finaled | Completion date: July 12, 2010 | Permit id: Bs10-0993 | |||||
SCORE 99 Multi-family (balconies) Client: Campus Property Management | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: June 2, 2011 | Permit id: Bs10-1016 | |||||
SCORE 100 Water heater Date: June 1, 2010 Contractor: Thomasboro Plumbing Client: Marc R Miller | Permit type: Plumbing | Permit status: Finaled | Completion date: June 7, 2010 | Permit id: Bs10-1078 | |||||
SCORE 95 Electrical Client: Bankier Family | Permit status: Finaled | Completion date: March 3, 2011 | Permit id: Bs10-1082 | |||||
SCORE 95 Electrical Client: Bankier Family | Permit status: Finaled | Completion date: March 3, 2011 | Permit id: Bs09-0751 | |||||
SCORE 72 Nail salon (modern nail salon) Client: Campus Investors Llc | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: September 29, 2010 | Permit id: Bs10-1316 | |||||
SCORE 100 Nail salon (modern nail salon) Client: Campus Investors Llc | Permit type: Hvac | Permit status: Finaled | Completion date: August 31, 2010 | Permit id: Bs10-1385 | |||||
SCORE 100 Change of contractor (nail salon) Date: September 16, 2010 Contractor: R.C.S Plbg. And Hvac Client: Campus Investors Llc | Permit type: Plumbing | Permit status: Finaled | Completion date: September 27, 2010 | Permit id: Bs10-1900 | |||||
SCORE 99 Nail salon (modern nail salon) Client: Campus Investors Llc | Permit type: Electrical | Permit status: Finaled | Completion date: September 2, 2010 | Permit id: Bs10-1614 | |||||
SCORE 72 Nail salon (modern nail salon) Client: Campus Investors Llc | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: September 29, 2010 | Permit id: Bs10-1316 | |||||
SCORE 100 Final thru r/i (nail salon) Date: August 4, 2010 Contractor: Whalens Plumbing Client: Campus Investors Llc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 12, 2010 | Permit id: Bs10-1570 | |||||
SCORE 80 Repair main Date: October 4, 2005 Contractor: American Water Permit type: Row excavation | Permit status: Issued | Permit id: En05-2363 | |||||
G&d Date: November 3, 2004 Client: Allied Title Service | Permit type: Grading | Permit status: Issued | Completion date: November 3, 2004 | Permit id: En04-1423 | |||||
SCORE 62 G&d Date: November 3, 2004 Contractor: A1 Pavement Maintenance Client: Allied Title Service | Permit type: Grading | Permit status: Issued | Completion date: November 3, 2004 | Permit id: En04-1423 | |||||
SCORE 100 Maint. Mains (2420) Date: October 13, 2006 Contractor: Shaw Brothers Construction Client: Illinois-American Water Compan | Permit type: Row excavation | Permit status: Issued | Permit id: En06-2687 | |||||
SCORE 100 Service upgrade Date: July 28, 2010 Contractor: Mx Electric Inc Client: Shirley Heath | Permit type: Electrical | Permit status: Finaled | Completion date: January 13, 2011 | Permit id: Bs10-1511 | |||||
SCORE 100 Service upgrade Date: July 28, 2010 Contractor: Mx Electric, Inc Client: Shirley Heath | Permit type: Electrical | Permit status: Finaled | Completion date: January 13, 2011 | Permit id: Bs10-1511 | |||||
SCORE 100 Sprinkler Client: Psw Properties Llc | Permit status: Finaled | Completion date: April 30, 2010 | Permit id: Bs10-1541 | |||||
SCORE 100 Basement, 2nd & 3rd flrs & remndr of bldg Client: Psw Properties Llc | Permit type: Sprinkler | Permit status: Finaled | Completion date: August 26, 2010 | Permit id: Bs10-1596 | |||||
SCORE 100 Temporarily occupy row for sanitary repair Date: June 1, 2009 Contractor: Stephens Excav. And Concrete Client: Merryman Shirley | Permit type: Row occupancy | Permit status: Issued | Permit id: En09-0406 | |||||
SCORE 100 Install new sanitary sewer service. Date: June 1, 2009 Contractor: Stephens Excav. And Concrete Client: Merryman Shirley | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: May 18, 2009 | Permit id: En09-0405 | |||||
SCORE 98 Connect drain tile line to strom sewer manhole Date: August 13, 2009 Contractor: Ezell Excavating Client: Faron Properties Llc | Permit type: Storm sewer | Permit status: Issued | Permit id: En09-0728 | |||||
SCORE 100 1" service Date: September 16, 2009 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En09-0865 | |||||
SCORE 100 2" service Date: September 16, 2009 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En09-0873 | |||||
SCORE 89 Repair sanitary sewer service Date: June 21, 2011 Contractor: M And S Repair Excavation Client: Weber Daniel E | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: June 21, 2011 | Permit id: En11-0551 | |||||
SCORE 89 Temp occupy row for sanitary service repair Date: June 27, 2011 Contractor: M And S Repair Excavation Client: Weber Daniel E | Permit type: Row occupancy | Permit status: Issued | Permit id: En11-0566 | |||||
SCORE 100 Repair sanitary sewer service (co for nsd) Date: January 3, 2012 Contractor: Stephens Excav. And Concrete Permit type: Sanitary sewer | Permit status: Finaled | Completion date: December 22, 2011 | Permit id: En12-0002 | |||||
SCORE 100 Water heater Date: March 28, 2012 Contractor: Clark Plbg. And Htg Permit type: Plumbing | Permit status: Finaled | Completion date: April 12, 2012 | Permit id: Bs12-0601 | |||||
SCORE 100 Repair sanitary sewer service (nsd job, no fee) Date: May 3, 2012 Contractor: Stephens Excav. And Concrete Permit type: Sanitary sewer | Permit status: Finaled | Completion date: April 27, 2012 | Permit id: En12-0445 | |||||
SCORE 100 Cleanout installation Date: July 19, 2011 Contractor: Docher Construction Client: Jones Property Management | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: July 18, 2011 | Permit id: En11-0628 | |||||
SCORE 100 Retire service Date: April 23, 2012 Contractor: Shaw Brothers Construction Client: Allen Joseph M | Permit type: Row excavation | Permit status: Issued | Permit id: En12-0413 | |||||
SCORE 99 Demo - sfd Client: Joseph M Allen | Permit type: Demo 1f2f | Permit status: Finaled | Completion date: August 23, 2012 | Permit id: Bs12-0868 | |||||
