Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Tenant improvement made by intermountain health care on the 23rd floor of the key bank tower Date: July 17, 2015 Contractor: Jrca Architects Permit type: Permit | Permit status: In progress | Completion date: September 2, 2015 | Current use: Commercial | Permit id: Bld2015-05459 | |||||
SCORE 99 Demo, ductwork, 1 movin cool unit, 8 vavs, test and balance. Date: January 29, 2015 Contractor: Secure Mechanical Inc Permit type: Mechanical | Permit status: Completed | Completion date: January 29, 2015 | Current use: Commercial | Permit id: Bld2015-00620 | |||||
SCORE 99 Electrical remodel addition of new freight elevator. Date: February 26, 2013 Contractor: Cr Lighting And Electric Permit type: Electrical | Permit status: Accepted | Completion date: February 26, 2013 | Current use: Commercial | Permit id: Bld2013-01083 | |||||
SCORE 96 Fire alarm point to point. Devices being added to existing system. Date: February 11, 2013 Contractor: Professional Systems Technology Permit type: Low voltage | Permit status: Completed | Completion date: March 6, 2013 | Current use: Commercial | Permit id: Bld2013-00737 | |||||
SCORE 100 Fire sprinklers for freight elevators Date: January 29, 2013 Contractor: Quality Fire Protection Inc Permit type: Fire | Permit status: Completed | Completion date: February 4, 2013 | Current use: Commercial | Permit id: Bld2013-00500 | |||||
SCORE 64 Fire sprinkler system Date: October 29, 2015 Permit type: Fire | Permit status: Pass | Completion date: November 25, 2015 | Current use: Commercial | Permit id: Bld2015-09260 | |||||
SCORE 64 Tenant improvement made by intermountain health care on the 23rd floor of the key bank tower Date: July 17, 2015 Permit type: Permit | Permit status: Completed | Completion date: October 6, 2015 | Current use: Commercial | Permit id: Bld2015-05459 | |||||
Fire alarm system Date: March 11, 2015 Permit type: Low voltage | Permit status: Pass | Completion date: June 12, 2015 | Current use: Commercial | Permit id: Bld2015-01577 | |||||
SCORE 64 Remodel/tenant finish Date: February 27, 2015 Permit type: Fire | Permit status: Closed | Completion date: April 28, 2015 | Current use: Commercial | Permit id: Bld2015-01323 | |||||
SCORE 64 Demo, ductwork, 1 movin cool unit, 8 vavs, test and balance. Date: January 29, 2015 Contractor: Secure Mechanical Inc.Kbt 17th Floor Permit type: Mechanical | Permit status: Inspections | Completion date: January 29, 2015 | Current use: Commercial | Permit id: Bld2015-00620 | |||||
SCORE 64 Remodel of existing office space. Date: January 7, 2015 Contractor: Canyon River Electricray Quinney Nebbeker Permit type: Electrical | Permit status: Closed | Completion date: April 28, 2015 | Current use: Commercial | Permit id: Bld2015-00116 | |||||
Removing and replacing some duel duct vavs with minimal duct. Date: December 29, 2014 Permit type: Mechanical | Permit status: Pass | Completion date: May 15, 2015 | Current use: Commercial | Permit id: Bld2014-09428 | |||||
SCORE 64 Electrical remodel- lighting, outlets, ect. Date: August 27, 2013 Contractor: J And J Electrickbt 24th Floor Remodel Permit type: Electrical | Permit status: Closed | Completion date: October 9, 2013 | Current use: Commercial | Permit id: Bld2013-06111 | |||||
SCORE 64 Electrical remodel/addition of new freight elevator. Date: February 26, 2013 Permit type: Electrical | Permit status: Inspections | Completion date: February 26, 2013 | Current use: Commercial | Permit id: Bld2013-01083 | |||||
