Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit Date: September 29, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 725838 | |||||
Zoning permit Date: September 26, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 722597 | |||||
Electrical permit Date: April 29, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 680948 | |||||
Plumbing permit Date: May 20, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 684156 | |||||
Administrative permit Date: August 5, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 712951 | |||||
Operations permit Date: April 15, 2008 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 5278 | |||||
Mechanical permit Date: April 6, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 670479 | |||||
Addition permit Date: March 16, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 669360 | |||||
Suppression permit Date: July 8, 2016 Client: Belmont Behavioral Hospit | Permit status: Active | Permit id: 690097 | |||||
Fast form building permit Date: October 13, 2008 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 182385 | |||||
Operations permit Date: May 11, 2007 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 1174 | |||||
Permit for the removal of a patio area and for the erection of two-story rear addition to an existing detached structure. Size and location as shown in plans. For use as an extension to an existing hospital (previously approved as a childrens psychiatric facility). No signs on this application. Date: December 30, 2015 Client: Belmont Behavioral Hospit | Applicant: Darwin Beauvais | Permit type: Appeal | Permit status: Granted | Completion date: February 3, 2016 | Permit id: 26727 | |||||
New construction permit Date: December 14, 2016 Client: Belmont Behavioral Hospit | Permit status: Active | Permit id: 716575 | |||||
Zoning use permit Date: March 4, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 648697 | |||||
Plumbing permit Date: May 20, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 684156 | |||||
Addition permit Date: March 16, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 669360 | |||||
Zoning permit Date: September 20, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 715746 | |||||
Mechanical permit Date: January 20, 2017 Client: Belmont Behavioral Hospit | Permit status: Active | Permit id: 752655 | |||||
Operations permit Date: April 15, 2008 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 5278 | |||||
Fast form building permit Date: October 13, 2008 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 182385 | |||||
Operations permit Date: May 11, 2007 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 1174 | |||||
Electrical permit Date: April 29, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 680948 | |||||
Demolition permit Date: October 3, 2016 Client: Belmont Behavioral Hospit | Permit status: Expired | Permit id: 724746 | |||||
Suppression permit Date: July 8, 2016 Client: Belmont Behavioral Hospit | Permit status: Active | Permit id: 690097 | |||||
New construction permit Date: January 20, 2017 Client: Belmont Behavioral Hospit | Permit status: Active | Permit id: 739101 | |||||
Administrative permit Date: August 10, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 702233 | |||||
Mechanical permit Date: April 6, 2016 Client: Belmont Behavioral Hospit | Permit status: Completed | Permit id: 670479 | |||||
Permit for the removal of a patio area and for the erection of two-story rear addition to an existing detached structure. Size and location as shown in plans. For use as an extension to an existing hospital (previously approved as a childrens psychiatric facility). No signs on this application. Date: December 30, 2015 Client: Belmont Behavioral Hospit | Applicant: Darwin Beauvais | Permit type: Appeal | Permit status: Granted | Completion date: February 3, 2016 | Permit id: 26727 | |||||
For the complete demolitionof one building. For the reconfiguration of parking. For the erection of a new (3) three story outpatient building. All previously approved uses to continue complex. Size and location of structures per atttached plan. Parking follows: on site 66 (8. 5x18)+12(13min. X18)=78. Off site:lot "b" 128 (8. 5x18) =1 (13x18")hp=129. Off site: former woodbine avenue 19 (8. 5x18) angle parking + 3 (13 min. X 18) angle parking=22. Total parking=229. Date: September 29, 2016 Client: Belmont Behavioral Hospit | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 29, 2016 | Permit id: 725838 | |||||
Application for footing and foundation as stated herein, size and location as shown on attached plan. Date: December 14, 2016 Client: Belmont Behavioral Hospit | Permit type: New construction permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 716575 | |||||