SCORE 100 Repair sanitary sewer service Date: October 16, 2012 Contractor: Stephens Excav. And Concrete Client: Brotherton Joel E | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: October 11, 2012 | Permit id: En12-1056 | |||||
SCORE 96 New sanitary sewer service Date: September 12, 2011 Contractor: Lanz Plbg Permit type: Sanitary sewer | Permit status: Finaled | Completion date: August 29, 2011 | Permit id: En11-0778 | |||||
SCORE 96 New sanitary sewer service Date: September 12, 2011 Contractor: Lanz Plbg Permit type: Sanitary sewer | Permit status: Finaled | Completion date: September 6, 2011 | Permit id: En11-0779 | |||||
SCORE 95 Water heater Date: April 15, 2011 Contractor: Mr. Rooter Client: Steven N Kreps | Permit type: Plumbing | Permit status: Finaled | Completion date: May 24, 2011 | Permit id: Bs11-0673 | |||||
SCORE 95 Repair sanitary sewer service Date: November 29, 2011 Contractor: Mr. Rooter Client: Kreps Steven N | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: November 28, 2011 | Permit id: En11-1087 | |||||
Repair sanitary sewer service Date: September 22, 2011 Client: Kreoger Mark | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: September 8, 2011 | Permit id: En11-0841 | |||||
SCORE 95 Repair sanitary sewer service Date: September 22, 2011 Contractor: Rotorooter Client: Kreoger Mark | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: September 8, 2011 | Permit id: En11-0841 | |||||
SCORE 95 Water heater (westbury apts.) Date: July 10, 2009 Contractor: Mr. Rooter Client: Mckinley, Champaign | Permit type: Plumbing | Permit status: Finaled | Completion date: July 21, 2009 | Permit id: Bs09-1373 | |||||
SCORE 100 Maint. Services Date: October 12, 2011 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En11-0919 | |||||
SCORE 99 Multi-family (bldg. 5) Permit type: Bldg c new add | Permit status: Cond final | Permit id: Bs11-1855 | |||||
SCORE 100 Multi-family (bldg. 5) Date: October 11, 2011 Contractor: Wells And Wells Construction Permit type: Erosion | Permit status: Issued | Permit id: En11-0892 | |||||
SCORE 100 Temporary service Date: December 8, 2011 Contractor: Thomas Electric Permit type: Electrical | Permit status: Finaled | Completion date: February 13, 2012 | Permit id: Bs11-2447 | |||||
SCORE 84 Multi-family (bldg. 5) Date: December 12, 2011 Contractor: Triple M Plbg. And Hvac Permit type: Plumbing | Permit status: Finaled | Completion date: July 13, 2012 | Permit id: Bs11-2457 | |||||
Multi-family (bldg. 5) Date: February 29, 2012 Value: $14,000 Permit type: Sprinkler | Permit status: Finaled | Completion date: September 7, 2012 | Permit id: Bs12-0343 | |||||
SCORE 95 Water service/fire service (bldg. 5) Date: December 13, 2011 Contractor: A And R Mechanical Permit type: Plumbing | Permit status: Finaled | Completion date: July 13, 2012 | Permit id: Bs11-2479 | |||||
SCORE 59 Multi-family (bldg. 5) Permit type: Hvac | Permit status: Finaled | Completion date: July 20, 2012 | Permit id: Bs12-0430 | |||||
Fire alarm (bldg. 5) Date: March 16, 2012 Value: $8,053 Permit type: Fire alarm | Permit status: Finaled | Completion date: July 23, 2012 | Permit id: Bs12-0471 | |||||
SCORE 100 Multi-family (bldg. 5) Permit type: Electrical | Permit status: Finaled | Completion date: November 13, 2012 | Permit id: Bs12-0353 | |||||
SCORE 95 Water service fire service (bldg. 5) Date: December 13, 2011 Contractor: A And R Mechanical Permit type: Plumbing | Permit status: Finaled | Completion date: July 13, 2012 | Permit id: Bs11-2479 | |||||
SCORE 100 Multi-family (bldg. 5) Permit type: Sprinkler | Permit status: Finaled | Completion date: September 7, 2012 | Permit id: Bs12-0343 | |||||
SCORE 100 Fire alarm (bldg. 5) Permit type: Fire alarm | Permit status: Finaled | Completion date: July 23, 2012 | Permit id: Bs12-0471 | |||||
SCORE 56 Multi-family (bldg. 5) Permit type: Hvac | Permit status: Finaled | Completion date: July 20, 2012 | Permit id: Bs12-0430 | |||||
SCORE 95 Repair sanitary sewer service Date: November 29, 2011 Contractor: Mr. Rooter Client: Pankau Joni M | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: November 21, 2011 | Permit id: En11-1088 | |||||
SCORE 99 Sfd Client: David F Keeling Trustee | Permit type: Bldg 1f | Permit status: Finaled | Completion date: July 15, 2011 | Permit id: Bs11-0215 | |||||
SCORE 100 Fireplace Client: David F Keeling Trustee | Permit status: Finaled | Completion date: July 13, 2011 | Permit id: Bs11-0621 | |||||
SCORE 99 Sfd Date: February 16, 2011 Contractor: Pettyjohn Builders Client: David F Keeling Trustee | Permit type: Grading | Permit status: Issued | Permit id: En11-0122 | |||||
SCORE 100 New driveway approach Date: March 1, 2011 Contractor: Harmon Excavating Client: Keeling David F Trustee | Permit type: Driveway | Permit status: Finaled | Completion date: June 17, 2011 | Permit id: En11-0149 | |||||
SCORE 100 New sanitary sewer connection Date: March 1, 2011 Contractor: Harmon Excavating Client: Keeling David F Trustee | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: February 28, 2011 | Permit id: En11-0148 | |||||
SCORE 100 Sfd Date: March 14, 2011 Contractor: Rich Plumbing Client: David F Keeling Trustee | Permit type: Plumbing | Permit status: Finaled | Completion date: July 14, 2011 | Permit id: Bs11-0410 | |||||
New connection to storm sewer in parkway Date: February 21, 2011 Client: Keeling David F Trustee | Permit type: Storm sewer | Permit status: Issued | Permit id: En11-0126 | |||||
SCORE 100 1" service Date: August 10, 2011 Contractor: Shaw Brothers Construction Client: Keeling David F Trustee | Permit type: Row excavation | Permit status: Issued | Permit id: En11-0691 | |||||
SCORE 89 Hvac Client: David F Keeling Trustee | Permit status: Finaled | Completion date: July 15, 2011 | Permit id: Bs11-0592 | |||||
SCORE 89 Hvac Client: David F Keeling Trustee | Permit status: Finaled | Completion date: July 15, 2011 | Permit id: Bs11-0592 | |||||