SCORE 64 Fire alarm point to point. Devices being added to existing system. Date: February 11, 2013 Permit type: Low voltage | Permit status: Inspections | Completion date: March 6, 2013 | Current use: Commercial | Permit id: Bld2013-00737 | |||||
SCORE 64 Fire sprinklers for freight elevators Date: January 29, 2013 Permit type: Fire | Permit status: Inspections | Completion date: February 4, 2013 | Current use: Commercial | Permit id: Bld2013-00500 | |||||
SCORE 64 Remodel of the 26th floor of the key bank tower. Date: November 13, 2012 Permit type: Low voltage | Permit status: Closed | Completion date: December 20, 2012 | Current use: Commercial | Permit id: Bld2012-08409 | |||||
11/21/08 architect added addendum 6 to permit set. List of drawings that changed in addendum 6 is in the permit file. - ls 02/09/09 - salt lake city building dept. In conjunction with slc transportation dept. Has agreed to allow for valet parking on a temporary basis. Valet patrons will enter into level 1 of the parking structure from state street. Please see modified sheets a-099 t and a-098 t in project file for details. - ls 10/19/2007 Date: April 15, 2010 Permit type: Permit | Permit status: Pass | Completion date: April 29, 2010 | Current use: Commercial | Permit id: Bld2007-7101903 | |||||
Interior non structral demo floor 18-19-20. No electrical mechanical plumbing Date: April 27, 2016 Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-03982 | |||||
11/21/08 architect added addendum 6 to permit set. List of drawings that changed in addendum 6 is in the permit file. - ls 02/09/09 - salt lake city building dept. In conjunction with slc transportation dept. Has agreed to allow for valet parking on a temporary basis. Valet patrons will enter into level 1 of the parking structure from state street. Please see modified sheets a-099 t and a-098 t in project file for details. - ls 10/19/2007 Date: April 15, 2010 Permit status: Closed | Completion date: April 29, 2010 | Current use: Commercial | Permit id: Bld2007-7101903 | |||||
SCORE 61 Office renovation Date: May 26, 2015 Contractor: Ray Quinney And Nebeker Tidonavon Minnis Permit status: Closed | Current use: Commercial | Permit id: Bld2015-00070 | |||||
SCORE 61 . Ti Date: June 10, 2015 Contractor: Ihc Kbtbrett Beal Permit status: Closed | Current use: Commercial | Permit id: Bld2014-08975 | |||||
SCORE 99 Date: August 22, 2006 Contractor: Building Permit status: Closed | Completion date: January 10, 2012 | Current use: Commercial | Permit id: Bld2006-217445 | |||||
SCORE 67 Interior tenant improvement./ m. E. P reqd. Date: May 18, 2016 Contractor: Kirton And Mcconkie T.Idan Strear Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-04765 | |||||
SCORE 61 Tenant improvement made by intermountain health care on the 23rd floor of the key bank tower Date: October 6, 2015 Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-05459 | |||||
SCORE 66 Interior remodel of existing office space r. M. A. H. D. W. Date: September 20, 2012 Contractor: Big Tree Construction Llcmarcus And Millichap Permit status: Closed | Completion date: January 11, 2013 | Current use: Commercial | Permit id: Bld2012-06984 | |||||
SCORE 66 Freight elevator and surrounding space d. D. A. H. D. W. Date: October 24, 2012 Permit status: Closed | Completion date: May 10, 2013 | Current use: Commercial | Permit id: Bld2012-07901 | |||||
SCORE 66 Fire sprinkler Date: October 31, 2012 Contractor: Alta Fire Protection Companymarcus And Millichap Permit type: Fire | Permit status: Closed | Completion date: April 11, 2013 | Current use: Commercial | Permit id: Bld2012-08093 | |||||