SCORE 87 Complete demolition of existing building by hand and mechanical equipment. All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with philadelphia administrative code. Any deviation will require an amended building permit. Date: October 3, 2016 Contractor: Tamco Construction Inc Client: Belmont Behavioral Hospit | Permit type: Demolition permit | Permit status: Completed | Completion date: April 17, 2017 | Permit id: 724746 | |||||
For the erection of a three (3) story above grade plane, w. Rooftop structure(s), medical office building for outpatient services of structural steel frame & reinforced concrete & masonry core construction including masonry & eifs veneer & low-slope built-up roof assembly; building to be fully sprinklered. Separate permit reqd for truss installation (deferred submittal) & any mech., elec., plumb. & firesupp work. See bldg prmt# 716575 for previously approved foundation construction. Date: January 20, 2017 Client: Belmont Behavioral Hospit | Permit type: New construction permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 739101 | |||||
SCORE 100 New construction: interior & exterior plumbing;(3) three story outpatient building;belmont behavioral hospital (childrens psychiatric facility) - the installation will compy with the philadelphia plumbing code 2004 Date: February 8, 2017 Contractor: Surety Mechanical Service Inc Client: Belmont Behavioral Hospit | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 739408 | |||||
SCORE 100 Furnish and install 214 cat 5e cables, test, verity and backbone 12 strand mm fo & 100pr cat 3 riser cable as per 2008 nec (west district) Date: December 1, 2017 Contractor: Michael Kowal Client: Belmont Behavioral Hospit | Permit type: Electrical permit | Permit status: Active | Completion date: December 1, 2017 | Permit id: 828255 | |||||
SCORE 100 5 16 07 - tent erected - belmont center for comprehensive treatment Date: May 11, 2007 Contractor: Pottstown Tent Rental Client: Belmont Behavioral Hospit | Permit type: Operations permit | Permit status: Completed | Permit id: 1174 | |||||
SCORE 100 Fast form building permit Date: October 13, 2008 Contractor: Oliver Sprinkler Co Inc Client: Belmont Behavioral Hospit | Permit status: Completed | Completion date: May 14, 2009 | Permit id: 182385 | |||||
SCORE 86 Seal (2)5" laterals & fai -pa1# 2017-2992434 - remove house trap and hermetically sealing the lateral by a cap or plug per section p-606. 1 of the philadelphia plumbing code 2004 - "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: November 8, 2017 Contractor: Rosati Mechanical Inc Client: Belmont Behavioral Hospit | Permit type: Plumbing permit | Permit status: Active | Completion date: November 8, 2017 | Permit id: 830573 | |||||
SCORE 92 For the erection of a three (3) story structure addition to an existing three (3) story structure. Structure to be used as a group i-2 building. See ap# 6693 for foundation permit. Separate permit required for mechanical, electrical, plumbing and fire suppression work. Separate permit required for all special inspection; special inspections not included in this permit Date: April 6, 2016 Contractor: Alpa Construction Inc Client: Belmont Behavioral Hospit | Permit type: Addition permit | Permit status: Completed | Completion date: September 8, 2016 | Permit id: 670155 | |||||
SCORE 100 4 28 08 - tents erected on site - outside cafeteria Date: April 15, 2008 Contractor: Pottstown Tent Rental Client: Belmont Behavioral Hospit | Permit type: Operations permit | Permit status: Completed | Permit id: 5278 | |||||
SCORE 87 For the installation of a mechanical systeme to include registers diffusers, supply exhaust ductwork, ptac units, Date: April 6, 2016 Contractor: Sulpizio Inc Client: Belmont Behavioral Hospit | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 670479 | |||||
This application is to convert the conditional permit issued for this project (804302) to a zoning permit. No changes have been made to the plans previously submitted. Previous application was for the construction of a six (6) story building on an existing approved lot for a hospital complex, size and location as shown in the attached plans. For the reconfiguration of parking on the existing lot for 134 on-site parking parking spacesd and 1 off-site parking spaces as previously approved. To include one (1) loading zone (15x60) and one loading zone (10x40)(two(2)loading zones total) with twenty-one(21) bicycle spaces. Proposed driveway entrances as approved by the philadelphia dept. Of streets as shown on the attached plan. For the demolition of existing buildings as shown on the attached plan to accomodate revised parking an dnew hospital building. Cdr completion letter attached. Date: November 22, 2017 Client: Belmont Behavioral Hospit | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 22, 2017 | Permit id: 832495 | |||||