SCORE 100 New/temp Date: March 1, 2011 Contractor: Block Electric Client: David F Keeling Trustee | Permit type: Electrical | Permit status: Finaled | Completion date: July 15, 2011 | Permit id: Bs11-0333 | |||||
SCORE 100 Maint. Services Date: September 16, 2009 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En09-0862 | |||||
SCORE 100 Hvac Client: #1 Wok | Permit type: Hvac | Permit status: Expired | Permit id: Bs02-0389 | |||||
SCORE 70 Hood Client: The, Larson Co | Permit type: Hvac | Permit status: Finaled | Completion date: June 24, 2004 | Permit id: Bs04-1125 | |||||
Plbg Date: May 23, 2003 Client: The, Larson Co | Permit type: Plumbing | Permit status: Void | Permit id: Bs03-1151 | |||||
Elec-void Date: June 24, 2003 Value: $6,000 Client: The, Larson Co | Permit type: Electrical | Permit status: Void | Permit id: Bs03-1429 | |||||
SCORE 100 Sprinkler Client: The, Larson Co | Permit type: Sprinkler | Permit status: Finaled | Completion date: June 24, 2004 | Permit id: Bs03-1881 | |||||
SCORE 100 Elec Client: The, Larson Co | Permit type: Electrical | Permit status: Finaled | Completion date: May 17, 2004 | Permit id: Bs04-0084 | |||||
SCORE 100 Plbg Date: February 5, 2004 Contractor: Brite Plumbing Client: The, Larson Co | Permit type: Plumbing | Permit status: Finaled | Completion date: June 24, 2004 | Permit id: Bs04-0237 | |||||
SCORE 100 Ansul Client: The, Larson Co | Permit type: Hvac | Permit status: Finaled | Completion date: June 16, 2004 | Permit id: Bs04-1346 | |||||
Hvac Date: June 23, 2003 Value: $4,000 Client: The, Larson Co | Permit type: Hvac | Permit status: Finaled | Completion date: June 16, 2004 | Permit id: Bs03-1399 | |||||
SCORE 93 Plbg Date: May 23, 2003 Contractor: A1 Plbg. And Htg Client: The, Larson Co | Permit type: Plumbing | Permit status: Void | Permit id: Bs03-1151 | |||||
SCORE 81 Hvac Client: The, Larson Co | Permit type: Hvac | Permit status: Finaled | Completion date: June 16, 2004 | Permit id: Bs03-1399 | |||||
SCORE 93 Elec-void Client: The, Larson Co | Permit type: Electrical | Permit status: Void | Permit id: Bs03-1429 | |||||
SCORE 98 Alter/restaurant-bar Client: The, Larson Co | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: June 25, 2004 | Permit id: Bs03-0687 | |||||
SCORE 100 Heating replacement Permit type: Hvac | Permit status: Expired | Permit id: Bs09-1246 | |||||
SCORE 100 Hvac Client: Bridgett Jennifer | Permit status: Finaled | Completion date: November 9, 2009 | Permit id: Bs09-2338 | |||||
SCORE 86 Water heater Date: April 16, 2009 Contractor: Ameriplumb Plumbing Co Client: Jennifer Bridgett | Permit type: Plumbing | Permit status: Finaled | Completion date: May 4, 2009 | Permit id: Bs09-0674 | |||||
SCORE 100 Repair sanitary sewer service Date: July 30, 2012 Contractor: Duce Construction Client: Bridgett Jennifer | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: July 27, 2012 | Permit id: En12-0760 | |||||
SCORE 100 Htg Client: Hans H Hock | Permit type: Hvac | Permit status: Finaled | Completion date: April 15, 2010 | Permit id: Bs09-2671 | |||||
SCORE 100 Furnace replacement Client: Hans H Hock | Permit type: Hvac | Permit status: Finaled | Completion date: April 27, 2011 | Permit id: Bs11-0741 | |||||
SCORE 100 Water service Date: November 10, 2011 Contractor: Clark Plbg. And Htg Client: Hans H Hock | Permit type: Plumbing | Permit status: Finaled | Completion date: November 7, 2011 | Permit id: Bs11-2214 | |||||
SCORE 95 A/c replacement Client: Hans H Hock | Permit type: Hvac | Permit status: Finaled | Completion date: April 25, 2012 | Permit id: Bs12-0814 | |||||
SCORE 100 Electrical Client: Mirsung Grocery | Permit status: Finaled | Completion date: March 17, 2010 | Permit id: Bs10-0034 | |||||
SCORE 100 Ice damage Date: March 2, 2010 Contractor: Witte Electric Client: Sofranko Andrew J | Permit type: Electrical | Permit status: Finaled | Completion date: March 2, 2010 | Permit id: Bs10-0388 | |||||
SCORE 99 Water heater Date: May 17, 2010 Contractor: Aspire Plumbing Client: Stephen J. Lesueur | Permit type: Plumbing | Permit status: Finaled | Completion date: June 11, 2010 | Permit id: Bs10-0979 | |||||
SCORE 100 Furnace & a/c replacement Client: Stephen J Lesueur | Permit type: Hvac | Permit status: Expired | Permit id: Bs10-0245 | |||||
SCORE 87 Sfd/roof Client: Ramos Esther | Permit type: Bldg 1f2f add alt | Permit status: Expired | Permit id: Bs10-1932 | |||||
SCORE 56 Storm damage Client: Robert J Birdsell | Permit type: Electrical | Permit status: Finaled | Completion date: June 24, 2011 | Permit id: Bs11-1198 | |||||
SCORE 96 Washer box Date: July 26, 2011 Contractor: Lanz Plbg Client: Bankier Family | Permit type: Plumbing | Permit status: Finaled | Completion date: July 28, 2011 | Permit id: Bs11-1426 | |||||
SCORE 99 Washer/dryer outlets Client: Bankier Family | Permit type: Electrical | Permit status: Finaled | Completion date: August 15, 2011 | Permit id: Bs11-1424 | |||||
SCORE 100 Maint. Services Date: June 16, 2011 Contractor: Shaw Brothers Construction Client: Jeske Leon E | Permit type: Row excavation | Permit status: Issued | Permit id: En11-0515 | |||||
SCORE 100 Water heater Date: January 11, 2012 Contractor: Twohey Plumbing Permit type: Plumbing | Permit status: Finaled | Completion date: January 31, 2012 | Permit id: Bs12-0048 | |||||
SCORE 100 Temp occupy lane of green st for roughly an hour Date: May 23, 2012 Contractor: Champaign Heating And Air Permit type: Row occupancy | Permit status: Issued | Permit id: En12-0542 | |||||
SCORE 100 Temporarily occupy portion of parking lot and green Date: July 6, 2012 Contractor: Champaign Heating And Air Permit type: Row occupancy | Permit status: Issued | Permit id: En12-0664 | |||||
SCORE 100 A/c replacement Client: Block & Holt Enterprises | Permit type: Hvac | Permit status: Finaled | Completion date: June 12, 2012 | Permit id: Bs12-1049 | |||||
SCORE 100 A/c replacement Client: Block & Holt Enterprises | Permit type: Hvac | Permit status: Finaled | Completion date: August 6, 2012 | Permit id: Bs12-1401 | |||||
