Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Date: July 15, 2003 Contractor: Bryan Ennist Client: Nicholas Haros | Client Address: P.O . Box 337 Flushing Ny 11358 | Client Phone: (718) 353-3090 | Client Company: Castel Realty, Llc | Permit status: Renewal | Permit id: 401624845 | |||||
SCORE 88 Equipment work Date: July 15, 2003 Contractor: Wasoff Plbg And Utility Co. Inc Permit status: Permit issued | Permit id: 40162484501 | |||||
SCORE 99 Equipment work Date: July 31, 2009 Contractor: Bryan A. Ennist Permit status: Permit issued | Permit id: 40162484502 | |||||
SCORE 96 Date: July 15, 2003 Contractor: Marvin Wasoff Client: Nicholas Haros | Client Address: P.O . Box 337 Flushing Ny 11358 | Client Phone: (718) 353-3090 | Client Company: Castel Realty, Llc | Permit status: Initial | Permit id: 401624845 | |||||
P a right front: remove locks on front gate right side. Date: August 14, 2000 Value: $102 Permit type: Iron | Permit id: E102615 | |||||
Apartment # 1g bedroom: cover window with plastic . Remove lower and upper sash . Return to shop . Install sash . Remove plastic . Reinstall sash. Date: June 6, 2002 Permit type: Gc | Permit id: E221679 | |||||
(public area) install stops and 1-way screws at public hall stairs windows between 1 2 story thru 4-1 story. Remove all work related debris. Date: July 13, 2005 Value: $93 Permit type: Gc | Permit id: E601985 | |||||
Apt #4e) at bathroom : re-install (1) window guard, and at bedroom#2 re-install (1) window guard with stops. Remove all work related debris. Date: October 2, 2007 Value: $113 Permit type: Gc | Permit id: E808322 | |||||
SCORE 100 Plumbing Date: September 20, 2017 Contractor: Henry Myers P And H, Inc Permit status: Permit issued | Permit id: 44042789701 | |||||
SCORE 93 Equipment work Date: October 27, 2017 Contractor: Jw Development Holdings L Permit status: Permit issued | Permit id: 44043939401 | |||||
SCORE 100 Date: September 20, 2017 Contractor: Timothy Myers Client: Alyssa Malin | Client Address: 1065 Avenue Of Americas New York Ny 10018 | Client Phone: (212) 721-5500 | Client Company: Brg Queens, Llc | Permit status: Initial | Permit id: 440427897 | |||||
SCORE 98 Date: September 13, 2017 Contractor: Mark Ericksen Client: Alyssa Malin | Client Address: 1065 Avenue Of Americas New York Ny 10018 | Client Phone: (212) 721-5500 | Client Company: Brg Queens, Llc | Permit status: Initial | Permit id: 440427897 | |||||
Apt#. 1g: bathroom; clean all mildew with bleach. Demolish 2 sections of walls approximately 4 x 4 each and sheetrock completely. Scrape, plaster Date: June 26, 2002 Permit type: Gc | Permit id: E222606 | |||||
(apt. #2g) at bedroom scrape plaster and paint (2) coats entire ceiling, approx. X 16, up to border on walls, approx. 2 sq. Ft. Remove all wo Date: January 4, 2005 Permit type: Gc | Permit id: E516051 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: January 25, 2005 Permit type: Delead | Permit id: E518962 | |||||
Apartment #2g: scrape, plaster and paint ceiling 2 coats, approximately square feet. Note: contractor must contact cordell @ (718) 636-3021, y Permit type: Gc | Permit id: E528919 | |||||
Apartment #2g: repair leak from above in bathroom. Plaster and paint entire ceiling approximately 35 square feet. (for access to apt. #3g - contact Date: June 15, 2005 Permit type: Gc | Permit id: E534345 | |||||
Apartment #2g: scrape, plaster and paint ceiling 2 coats, approximately square feet. Note: contractor must contact cordell @ (718) 636-3021, y Permit type: Gc | Permit id: E528919 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 24, 2012 Permit type: Delead | Permit id: Ed02976 | |||||
Apartment#l2: plaster ceililng at rear room (15sq. Ft.) prime and paint. Note: contractor must contact hpd at 718-636-3045 or 718-636-3037 or 718-6 Date: December 18, 2002 Permit type: Gc | Permit id: E311427 | |||||
Apt #e2, fire escape window replace counter balancers at lower sash window in the livingroom, leave window in proper working order. Remove all work Date: August 2, 2004 Permit type: Gc | Permit id: E504538 | |||||
Apt #e2. Trace and repair leak above, demo ceiling and lamanate entire ceiling approx 7x5. Tape and compound, sand to smooth finish. Paint with (2) Date: August 2, 2004 Permit type: Gc | Permit id: E504253 | |||||
At bathroom apartment #a3: laminate ceiling (5ftx7ft) with water proof sheetrock tape and compound and paint entire bathroom approx (150sq. Ft.). At Date: September 19, 2005 Permit type: Gc | Permit id: E607996 | |||||
Apartment #1b: trace, locate and repair leak above bedroom at ceiling. Scrape, plaster and paint entire room; prime and paint entire room in color a Date: March 29, 2004 Permit type: Gc | Permit id: E419302 | |||||
As per rc #2004000467901 (enviro-probe, inc.), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: May 6, 2004 Permit type: Delead | Permit id: E423309 | |||||
As per rc #20080000875 (i. A. T. L.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 me Date: December 13, 2007 Permit type: Delead | Permit id: E814725 | |||||
(apartment # a2 bathroom) laminate ceiling with water proof sheetrock. Tape and compound paint 2 coats approx. Sq. Ft. Note:contractor must c Date: October 20, 2005 Permit type: Gc | Permit id: E611407 |