SCORE 100 Private sanitary sewer and water, for the connection to 13 trailers used for construction site connected to existing private infrastructure (trailers)the installation will comply with the philadelphia plumbing code 2004 Date: October 30, 2017 Contractor: Bbj Mechanical Inc Client: Belmont Behavioral Hospit | Permit type: Plumbing permit | Permit status: Active | Completion date: October 31, 2017 | Permit id: 827792 | |||||
SCORE 100 Furnish and install new fire alarm apnel annuciator horn strobes and pull stations as per nfpa72 (west district) Date: March 3, 2017 Contractor: Michael Kowal Client: Belmont Behavioral Hospit | Permit type: Electrical permit | Permit status: Completed | Completion date: October 23, 2017 | Permit id: 756559 | |||||
SCORE 92 To amend bldng prmt# 739101, issued for new construction of outpatient facility, to remove reuqirement for field-applied sprayed fire-resistant matls on previously approved structural steel framing as permitted by the construction type of the approved building. Date: March 20, 2017 Contractor: Alpa Construction Inc Client: Belmont Behavioral Hospit | Permit type: Administrative permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 759918 | |||||
SCORE 100 For the erection of two (2) accessory illuminated flatwall signs (sign #a1 and #a2). Size and location as shown on application plans. Signs accessory to an existing hospital. Date: November 16, 2017 Contractor: Ez Signs Llc Client: Belmont Behavioral Hospit | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 16, 2017 | Permit id: 799502 | |||||
For the erection of a two-story rear addition to an existing detached structure. Size and location as shown in plans. For use as an extension of an existing hospital (previously apporved as a childrens psychiatric facility). No signs on this application. Date: March 4, 2016 Client: Belmont Behavioral Hospit | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 4, 2016 | Permit id: 648697 | |||||
SCORE 95 For the installation of a nfpa 13 fire suppression system in a group medical health practitioner with business occupancy serviced by a six inch fire service line with a back flow preventer assembly. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Fire suppression system to be installed in accordance with nfpa 13. Date: March 30, 2017 Contractor: S A Comunale Co Inc Client: Belmont Behavioral Hospit | Permit type: Suppression permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 740750 | |||||
SCORE 92 Temporary certificate of occupancy to occupy addition minus permanant fire sprinkler installation. Pwd is allowing a temporary connection from the fire hydrant to the line side of the meter pit. Sprinkler system will be fully operational. Date: August 5, 2016 Contractor: Alpa Construction Inc Client: Belmont Behavioral Hospit | Permit type: Administrative permit | Permit status: Completed | Completion date: August 19, 2016 | Permit id: 712951 | |||||
For the consolidationof 5 lots to create one lot. For the complete demolitionof one building. For the reconfiguration of parking. For the erection of a new (3) three story outpatient building. All previously approved uses to continue complex. Size and location of structures per atttached plan. Parking follows: on site 66 (8. 5x18)+12(13min. X18)=78. Off site:lot "b" 128 (8. 5x18) =1 (13x18")hp=129. Off site: former woodbine avenue 19 (8. 5x18) angle parking + 3 (13 min. X 18) angle parking=22. Total parking=229. Date: September 20, 2016 Client: Belmont Behavioral Hospit | Permit type: Zoning permit | Permit status: Completed | Completion date: September 20, 2016 | Permit id: 715746 | |||||
SCORE 100 F&i new fire alarm devices, 24 smoke dtectors, 6 pull stations, 5 ts wf, av devices, 3 visual and 1 nac panel as per nec 2008 Date: April 29, 2016 Contractor: Michael Kowal Client: Belmont Behavioral Hospit | Permit type: Electrical permit | Permit status: Completed | Completion date: August 22, 2016 | Permit id: 680948 | |||||
SCORE 100 7 new, panels, 1 xfer sw, switches lights, receptacles, 4 hp and 1 roof unit as per nec 2008 west district Date: May 5, 2016 Contractor: Michael Kowal Client: Belmont Behavioral Hospit | Permit type: Electrical permit | Permit status: Completed | Completion date: August 24, 2017 | Permit id: 680950 | |||||