SCORE 100 Demo/storage Client: Dgs Properties | Permit type: Demo c | Permit status: Expired | Permit id: Bs05-4657 | |||||
SCORE 100 1" service Date: September 16, 2009 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En09-0866 | |||||
SCORE 100 Construct new driveway approach onto dobbins (w-most) Date: November 5, 2009 Contractor: Stark Excavating Client: Burch James | Permit type: Driveway | Permit status: Finaled | Completion date: May 14, 2010 | Permit id: En09-1040 | |||||
SCORE 100 Construct new driveway approach onto anthony Date: November 5, 2009 Contractor: Stark Excavating Client: Burch James | Permit type: Driveway | Permit status: Finaled | Completion date: November 11, 2009 | Permit id: En09-1038 | |||||
SCORE 100 Construct new driveway approach onto dobbins (e-most) Date: November 5, 2009 Contractor: Stark Excavating Client: Burch James | Permit type: Driveway | Permit status: Finaled | Completion date: November 30, 2009 | Permit id: En09-1039 | |||||
SCORE 56 Sign Date: August 19, 2009 Contractor: Cln Art Client: Jpbm Enterprises | Permit status: Issued | Permit id: Pl09-0098 | |||||
SCORE 100 Maint. Services Date: May 25, 2011 Contractor: Shaw Brothers Construction Client: Heckert M J | Permit type: Row excavation | Permit status: Issued | Permit id: En11-0446 | |||||
Repair sanitary sewer service Date: September 22, 2011 Client: Reid Rebecca S | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: September 8, 2011 | Permit id: En11-0840 | |||||
SCORE 95 Repair sanitary sewer service Date: September 22, 2011 Contractor: Rotorooter Client: Reid Rebecca S | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: September 8, 2011 | Permit id: En11-0840 | |||||
SCORE 100 Maint. Services Date: March 12, 2012 Contractor: Shaw Brothers Construction Client: Pingan Property Inc | Permit type: Row excavation | Permit status: Issued | Permit id: En12-0219 | |||||
SCORE 100 Repair sanitary sewer service Date: October 30, 2012 Contractor: Stephens Excav. And Concrete Client: Simmons F William | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: October 22, 2012 | Permit id: En12-1103 | |||||
SCORE 100 Temp occupy row (exc) for san repair Date: October 30, 2012 Contractor: Stephens Excav. And Concrete Client: Simmons F William | Permit type: Row occupancy | Permit status: Issued | Permit id: En12-1104 | |||||
SCORE 100 Salvation army Client: Salvation Army | Permit type: Sprinkler | Permit status: Finaled | Completion date: August 31, 2006 | Permit id: Bs06-2205 | |||||
SCORE 100 Suppression Client: Salvation Army | Permit type: Hvac | Permit status: Finaled | Completion date: August 29, 2006 | Permit id: Bs06-3766 | |||||
SCORE 100 Sign Date: October 3, 2006 Contractor: American Dowell Signs Client: The, Salvation Army | Permit status: Issued | Permit id: Pl06-0171 | |||||
SCORE 100 Salvation army Client: Salvation Army | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: September 19, 2006 | Permit id: Bs06-1438 | |||||
SCORE 100 Salvation army Client: Salvation Army | Permit type: Electrical | Permit status: Finaled | Completion date: August 29, 2006 | Permit id: Bs06-1681 | |||||
SCORE 89 Salvation army Client: Salvation Army | Permit type: Hvac | Permit status: Finaled | Completion date: August 22, 2006 | Permit id: Bs06-2631 | |||||
SCORE 96 Circuit and subpanel Client: The Salvation Army | Permit type: Electrical | Permit status: Expired | Permit id: Bs11-1423 | |||||
SCORE 89 Salvation army Date: June 6, 2006 Contractor: Reliable Mech. Co Client: Salvation Army | Permit type: Plumbing | Permit status: Finaled | Completion date: August 29, 2006 | Permit id: Bs06-2442 | |||||
SCORE 100 Salvation army Client: Salvation Army | Permit type: Electrical | Permit status: Finaled | Completion date: August 29, 2006 | Permit id: Bs06-1681 | |||||
SCORE 100 Salvation army Client: Salvation Army | Permit type: Sprinkler | Permit status: Finaled | Completion date: August 31, 2006 | Permit id: Bs06-2205 | |||||
SCORE 100 Sign Date: November 8, 2010 Contractor: American Dowell Signs Client: Green St Center Lt03755862 | Permit status: Issued | Permit id: Pl10-0153 | |||||
SCORE 79 Plasma center Client: Green St Center Lt03755862 | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: June 15, 2009 | Permit id: Bs09-0874 | |||||
SCORE 100 Hair cuttery Date: November 8, 2010 Contractor: American Dowell Signs Client: Green St Center Lt03755862 | Permit type: Sign | Permit status: Issued | Permit id: Pl10-0151 | |||||
SCORE 62 Sign Date: June 13, 2011 Contractor: Gameday Client: Bankier Land Investment | Permit status: Issued | Permit id: Pl11-0110 | |||||
SCORE 56 Sign Date: May 3, 2010 Contractor: Architectural Expressions Permit status: Issued | Permit id: Pl10-0077 | |||||
SCORE 62 Sidewalk sign Date: May 21, 2012 Contractor: Gameday Client: Bankier Land Investment | Permit type: Sign | Permit status: Issued | Permit id: Pl12-0080 | |||||
SCORE 56 Sign Date: March 30, 2010 Contractor: Gameday Sports Client: Bankier Land Investment | Permit status: Issued | Permit id: Pl10-0046 | |||||
SCORE 56 Office Client: Meyer, David | Permit type: Bldg c alt rep | Permit status: Expired | Permit id: Bs04-1567 | |||||
SCORE 56 Office Client: Meyer, David | Permit type: Bldg c alt rep | Permit status: Expired | Permit id: Bs04-1567 | |||||
SCORE 100 Htg. & a/c replacement Client: Tripathy Neena | Permit type: Hvac | Permit status: Expired | Permit id: Bs09-1364 | |||||
SCORE 59 Hvac Client: Amcore Bank | Permit status: Finaled | Completion date: November 18, 2009 | Permit id: Bs09-1634 | |||||
SCORE 100 Water service Date: August 7, 2009 Contractor: Clark Plbg. And Htg Client: Christophercindy Tillman | Permit type: Plumbing | Permit status: Finaled | Completion date: August 11, 2009 | Permit id: Bs09-1646 | |||||
SCORE 96 Water heater Date: October 22, 2009 Contractor: Enger Brothers Plumbing Permit type: Plumbing | Permit status: Finaled | Completion date: October 27, 2009 | Permit id: Bs09-2206 | |||||