SCORE 56 New break room sink Date: November 9, 2012 Contractor: Ackerman Plumbing Inc.Marcus And Millichap Permit type: Plumbing | Permit status: Closed | Completion date: December 20, 2012 | Current use: Commercial | Permit id: Bld2012-08350 | |||||
SCORE 56 Electrical work, job bid: 40,000. 00 Date: November 29, 2012 Permit type: Electrical | Permit status: Closed | Completion date: January 10, 2013 | Current use: Commercial | Permit id: Bld2012-08738 | |||||
SCORE 66 Renovations of 16,721 sf location on 8th floor of key bank tower Date: December 3, 2012 Permit status: Closed | Completion date: February 6, 2014 | Current use: Commercial | Permit id: Bld2012-08822 | |||||
SCORE 66 Hvac remodel Date: December 10, 2012 Contractor: Cofran Climate Systemsmarcus And Millichap Permit type: Mechanical | Permit status: Closed | Completion date: January 11, 2013 | Current use: Commercial | Permit id: Bld2012-09030 | |||||
SCORE 66 Fire alarm point to point drawings. Date: January 9, 2013 Permit type: Low voltage | Permit status: Closed | Completion date: March 7, 2013 | Current use: Commercial | Permit id: Bld2013-00149 | |||||
SCORE 66 Fires sprinklers renovations of 16,721 sf location on 8th floor of key bank tower Date: January 10, 2013 Permit type: Fire | Permit status: Closed | Completion date: February 13, 2013 | Current use: Commercial | Permit id: Bld2013-00186 | |||||
SCORE 66 8th floor of the keybank towers- electrical demo to include lighting, some outlets and walls. Existing main panels and service to remain. Please note: fire alarm to be authorized by seperate review and permitting process. Date: January 14, 2013 Contractor: J And J Electricihc Renovation 8th Floor Permit type: Electrical | Permit status: Closed | Completion date: March 6, 2013 | Current use: Commercial | Permit id: Bld2013-00234 | |||||
Grills and ductwork Date: January 31, 2013 Permit type: Mechanical | Permit status: Closed | Completion date: February 6, 2014 | Current use: Commercial | Permit id: Bld2013-00558 | |||||
SCORE 66 Tenant improvement for intermountain tenant space on the 24th floor of the key bank tower Date: June 27, 2013 Permit status: Closed | Completion date: October 11, 2013 | Current use: Commercial | Permit id: Bld2013-04407 | |||||
SCORE 66 Fire sprinklers Date: July 29, 2013 Permit type: Fire | Permit status: Closed | Completion date: September 10, 2013 | Current use: Commercial | Permit id: Bld2013-05253 | |||||
SCORE 66 Fire alarm device point to point drawings. Date: August 7, 2013 Permit type: Low voltage | Permit status: Closed | Completion date: October 10, 2013 | Current use: Commercial | Permit id: Bld2013-05572 | |||||
SCORE 66 Remodel hallway 24th floor kbt Date: August 26, 2013 Contractor: J And J Electrickbt 24th Floor Permit type: Electrical | Permit status: Closed | Completion date: October 9, 2013 | Current use: Commercial | Permit id: Bld2013-06081 | |||||
SCORE 66 Grilles, registers, duct work, air conditioning unit Date: August 27, 2013 Contractor: Secure Mechanicalkbt 24th Fl Permit type: Mechanical | Permit status: Closed | Completion date: October 10, 2013 | Current use: Commercial | Permit id: Bld2013-06110 | |||||
SCORE 66 . Ti Date: December 9, 2014 Contractor: Daw Construction Group Llcihc Kbt Permit status: Closed | Completion date: June 10, 2015 | Current use: Commercial | Permit id: Bld2014-08975 | |||||
SCORE 56 Removing and replacing some duel duct vavs with minimal duct. Date: December 29, 2014 Contractor: Mj Mechanical Llcray Quinney Nebbeker Permit type: Mechanical | Permit status: Closed | Completion date: May 15, 2015 | Current use: Commercial | Permit id: Bld2014-09428 | |||||
SCORE 66 Office renovation Date: January 6, 2015 Permit status: Closed | Completion date: May 26, 2015 | Current use: Commercial | Permit id: Bld2015-00070 | |||||