SCORE 100 Alteration: interior; plumbing for two-story rear addition to an existing detached structure(health care) - the installation will compy with the philadelphia plumbing code 2004 - note: also see administrative permit #702233 to amend Date: May 20, 2016 Contractor: Bbj Mechanical Inc Client: Belmont Behavioral Hospit | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 684156 | |||||
Constuction of 6 story building on existing lot for hospital complex. Reconfiguration of parking on existing lot for 134 on site parking spaces and 1 offsite parking spaces as approved. Add two loading zones, also for 21 bicyles. Proposed driveway entrances as approved. Demolish existing buildings as shown on plan to make room for revised parking and new hospital. Date: August 8, 2017 Client: Belmont Behavioral Hospit | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 8, 2017 | Permit id: 804302 | |||||
Hvac system for previously approved outpatient medical office building. See building permit# 739101 for all approved construction documents. Date: January 20, 2017 Client: Belmont Behavioral Hospit | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 752655 | |||||
SCORE 100 Furnish and install new 800amp service, feeders, panels, lights, switches and recepts as per 2008 nec (west district) Date: March 3, 2017 Contractor: Michael Kowal Client: Belmont Behavioral Hospit | Permit type: Electrical permit | Permit status: Completed | Completion date: October 17, 2017 | Permit id: 754144 | |||||
SCORE 100 Administrative permit to amend existing plumbing permit #684156 to reduce the approved 2-1 2" water distribution piping, water meter spread and reduced pressure zone backflow prevention containment assembly to 2" pipe size - the backflow preventer will be installed in a "hot box" - note: the 8" fire suppression piping, meter spread and backflow prevention containment device will be installed by a license fire suppression contractor (a separate permit is required) Date: August 10, 2016 Contractor: Bbj Mechanical Inc Client: Belmont Behavioral Hospit | Permit type: Administrative permit | Permit status: Completed | Completion date: October 25, 2016 | Permit id: 702233 | |||||
SCORE 100 New 2" water service, new 6" sanitary fun to existing manhole all sanitary piping on private property "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: August 26, 2016 Contractor: Bbj Mechanical Inc Client: Belmont Behavioral Hospit | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 697771 | |||||
SCORE 100 For the installation of an automatic fire suppression system in accordance with nfpa 13 on ground through second floors to include an 8-inch fire service line and backflow prevention assembly as per approved plans. Date: July 8, 2016 Contractor: Oliver Sprinkler Co Inc Client: Belmont Behavioral Hospit | Permit type: Suppression permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 690097 | |||||
SCORE 100 F&i 400amp 240 120v 3w service panel for office trailers Date: August 25, 2017 Contractor: Michael Kowal Client: Belmont Behavioral Hospit | Permit type: Electrical permit | Permit status: Active | Completion date: October 23, 2017 | Permit id: 811422 | |||||
SCORE 87 For the complete demolition of existing buildings "b" and "d" as per approved demolition plan. Existing structures to be demolished with mechanical equipment. Pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. A covered walkway or sidewalk closure shall be required within 12 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. 21 day posting and notice required per a-303. 2 Date: November 20, 2017 Contractor: Tamco Construction Inc Client: Belmont Behavioral Hospit | Permit type: Demolition permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 820798 | |||||
SCORE 92 For the erection of a foundation system to include footings, slab on grade foundation, and shallow spread footings as per approved plans, department of health approval, and geotechnical report ensure all exterior footings foundation system meet the inch frost depth separate permit required for all special inspection; special inspections not included in this permit Date: March 16, 2016 Contractor: Alpa Construction Inc Client: Belmont Behavioral Hospit | Permit type: Addition permit | Permit status: Completed | Completion date: June 13, 2016 | Permit id: 669360 | |||||
SCORE 95 Relocate (144) existing sprinkler heads. (hospital) Date: December 4, 2017 Contractor: S A Comunale Co Inc Client: Belmont Behavioral Hospit | Permit type: Suppression permit | Permit status: Active | Completion date: December 11, 2017 | Permit id: 836470 |