SCORE 100 Water heater Date: December 21, 2009 Contractor: Simmons Plbg. And Htg Client: Douglas G Peterson | Permit type: Plumbing | Permit status: Issued | Permit id: Bs09-2673 | |||||
SCORE 100 Hvac Client: Brad Peterson | Permit status: Finaled | Completion date: December 11, 2009 | Permit id: Bs09-2355 | |||||
SCORE 100 Pavement degradation fee Date: March 19, 2012 Contractor: Shaw Brothers Construction Client: Peterson Douglas G | Permit type: Row excavation | Permit status: Issued | Permit id: En12-0257 | |||||
SCORE 100 Furnace & a/c replacement Client: Charles Nogle | Permit type: Hvac | Permit status: Finaled | Completion date: December 3, 2010 | Permit id: Bs10-1041 | |||||
SCORE 100 Hood supression (wienerschnitzel) Client: Charles Nogle | Permit type: Hvac | Permit status: Issued | Permit id: Bs11-1885 | |||||
SCORE 100 Sign Date: November 30, 2009 Contractor: American Dowell Signs Client: Nogle Charles | Permit status: Issued | Permit id: Pl09-0166 | |||||
SCORE 100 Furnace & a c replacement Client: Charles Nogle | Permit type: Hvac | Permit status: Finaled | Completion date: December 3, 2010 | Permit id: Bs10-1041 | |||||
SCORE 100 Electrical Date: July 19, 2010 Contractor: Jorgenson Electric Client: Donald Jeschke | Permit status: Finaled | Completion date: July 23, 2010 | Permit id: Bs10-1430 | |||||
SCORE 87 Smokes, panels, etc. Date: August 27, 2010 Contractor: Bernard Ramos Client: Eduardo Ramos | Permit type: Electrical | Permit status: Finaled | Completion date: September 21, 2010 | Permit id: Bs10-1768 | |||||
SCORE 100 Water heater Date: April 9, 2009 Contractor: Morse Mechanical Client: Eduardo Ramos | Permit type: Plumbing | Permit status: Finaled | Completion date: March 30, 2009 | Permit id: Bs09-0609 | |||||
SCORE 59 Refrigeration (circle k) Client: Macs Convenience Stores | Permit type: Hvac | Permit status: Finaled | Completion date: April 22, 2011 | Permit id: Bs11-0483 | |||||
SCORE 99 Conven. Store/service station (circle k) Client: Macs Convenience Stores | Permit type: Bldg c new add | Permit status: Finaled | Completion date: April 22, 2011 | Permit id: Bs10-0874 | |||||
SCORE 99 Conven. Store/service station (circle k) Client: Macs Convenience Stores | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2011 | Permit id: Bs11-0022 | |||||
SCORE 100 Conven. Store/service station (circle k) Date: January 10, 2011 Contractor: Clark Plbg. And Htg Client: Macs Convenience Stores | Permit type: Plumbing | Permit status: Finaled | Completion date: January 21, 2011 | Permit id: Bs11-0038 | |||||
Expired - restaurant (quiznos) Date: August 18, 2011 Value: $80,000 Client: Jsm Management | Permit type: Bldg c alt rep | Permit status: Expired | Permit id: Bs11-1588 | |||||
SCORE 98 Duplex Date: September 13, 2011 Contractor: Hillshire Construction Client: Dermel Properties | Permit type: Erosion | Permit status: Approved | Permit id: En11-0785 | |||||
SCORE 98 Duplex Client: Dermel Properties | Permit type: Bldg 2f | Permit status: Finaled | Completion date: May 30, 2012 | Permit id: Bs11-1667 | |||||
SCORE 100 Duplex Date: February 10, 2012 Contractor: Freds Plbg. Htg. And A C Client: Dermel Properties | Permit type: Plumbing | Permit status: Finaled | Completion date: May 18, 2012 | Permit id: Bs12-0242 | |||||
SCORE 100 Duplex Client: Dermel Properties | Permit type: Hvac | Permit status: Finaled | Completion date: May 24, 2012 | Permit id: Bs12-0495 | |||||
SCORE 98 Footing and foundation only Date: December 5, 2011 Contractor: Hillshire Construction Client: Dermel Properties | Permit type: Bldg ftg found | Permit status: Finaled | Completion date: May 25, 2012 | Permit id: Bs11-2388 | |||||
SCORE 98 Electrical Date: December 13, 2011 Contractor: Hillshire Construction Client: Dermel Properties | Permit status: Finaled | Completion date: May 24, 2012 | Permit id: Bs11-2469 | |||||
SCORE 100 Sprinkler head in furnace room Date: January 30, 2012 Contractor: Clark Plbg. And Htg Client: Gallivan Bldg Fund | Permit type: Sprinkler | Permit status: Issued | Permit id: Bs12-0161 | |||||
SCORE 100 Electrical Client: Gallivan Bldg Fund | Permit status: Expired | Permit id: Bs11-2219 | |||||
SCORE 71 Electrical Client: Allan Tuchman | Permit status: Finaled | Completion date: March 29, 2012 | Permit id: Bs12-0489 | |||||
SCORE 56 Service upgrade Client: Allan M Tuchman | Permit type: Electrical | Permit status: Finaled | Completion date: November 22, 2011 | Permit id: Bs11-2228 | |||||
SCORE 100 Office (dr. Eaton, dds) Date: March 26, 2012 Contractor: Rich Plumbing Permit type: Plumbing | Permit status: Finaled | Completion date: June 18, 2012 | Permit id: Bs12-0565 | |||||
SCORE 99 Office (dr. Eaton, dds) Permit type: Bldg c alt rep | Permit status: Cond final | Permit id: Bs12-0415 | |||||
SCORE 93 Office (dr. Eaton, dds) Permit type: Electrical | Permit status: Finaled | Completion date: June 4, 2012 | Permit id: Bs12-0648 | |||||
SCORE 93 Office (dr. Eaton, dds) Client: B Puglisi & M Gorski | Permit type: Electrical | Permit status: Finaled | Completion date: June 4, 2012 | Permit id: Bs12-0648 | |||||
SCORE 89 Office Client: Technology Plaza Llc | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: June 6, 2012 | Permit id: Bs12-0420 | |||||
SCORE 99 Office Client: Technology Plaza Llc | Permit type: Electrical | Permit status: Finaled | Completion date: June 1, 2012 | Permit id: Bs12-0684 | |||||
SCORE 89 Office Client: Technology Plaza Llc | Permit type: Bldg c alt rep | Permit status: Finaled | Completion date: June 6, 2012 | Permit id: Bs12-0420 | |||||
SCORE 100 A/c replacement (papa johns) Client: Giannopoulos Ted | Permit type: Hvac | Permit status: Finaled | Completion date: April 11, 2012 | Permit id: Bs12-0709 | |||||
SCORE 96 Set new meter Client: Daniel Walker | Permit type: Electrical | Permit status: Issued | Permit id: Bs12-0722 | |||||