SCORE 66 Replacement of outdated electrical Date: February 2, 2015 Contractor: Jp Electricalkbt 17th Floor Remodel Permit type: Electrical | Permit status: Closed | Completion date: June 4, 2015 | Current use: Commercial | Permit id: Bld2015-00684 | |||||
SCORE 66 Fire sprinkler system Date: February 9, 2015 Contractor: Fire Engineering Company Incray Quinney Permit type: Fire | Permit status: Closed | Completion date: March 6, 2015 | Current use: Commercial | Permit id: Bld2015-00896 | |||||
Fire alarm system Date: March 11, 2015 Permit type: Low voltage | Permit status: Closed | Completion date: June 12, 2015 | Current use: Commercial | Permit id: Bld2015-01577 | |||||
SCORE 64 Tenant improvement made by intermountain health care on the 23rd floor of the key bank tower Date: July 17, 2015 Permit status: Inspections | Completion date: October 6, 2015 | Current use: Commercial | Permit id: Bld2015-05459 | |||||
SCORE 64 Fire sprinkler system Date: October 29, 2015 Permit type: Fire | Permit status: Closed | Completion date: November 25, 2015 | Current use: Commercial | Permit id: Bld2015-09260 | |||||
SCORE 66 Fire sprinkler system Date: February 9, 2015 Contractor: Fire Engineering Company Incray Quinney Permit type: Fire | Permit status: Pass | Completion date: March 6, 2015 | Current use: Commercial | Permit id: Bld2015-00896 | |||||
SCORE 66 Replacement of outdated electrical Date: February 2, 2015 Contractor: Jp Electricalkbt 17th Floor Remodel Permit type: Electrical | Permit status: Pass | Completion date: June 4, 2015 | Current use: Commercial | Permit id: Bld2015-00684 | |||||
SCORE 66 Office renovation Date: January 6, 2015 Permit type: Permit | Permit status: Pass | Completion date: May 26, 2015 | Current use: Commercial | Permit id: Bld2015-00070 | |||||
SCORE 66 . Ti Date: December 9, 2014 Contractor: Daw Construction Group Llcihc Kbt Permit type: Permit | Permit status: Pass | Completion date: June 10, 2015 | Current use: Commercial | Permit id: Bld2014-08975 | |||||
SCORE 66 Grilles, registers, duct work, air conditioning unit Date: August 27, 2013 Contractor: Secure Mechanicalkbt 24th Fl Permit type: Mechanical | Permit status: Pass | Completion date: October 10, 2013 | Current use: Commercial | Permit id: Bld2013-06110 | |||||
SCORE 66 Remodel hallway 24th floor kbt Date: August 26, 2013 Contractor: J And J Electrickbt 24th Floor Permit type: Electrical | Permit status: Pass | Completion date: October 9, 2013 | Current use: Commercial | Permit id: Bld2013-06081 | |||||
SCORE 66 Fire alarm device point to point drawings. Date: August 7, 2013 Permit type: Low voltage | Permit status: Pass | Completion date: October 10, 2013 | Current use: Commercial | Permit id: Bld2013-05572 | |||||
SCORE 66 Fire sprinklers Date: July 29, 2013 Permit type: Fire | Permit status: Pass | Completion date: September 10, 2013 | Current use: Commercial | Permit id: Bld2013-05253 | |||||
SCORE 66 Tenant improvement for intermountain tenant space on the 24th floor of the key bank tower Date: June 27, 2013 Permit type: Permit | Permit status: Pass | Completion date: October 11, 2013 | Current use: Commercial | Permit id: Bld2013-04407 | |||||
Grills and ductwork Date: January 31, 2013 Permit type: Mechanical | Permit status: Pass | Completion date: February 6, 2014 | Current use: Commercial | Permit id: Bld2013-00558 | |||||
