Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Install one full duct work system. Install one 0 btu gas fired furnace with 2. 5-ton a/c conderser as per code. Gas by others Date: December 1, 2015 Value: $4,000 Permit id: Com2015-28693 | |||||
Reconstruct water and waste for 2 shower stalls 1 tub 2 toiets 2 vanities 1 laundry bod 1 hose bib 1 kitchen sink dishwasher 1 disposer 1 ice maker box gas for 1 furnace 105k 1 stove 75k and one 75k hot water heater. Work done to code hvac by o Date: November 12, 2015 Value: $4,600 Permit id: Com2015-27085 | |||||
Install (3) windows and (3) door same size and location - new siding and metal work 1 sq. Ft drywall (living room) as per code Date: November 5, 2015 Value: $5,000 Permit id: Com2015-26419 | |||||
Replace gas boiler with backflow as per code. Date: November 25, 2009 Permit id: Com2009-27273 | |||||
Reconstruct water and waste for 2 shower stalls 1 tub 2 toiets 2 vanities 1 laundry bod 1 hose bib 1 kitchen sink dishwasher 1 disposer 1 ice maker box gas for 1 furnace 105k 1 stove 75k and one 75k hot water heater. Work done to code hvac by others. Date: November 12, 2015 Value: $4,600 Expiration date: May 12, 2016 | Permit id: Com2015-27085 | |||||
Rewire the basment area adding circuits new switches & outlets install new lights and gfci. As per code Date: December 7, 2015 Value: $1,500 Expiration date: June 7, 2016 | Permit id: Com2015-29248 | |||||
Install piping for 3 bathroom kitchen laundry box. Gas to stove 35k and furnace 80k. As per code. Date: May 17, 2016 Value: $5,300 Expiration date: November 17, 2016 | Permit id: Com2016-12786 | |||||
Install one full duct work system. Install one 0 btu gas fired furnace with 2. 5-ton a c conderser as per code. Gas by others Date: December 1, 2015 Value: $4,000 Expiration date: June 1, 2016 | Permit id: Com2015-28693 |