SCORE 100 1 service Date: June 11, 2012 Contractor: Shaw Brothers Construction Client: Walker Daniel | Permit type: Row excavation | Permit status: Issued | Permit id: En12-0599 | |||||
SCORE 100 New kitchen wiring Permit type: Electrical | Permit status: Finaled | Completion date: August 31, 2012 | Permit id: Bs12-1121 | |||||
SCORE 96 Plumbing Date: April 26, 2012 Contractor: Lanz Plbg Client: Patrick J Donnelly | Permit status: Issued | Permit id: Bs12-0820 | |||||
Temporarily occupy parking lane with moving truck Date: January 17, 2012 Permit type: Row occupancy | Permit status: Issued | Permit id: En12-0012 | |||||
SCORE 100 Meter socket, riser, panel Client: Melisa Cornelius | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2012 | Permit id: Bs12-1720 | |||||
SCORE 79 Meter socket, riser, panel Client: Melisa Cornelius | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2012 | Permit id: Bs12-1720 | |||||
Retire hydrant (3174) Date: May 23, 2003 Permit type: Row excavation | Permit status: Issued | Permit id: En03-0535 | |||||
SCORE 80 Repair main Date: October 4, 2005 Contractor: American Water Permit type: Row excavation | Permit status: Issued | Permit id: En05-2357 | |||||
SCORE 100 Maint. Mains Date: July 17, 2007 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En07-1004 | |||||
SCORE 100 Maint. Mains Date: November 26, 2007 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En07-1712 | |||||
Close sidewalk for new store front Date: June 9, 2008 Permit type: Row occupancy | Permit status: Issued | Permit id: En08-0544 | |||||
SCORE 100 Maint. Mains Date: September 16, 2009 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En09-0860 | |||||
SCORE 56 Temp occupy row for two soil borings Date: February 3, 2010 Contractor: Midwest Engineering And Testing Client: Larson Co | Permit type: Row occupancy | Permit status: Issued | Permit id: En10-0109 | |||||
SCORE 100 Sanitary sewer service repair Date: September 14, 2010 Contractor: Stephens Excav. And Concrete Client: Henigman Kurt W | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: September 8, 2010 | Permit id: En10-0914 | |||||
SCORE 97 O/h riser Client: Kurt Henigman | Permit type: Electrical | Permit status: Finaled | Completion date: September 23, 2010 | Permit id: Bs10-1948 | |||||
Sanitary sewer service repair Date: June 10, 2011 Client: Warren Mary | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: June 10, 2011 | Permit id: En11-0492 | |||||
Continuation of sanitary sewer repair Date: June 17, 2011 Client: Warren Mary | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: June 16, 2011 | Permit id: En11-0538 | |||||
SCORE 95 Sanitary sewer service repair Date: June 10, 2011 Contractor: Rotorooter Client: Warren Mary | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: June 10, 2011 | Permit id: En11-0492 | |||||
SCORE 95 Continuation of sanitary sewer repair Date: June 17, 2011 Contractor: Rotorooter Client: Warren Mary | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: June 16, 2011 | Permit id: En11-0538 | |||||
Driveway Date: August 24, 2011 Client: Todd Larry And Carolyn | Permit type: Grading | Permit status: Issued | Permit id: En11-0743 | |||||
SCORE 56 Construct new driveway approach Date: August 24, 2011 Contractor: Hector Padron Dba Hpm Concrete Client: Todd Larry And Carolyn | Permit type: Driveway | Permit status: Finaled | Completion date: September 21, 2011 | Permit id: En11-0742 | |||||
Repair sanitary sewer service Date: January 24, 2012 Client: Tmjs Partners | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: January 26, 2012 | Permit id: En12-0077 | |||||
SCORE 95 Repair sanitary sewer service Date: January 24, 2012 Contractor: Rotorooter Client: Tmjs Partners | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: January 26, 2012 | Permit id: En12-0077 | |||||
Repair sanitary sewer service Date: May 29, 2012 Client: Wild Daniel C | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: May 29, 2012 | Permit id: En12-0550 | |||||
SCORE 95 Repair sanitary sewer service Date: May 29, 2012 Contractor: Rotorooter Client: Wild Daniel C | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: May 29, 2012 | Permit id: En12-0550 | |||||
SCORE 90 Sign Date: April 6, 2009 Contractor: Campus, Property Management Client: Campus, Property Management | Permit status: Issued | Permit id: Pl09-0050 | |||||
SCORE 99 Sign Date: October 25, 2011 Contractor: Campus Property Management Client: Campus Property Management | Permit status: Issued | Permit id: Pl11-0182 | |||||
SCORE 99 Sign Date: April 6, 2009 Contractor: Campus Property Management Client: Campus, Property Management | Permit status: Issued | Permit id: Pl09-0050 | |||||
SCORE 99 Sign Date: March 26, 2010 Contractor: Campus Property Management Client: Campus Property Management | Permit status: Issued | Permit id: Pl10-0042 | |||||
SCORE 62 Sfd porch Client: George W Klatt | Permit type: Bldg 1f2f add alt | Permit status: Finaled | Completion date: November 2, 2009 | Permit id: Bs09-0722 | |||||
SCORE 99 Electrical Date: May 4, 2009 Contractor: Lone Pine Electric Client: Christenson Irene | Permit status: Finaled | Completion date: June 1, 2009 | Permit id: Bs09-0811 | |||||
SCORE 100 Bathroom remodel Date: May 4, 2009 Contractor: Harold R Colbert Company Client: Irene Christenson | Permit type: Plumbing | Permit status: Finaled | Completion date: April 5, 2010 | Permit id: Bs09-0809 | |||||
SCORE 100 Hvac Client: Dearborn Lynne | Permit status: Finaled | Completion date: November 12, 2009 | Permit id: Bs09-2419 | |||||
SCORE 100 Sewage ejector Date: July 20, 2010 Contractor: Mattex Service Co. Inc Client: Michael E Connell | Permit type: Plumbing | Permit status: Finaled | Completion date: July 23, 2010 | Permit id: Bs10-1437 | |||||
SCORE 100 Basement Client: Michael E Connell | Permit type: Electrical | Permit status: Finaled | Completion date: November 22, 2010 | Permit id: Bs10-1770 | |||||