SCORE 66 8th floor of the keybank towers- electrical demo to include lighting, some outlets and walls. Existing main panels and service to remain. Please note: fire alarm to be authorized by seperate review and permitting process. Date: January 14, 2013 Contractor: J And J Electricihc Renovation 8th Floor Permit type: Electrical | Permit status: Pass | Completion date: March 6, 2013 | Current use: Commercial | Permit id: Bld2013-00234 | |||||
SCORE 66 Fires sprinklers renovations of 16,721 sf location on 8th floor of key bank tower Date: January 10, 2013 Permit type: Fire | Permit status: Pass | Completion date: February 13, 2013 | Current use: Commercial | Permit id: Bld2013-00186 | |||||
SCORE 66 Fire alarm point to point drawings. Date: January 9, 2013 Permit type: Low voltage | Permit status: Pass | Completion date: March 7, 2013 | Current use: Commercial | Permit id: Bld2013-00149 | |||||
SCORE 66 Renovations of 16,721 sf location on 8th floor of key bank tower Date: December 3, 2012 Permit type: Permit | Permit status: Pass | Completion date: February 6, 2014 | Current use: Commercial | Permit id: Bld2012-08822 | |||||
SCORE 66 Hvac remodel Date: December 10, 2012 Contractor: Cofran Climate Systemsmarcus And Millichap Permit type: Mechanical | Permit status: Pass | Completion date: January 11, 2013 | Current use: Commercial | Permit id: Bld2012-09030 | |||||
Electrical work, job bid: 40,000. 00 Date: November 29, 2012 Permit type: Electrical | Permit status: Pass | Completion date: January 10, 2013 | Current use: Commercial | Permit id: Bld2012-08738 | |||||
New break room sink Date: November 9, 2012 Permit type: Plumbing | Permit status: Pass | Completion date: December 20, 2012 | Current use: Commercial | Permit id: Bld2012-08350 | |||||
SCORE 66 Fire sprinkler Date: October 31, 2012 Contractor: Alta Fire Protection Companymarcus And Millichap Permit type: Fire | Permit status: Pass | Completion date: April 11, 2013 | Current use: Commercial | Permit id: Bld2012-08093 | |||||
SCORE 66 Interior remodel of existing office space r. M. A. H. D. W. Date: September 20, 2012 Contractor: Big Tree Construction Llcmarcus And Millichap Permit type: Permit | Permit status: Pass | Completion date: January 11, 2013 | Current use: Commercial | Permit id: Bld2012-06984 | |||||
SCORE 66 Freight elevator and surrounding space d. D. A. H. D. W. Date: October 24, 2012 Permit type: Permit | Permit status: Pass | Completion date: May 10, 2013 | Current use: Commercial | Permit id: Bld2012-07901 | |||||
SCORE 99 Permit Date: August 22, 2006 Contractor: Building Permit status: Pass | Completion date: January 10, 2012 | Current use: Commercial | Permit id: Bld2006-217445 | |||||
SCORE 99 Date: August 22, 2006 Contractor: Building Permit status: Closed | Completion date: January 10, 2012 | Current use: Commercial | Permit id: Bld2006-217445 | |||||
SCORE 59 11 21 08 architect added addendum 6 to permit set. List of drawings that changed in addendum 6 is in the permit file. - ls 02 09 09 - salt lake city building dept. In conjunction with slc transportation dept. Has agreed to allow for valet parking on a temporary basis. Valet patrons will enter into level 1 of the parking structure from state street. Please see modified sheets a-099 t and a-098 t in project file for details. - ls 10 19 2007 Date: April 15, 2010 Permit status: Closed | Completion date: April 29, 2010 | Current use: Commercial | Permit id: Bld2007-7101903 | |||||
SCORE 66 Interior remodel of existing office space r. M. A. H. D. W. Date: September 20, 2012 Contractor: Big Tree Construction Llcmarcus And Millichap Permit status: Closed | Completion date: January 11, 2013 | Current use: Commercial | Permit id: Bld2012-06984 | |||||
SCORE 66 Freight elevator and surrounding space d. D. A. H. D. W. Date: October 24, 2012 Permit status: Closed | Completion date: May 10, 2013 | Current use: Commercial | Permit id: Bld2012-07901 | |||||
