Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Equipment work Date: October 4, 2001 Contractor: A And C Combustion Permit status: Permit issued | Permit id: 40131064801 | |||||
Apt # 1c: replace defective washers on the shower body, replace stem if necessary. Date: July 10, 2003 Permit type: Plumb | Permit id: E400567 | |||||
At apt # 5b properly repair install window guards throughout apartment. Ensure that all of the window guards are ok and in acco Date: December 10, 2016 Value: $227 Permit type: Gc | Permit id: Eh07946 | |||||
Remove existing double lock cylinder and install dead lock w d -i- bolt single cylinder at lobby door to back yard. Note: contractor must contact hpd Date: February 25, 2004 Permit type: Intcom | Permit id: E416410 | |||||
Replace frame and door to bulkhead north section. Install panick bar. Remove all work related debris. Note: contractor must contact hpd @ (718) 63 Date: June 29, 2004 Permit type: Gc | Permit id: E426336 | |||||
Perform total lead analysis of 06 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 11, 2009 Permit type: Delead | Permit id: E941712 | |||||
Perform total lead analysis of 08 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 10, 2009 Permit type: Delead | Permit id: E941157 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 2, 2009 Permit type: Delead | Permit id: Ea00881 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 9, 2009 Permit type: Delead | Permit id: E941321 | |||||
Erp doh lead violation: rc# 2008000032101 and attached scope of work thoroughly remove all lead violations as per new york city health order to abate Date: May 20, 2009 Permit type: Delead | Permit id: E939161 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 10, 2009 Permit type: Delead | Permit id: E941608 | |||||
As per rc #2005001319003 (enviro-probe, inc.), perform total lead analysis of 16 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: August 4, 2005 Permit type: Delead | Permit id: E603943 | |||||
Erp ll 38 violation: as per rc #20030025806 (pdg) and attached scope of work thoroughly remove all lead violations as per new york city health sectio Date: June 1, 2004 Permit type: Delead | Permit id: E424692 | |||||
Apt. #11d) repair roof over kitchen and foyer to stops all leaks, approx. 4 sq. Ft. Plaster, patch hole in kitchen ceiling, approx. 1 sq. Ft. A Date: January 26, 2005 Permit type: Gc | Permit id: E518226 | |||||
As per rc #2004000467903 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: July 26, 2004 Permit type: Delead | Permit id: E504643 | |||||
As per rc #2004000467903 (enviro-probe, inc.), perform total lead analysis of 14 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: July 28, 2004 Permit type: Delead | Permit id: E504910 | |||||
As per rc #2004000467903 (enviro-probe, inc.), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: September 13, 2004 Permit type: Delead | Permit id: E507555 | |||||
R c 20141419802 apt 8d: as per the requirement contract with hpd, provide and install 2 window guards and repair 2 throughout apartment. Remove Date: October 24, 2014 Permit type: Gc | Permit id: Ef08139 | |||||
Perform total lead analysis of 08 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: December 2, 2014 Permit type: Delead | Permit id: Ef10927 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: October 20, 2014 Permit type: Delead | Permit id: Ef08664 | |||||
Apartment #12d: scrape down damaged ceiling approximtely 12 square feet and plaster. To a smooth finish and paint 2 coats in same color. Note: co Date: August 5, 2004 Permit type: Gc | Permit id: E505086 | |||||
Apartment # 12-d kitchen: trace,locate and repair all leaks above kitchen. Laminate entire kitchen ceiling to use 1 2 in sheetrock,tape and compound s Date: July 28, 2003 Permit type: Gc | Permit id: E400707 | |||||
Apartment # 12-d bedroom & bathroom: emove damaged windows in bathroom and bedroom 2 windows. Reinstall 2 windows brick to brick aluminum dhc rep Date: July 22, 2003 Permit type: Gc | Permit id: E400701 | |||||
Apt. 12b at kitchen, remove damaged window and install new thermal window complete. Re-install security gate if removed during window in Date: February 17, 2005 Permit type: Gc | Permit id: E521673 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845 Date: December 23, 2005 Permit type: Delead | Permit id: E618367 | |||||
Apt.#1c) seal bedroom ceiling approx 4 sq. Ft. Prime and paint the area. Note: contractor must contact hpd @(718) 636-3021, 636-3027, or 636-30 Date: October 1, 2004 Permit type: Gc | Permit id: E509122 |