SCORE 99 Change of contractor Date: August 31, 2010 Contractor: Dale Elder Client: Michael Connell | Permit type: Plumbing | Permit status: Finaled | Completion date: November 22, 2010 | Permit id: Bs10-1783 | |||||
SCORE 98 Sfd Client: Michael Connell | Permit type: Bldg 1f2f add alt | Permit status: Finaled | Completion date: November 23, 2010 | Permit id: Bs10-1791 | |||||
SCORE 95 Hvac Date: September 20, 2010 Contractor: Ayers Repairs Co Client: Michael Connell | Permit status: Finaled | Completion date: September 21, 2010 | Permit id: Bs10-1922 | |||||
SCORE 100 Sewage ejector Date: July 20, 2010 Contractor: Mattex Service Co., Inc Client: Michael E Connell | Permit type: Plumbing | Permit status: Finaled | Completion date: July 23, 2010 | Permit id: Bs10-1437 | |||||
SCORE 95 Furnace & a/c replacement Client: Rosemary A Coffey | Permit type: Hvac | Permit status: Finaled | Completion date: September 24, 2010 | Permit id: Bs10-1683 | |||||
SCORE 100 Water heaters (14) Date: October 5, 2010 Contractor: Clark Plbg. And Htg Client: Housing Auth Of Champ Co | Permit type: Plumbing | Permit status: Finaled | Completion date: October 15, 2010 | Permit id: Bs10-2043 | |||||
SCORE 82 Furnace replacement Permit type: Hvac | Permit status: Finaled | Completion date: January 18, 2011 | Permit id: Bs11-0070 | |||||
SCORE 100 Hood supression (sushi avenue) Client: Bankier Family | Permit type: Hvac | Permit status: Finaled | Completion date: February 24, 2011 | Permit id: Bs11-0307 | |||||
SCORE 100 Furnace & a/c replacement Client: Paul Chang | Permit type: Hvac | Permit status: Issued | Permit id: Bs11-0306 | |||||
SCORE 96 Meter socket & panel Client: Barbara Kenny Homes Const | Permit type: Electrical | Permit status: Finaled | Completion date: June 9, 2011 | Permit id: Bs11-1102 | |||||
SCORE 100 A/c replacement Client: Barbara Kenny Homes Const | Permit type: Hvac | Permit status: Expired | Permit id: Bs11-1366 | |||||
SCORE 96 Add circuit for a/c Client: Wallace Motley | Permit type: Electrical | Permit status: Finaled | Completion date: August 3, 2011 | Permit id: Bs11-1452 | |||||
SCORE 100 Demo/duplex Client: City Of Champaign | Permit type: Demo 1f2f | Permit status: Finaled | Completion date: October 5, 2012 | Permit id: Bs12-0516 | |||||
SCORE 67 Multi-family (exterior stairs) Client: Jeffery B Wampler | Permit type: Bldg c alt rep | Permit status: Issued | Permit id: Bs12-0461 | |||||
Multi-family (exterior stairs) Date: June 27, 2012 Value: $7,270 Client: Jeffery B Wampler | Permit type: Sprinkler | Permit status: Issued | Permit id: Bs12-1297 | |||||
SCORE 85 Multi-family stair tower Client: Wampler Jeffery B | Permit type: Bldg c new add | Permit status: Expired | Permit id: Bs11-0034 | |||||
SCORE 100 Multi-family (exterior stairs) Client: Jeffery B Wampler | Permit type: Sprinkler | Permit status: Issued | Permit id: Bs12-1297 | |||||
SCORE 96 Water heater only Date: November 7, 2012 Contractor: Lanz Plbg Permit type: Plumbing | Permit status: Finaled | Completion date: November 8, 2012 | Permit id: Bs12-2292 | |||||
SCORE 100 Furnace replacement Permit type: Hvac | Permit status: Finaled | Completion date: November 8, 2012 | Permit id: Bs12-2291 | |||||
Driveway Date: October 16, 2003 Client: Todd Hick | Permit type: Grading | Permit status: Issued | Permit id: En03-1356 | |||||
SCORE 87 Parking lot resurface Date: October 4, 2005 Contractor: A And A Asphalt Permit type: Grading | Permit status: Issued | Permit id: En05-2349 | |||||
SCORE 100 Maint. Mains (2420) Date: September 15, 2006 Contractor: Shaw Brothers Construction Client: Blomberg, John F | Permit type: Row excavation | Permit status: Issued | Permit id: En06-2514 | |||||
SCORE 100 Maint. Mains Date: November 26, 2007 Contractor: Shaw Brothers Construction Permit type: Row excavation | Permit status: Issued | Permit id: En07-1707 | |||||
Row 621-623 e. Green street closure Date: October 8, 2008 Client: Bankier Apartments | Permit type: Row occupancy | Permit status: Issued | Permit id: En08-1055 | |||||
SCORE 100 Sfd detached garage Client: Hunt, Laura L | Permit type: Bldg 1f2f gar | Permit status: Finaled | Completion date: October 26, 2009 | Permit id: Bs09-1348 | |||||
Sfd detached garage Date: July 16, 2009 Client: Hunt, Laura L | Permit type: Grading | Permit status: Issued | Permit id: En09-0580 | |||||
SCORE 56 Service to garage Client: Laura L Hunt | Permit type: Electrical | Permit status: Finaled | Completion date: September 17, 2010 | Permit id: Bs09-2697 | |||||
SCORE 100 Pavement degradation fee Date: August 13, 2010 Contractor: Shaw Brothers Construction Client: Parker Robert S | Permit type: Row excavation | Permit status: Issued | Permit id: En10-0818 | |||||
SCORE 100 Replace service Date: September 28, 2011 Contractor: Remco Electrical Corp Client: Robert S Parker | Permit type: Electrical | Permit status: Finaled | Completion date: September 28, 2011 | Permit id: Bs11-1869 | |||||
SCORE 100 Maint. Mains Date: November 17, 2010 Contractor: Shaw Brothers Construction Client: Inman Larry A | Permit type: Row excavation | Permit status: Issued | Permit id: En10-1135 | |||||
SCORE 100 Repair sanitary sewer service (shared with 907) Date: January 17, 2012 Contractor: Stephens Excav. And Concrete Client: Goldthorpe Corey | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: January 9, 2012 | Permit id: En12-0053 | |||||
SCORE 100 Temp occupy (exc) row for sanitary repair Date: January 17, 2012 Contractor: Stephens Excav. And Concrete Client: Goldthorpe Corey | Permit type: Row occupancy | Permit status: Issued | Permit id: En12-0054 | |||||
SCORE 77 Replace driveway approach Date: March 12, 2012 Contractor: Atlantic Services Client: Bridgeford Catherine E | Permit type: Driveway | Permit status: Finaled | Completion date: March 16, 2012 | Permit id: En12-0215 | |||||
SCORE 100 Maint. Services Date: June 11, 2012 Contractor: Shaw Brothers Construction Client: Vance Jason Richard | Permit type: Row excavation | Permit status: Issued | Permit id: En12-0592 | |||||