SCORE 66 Fire sprinkler Date: October 31, 2012 Contractor: Alta Fire Protection Companymarcus And Millichap Permit type: Fire | Permit status: Closed | Completion date: April 11, 2013 | Current use: Commercial | Permit id: Bld2012-08093 | |||||
SCORE 59 New break room sink Date: November 9, 2012 Contractor: Ackerman Plumbing, Inc.Marcus And Millichap Permit type: Plumbing | Permit status: Closed | Completion date: December 20, 2012 | Current use: Commercial | Permit id: Bld2012-08350 | |||||
SCORE 64 Remodel of the 26th floor of the key bank tower. Date: November 13, 2012 Permit type: Low voltage | Permit status: Closed | Completion date: December 20, 2012 | Current use: Commercial | Permit id: Bld2012-08409 | |||||
SCORE 59 Electrical work, job bid: 40,000. 00 Date: November 29, 2012 Permit type: Electrical | Permit status: Closed | Completion date: January 10, 2013 | Current use: Commercial | Permit id: Bld2012-08738 | |||||
SCORE 66 Renovations of 16,721 sf location on 8th floor of key bank tower Date: December 3, 2012 Permit status: Closed | Completion date: February 6, 2014 | Current use: Commercial | Permit id: Bld2012-08822 | |||||
SCORE 66 Hvac remodel Date: December 10, 2012 Contractor: Cofran Climate Systemsmarcus And Millichap Permit type: Mechanical | Permit status: Closed | Completion date: January 11, 2013 | Current use: Commercial | Permit id: Bld2012-09030 | |||||
SCORE 66 Fire alarm point to point drawings. Date: January 9, 2013 Permit type: Low voltage | Permit status: Closed | Completion date: March 7, 2013 | Current use: Commercial | Permit id: Bld2013-00149 | |||||
SCORE 66 Fires sprinklers renovations of 16,721 sf location on 8th floor of key bank tower Date: January 10, 2013 Permit type: Fire | Permit status: Closed | Completion date: February 13, 2013 | Current use: Commercial | Permit id: Bld2013-00186 | |||||
SCORE 66 8th floor of the keybank towers- electrical demo to include lighting, some outlets and walls. Existing main panels and service to remain. Please note: fire alarm to be authorized by seperate review and permitting process. Date: January 14, 2013 Contractor: J And J Electricihc Renovation 8th Floor Permit type: Electrical | Permit status: Closed | Completion date: March 6, 2013 | Current use: Commercial | Permit id: Bld2013-00234 | |||||
SCORE 64 Fire sprinklers for freight elevators Date: January 29, 2013 Permit type: Fire | Permit status: Inspections | Completion date: February 4, 2013 | Current use: Commercial | Permit id: Bld2013-00500 | |||||
SCORE 59 Grills and ductwork Date: January 31, 2013 Contractor: Secure Mechanicalihc Kbt 8th Floor Permit type: Mechanical | Permit status: Closed | Completion date: February 6, 2014 | Current use: Commercial | Permit id: Bld2013-00558 | |||||
SCORE 64 Fire alarm point to point. Devices being added to existing system. Date: February 11, 2013 Permit type: Low voltage | Permit status: Inspections | Completion date: March 6, 2013 | Current use: Commercial | Permit id: Bld2013-00737 | |||||
SCORE 64 Electrical remodel addition of new freight elevator. Date: February 26, 2013 Permit type: Electrical | Permit status: Inspections | Completion date: February 26, 2013 | Current use: Commercial | Permit id: Bld2013-01083 | |||||
SCORE 66 Tenant improvement for intermountain tenant space on the 24th floor of the key bank tower Date: June 27, 2013 Permit status: Closed | Completion date: October 11, 2013 | Current use: Commercial | Permit id: Bld2013-04407 | |||||
SCORE 66 Fire sprinklers Date: July 29, 2013 Permit type: Fire | Permit status: Closed | Completion date: September 10, 2013 | Current use: Commercial | Permit id: Bld2013-05253 | |||||
SCORE 66 Fire alarm device point to point drawings. Date: August 7, 2013 Permit type: Low voltage | Permit status: Closed | Completion date: October 10, 2013 | Current use: Commercial | Permit id: Bld2013-05572 | |||||
SCORE 66 Remodel hallway 24th floor kbt Date: August 26, 2013 Contractor: J And J Electrickbt 24th Floor Permit type: Electrical | Permit status: Closed | Completion date: October 9, 2013 | Current use: Commercial | Permit id: Bld2013-06081 | |||||
SCORE 66 Grilles, registers, duct work, air conditioning unit Date: August 27, 2013 Contractor: Secure Mechanicalkbt 24th Fl Permit type: Mechanical | Permit status: Closed | Completion date: October 10, 2013 | Current use: Commercial | Permit id: Bld2013-06110 | |||||
SCORE 64 Electrical remodel- lighting, outlets, ect. Date: August 27, 2013 Contractor: J And J Electrickbt 24th Floor Remodel Permit type: Electrical | Permit status: Closed | Completion date: October 9, 2013 | Current use: Commercial | Permit id: Bld2013-06111 | |||||
SCORE 66 . Ti Date: December 9, 2014 Contractor: Daw Construction Group Llcihc Kbt Permit status: Closed | Completion date: June 10, 2015 | Current use: Commercial | Permit id: Bld2014-08975 | |||||
SCORE 59 Removing and replacing some duel duct vavs with minimal duct. Date: December 29, 2014 Contractor: Mj Mechanical, Llcray Quinney Nebbeker Permit type: Mechanical | Permit status: Closed | Completion date: May 15, 2015 | Current use: Commercial | Permit id: Bld2014-09428 | |||||
SCORE 66 Office renovation Date: January 6, 2015 Permit status: Closed | Completion date: May 26, 2015 | Current use: Commercial | Permit id: Bld2015-00070 | |||||
SCORE 64 Remodel of existing office space. Date: January 7, 2015 Contractor: Canyon River Electricray Quinney Nebbeker Permit type: Electrical | Permit status: Closed | Completion date: April 28, 2015 | Current use: Commercial | Permit id: Bld2015-00116 | |||||
SCORE 64 Demo, ductwork, 1 movin cool unit, 8 vavs, test and balance. Date: January 29, 2015 Contractor: Secure Mechanical Inc.Kbt 17th Floor Permit type: Mechanical | Permit status: Inspections | Completion date: January 29, 2015 | Current use: Commercial | Permit id: Bld2015-00620 | |||||
SCORE 66 Replacement of outdated electrical Date: February 2, 2015 Contractor: Jp Electricalkbt 17th Floor Remodel Permit type: Electrical | Permit status: Closed | Completion date: June 4, 2015 | Current use: Commercial | Permit id: Bld2015-00684 | |||||
SCORE 66 Fire sprinkler system Date: February 9, 2015 Contractor: Fire Engineering Company Incray Quinney Permit type: Fire | Permit status: Closed | Completion date: March 6, 2015 | Current use: Commercial | Permit id: Bld2015-00896 | |||||
SCORE 64 Remodel tenant finish Date: February 27, 2015 Permit type: Fire | Permit status: Closed | Completion date: April 28, 2015 | Current use: Commercial | Permit id: Bld2015-01323 | |||||
SCORE 59 Fire alarm system Date: March 11, 2015 Permit type: Low voltage | Permit status: Closed | Completion date: June 12, 2015 | Current use: Commercial | Permit id: Bld2015-01577 | |||||
SCORE 64 Tenant improvement made by intermountain health care on the 23rd floor of the key bank tower Date: July 17, 2015 Permit status: Inspections | Completion date: October 6, 2015 | Current use: Commercial | Permit id: Bld2015-05459 | |||||
SCORE 64 Fire sprinkler system Date: October 29, 2015 Permit type: Fire | Permit status: Closed | Completion date: November 25, 2015 | Current use: Commercial | Permit id: Bld2015-09260 |