SCORE 95 Furnace replacement Permit type: Hvac | Permit status: Finaled | Completion date: November 3, 2011 | Permit id: Bs11-2113 | |||||
SCORE 98 Sign Date: December 15, 2009 Contractor: Nw Sign Industries Client: Jsm, Management Inc | Permit status: Issued | Permit id: Pl09-0189 | |||||
SCORE 99 Water heater Date: July 22, 2009 Contractor: Aspire Plumbing Permit type: Plumbing | Permit status: Finaled | Completion date: July 24, 2009 | Permit id: Bs09-1484 | |||||
Construct new driveway approach Date: March 29, 2010 Permit type: Driveway | Permit status: Finaled | Completion date: March 26, 2010 | Permit id: En10-0280 | |||||
SCORE 96 Construct new driveway approach Date: March 29, 2010 Contractor: A1 Pavement And Maintenance Client: Lee Donald C & Karen L | Permit type: Driveway | Permit status: Finaled | Completion date: March 26, 2010 | Permit id: En10-0280 | |||||
SCORE 100 Furnace & a/c replacement Client: Lee Donald C & Karen L | Permit type: Hvac | Permit status: Finaled | Completion date: July 24, 2009 | Permit id: Bs09-1227 | |||||
SCORE 100 Service upgrade Client: Bruce H Swartz | Permit type: Electrical | Permit status: Expired | Permit id: Bs10-2064 | |||||
SCORE 98 Repair sanitary sewer connection Date: July 23, 2010 Contractor: Freeman Construction Client: Swartz Bruce H | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: July 28, 2010 | Permit id: En10-0723 | |||||
SCORE 99 Sewer line Date: July 26, 2010 Contractor: Dale Elder Client: Bruce Swartz | Permit type: Plumbing | Permit status: Finaled | Completion date: July 28, 2010 | Permit id: Bs10-1482 | |||||
SCORE 100 Furnace & a/c replacement Client: Brandon Patrick Ormond | Permit type: Hvac | Permit status: Expired | Permit id: Bs10-2397 | |||||
SCORE 93 Electrical Client: Vicki L Thomas | Permit status: Finaled | Completion date: December 3, 2010 | Permit id: Bs10-2455 | |||||
SCORE 93 Electrical Client: Vicki L Thomas | Permit status: Finaled | Completion date: December 3, 2010 | Permit id: Bs10-2455 | |||||
SCORE 82 Rejected by planning (sfd det. Garage) Client: Luther K Conover | Permit type: Bldg 1f2f gar | Permit status: Denied | Permit id: Bs10-2121 | |||||
SCORE 82 Rejected by planning (sfd det. Garage) Client: Luther K Conover | Permit type: Bldg 1f2f gar | Permit status: Denied | Permit id: Bs10-2121 | |||||
SCORE 59 Sfd/det. Gar. Client: Luke K Conover | Permit type: Bldg 1f2f gar | Permit status: Finaled | Completion date: August 30, 2011 | Permit id: Bs11-1005 | |||||
SCORE 100 Sfd/det. Gar. Client: Luke K Conover | Permit type: Electrical | Permit status: Finaled | Completion date: August 25, 2011 | Permit id: Bs11-1477 | |||||
SCORE 59 Sfd/det. Gar. Date: June 3, 2011 Contractor: Luke K Conover Client: Luke K Conover | Permit type: Grading | Permit status: Issued | Permit id: En11-0478 | |||||
SCORE 100 Replace service Client: Shelly Roderick | Permit type: Electrical | Permit status: Finaled | Completion date: August 1, 2011 | Permit id: Bs11-1451 | |||||
SCORE 96 Replace service Client: Shelly Roderick | Permit type: Electrical | Permit status: Finaled | Completion date: August 1, 2011 | Permit id: Bs11-1451 | |||||
SCORE 100 Furnace replacement Client: Thomas A Rainge | Permit type: Hvac | Permit status: Finaled | Completion date: October 11, 2011 | Permit id: Bs11-1951 | |||||
SCORE 63 Service upgrade Date: October 31, 2011 Contractor: Scott Foster Client: Sandy Jean Stipp | Permit type: Electrical | Permit status: Finaled | Completion date: November 9, 2011 | Permit id: Bs11-2128 | |||||
SCORE 100 Change of contractor Date: November 29, 2011 Contractor: Morse Mechanical Client: Joe Allan | Permit type: Plumbing | Permit status: Finaled | Completion date: February 17, 2012 | Permit id: Bs11-2353 | |||||
SCORE 64 Change of contractor Client: Joe Allan | Permit type: Bldg 1f2f add alt | Permit status: Finaled | Completion date: February 22, 2012 | Permit id: Bs11-2325 | |||||
SCORE 64 Change of contractor Date: November 29, 2011 Contractor: Joe Allan Client: Joe Allan | Permit type: Hvac | Permit status: Finaled | Completion date: February 21, 2012 | Permit id: Bs11-2352 | |||||
SCORE 100 Maint. Services Date: October 12, 2011 Contractor: Shaw Brothers Construction Client: Brown Douglas E | Permit type: Row excavation | Permit status: Issued | Permit id: En11-0917 | |||||
SCORE 89 Hvac Client: Pettyjohn Builders Llc | Permit status: Issued | Permit id: Bs12-0434 | |||||
SCORE 59 Sfd Date: December 9, 2011 Contractor: Pettyjohn Builders Llc Client: Pettyjohn Builders Llc | Permit type: Grading | Permit status: Issued | Permit id: En11-1114 | |||||
SCORE 59 Sfd Client: Pettyjohn Builders Llc | Permit type: Bldg 1f | Permit status: Issued | Permit id: Bs11-2430 | |||||
SCORE 100 Install new sanitary sewer service Date: February 6, 2012 Contractor: Harmon Excavating Client: Pettyjohn Builders Llc | Permit type: Sanitary sewer | Permit status: Finaled | Completion date: February 9, 2012 | Permit id: En12-0104 | |||||
SCORE 100 1 service Date: June 11, 2012 Contractor: Shaw Brothers Construction Client: Pettyjohn Builders Llc | Permit type: Row excavation | Permit status: Issued | Permit id: En12-0598 | |||||
SCORE 100 Plumbing Date: February 14, 2012 Contractor: Rich Plumbing Client: Pettyjohn Builders Llc | Permit status: Issued | Permit id: Bs12-0255 | |||||
SCORE 91 Construct new driveway approach Date: March 29, 2012 Contractor: Barry Contracting Client: Pettyjohn Builders Llc | Permit type: Driveway | Permit status: Finaled | Completion date: March 14, 2012 | Permit id: En12-0300 | |||||
SCORE 89 Hvac Client: Pettyjohn Builders Llc | Permit status: Issued | Permit id: Bs12-0434 | |||||
SCORE 96 New/temp Client: Pettyjohn Builders Llc | Permit type: Electrical | Permit status: Issued | Permit id: Bs12-0317 | |||||
SCORE 100 Demo/duplex Client: City Of Champaign | Permit type: Demo 1f2f | Permit status: Finaled | Completion date: July 9, 2012 | Permit id: Bs12-0507 |