Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 Prepare & re[paintmetal items inside the intake structure & utility conduit and on the access bridge. Remove & replace existing ladders, platforms, gratings, guides, bolts & section of raw water piping in intake tower conduit. Install metal access pipe & mis piping in utility conduit, place concrete builkheads at ends and fill void with concrete material. Install filter diaphragm around the existing conduit for water treatment plant ![]() ![]() Client: North Fork Left Fork Dam Intake Tower | Permit type: Com: electrical | Permit status: Issued | Current use: Commercial | Permit id: 15-07377 | |||||
Prepare & re[paintmetal items inside the intake structure & utility conduit and on the access bridge. Remove & replace existing ladders, platforms, gratings, guides, bolts & section of raw water piping in intake tower conduit. Install metal access pipe & mis piping in utility conduit, place concrete builkheads at ends and fill void with concrete material. Install filter diaphragm around the existing conduit for water treatment plant ![]() Client: North Fork Left Fork Dam Intake Tower | Permit type: Com: plumbing | Permit status: Closed | Current use: Commercial | Permit id: 15-07378 | |||||
Commerical film and photography work, 4 25 16 from 5am-10pm with (1) 18 amp tow plant and (5) 10x tents ![]() Permit type: Event-temporary use | Permit status: Expired | Current use: Event-temporary use | Permit id: 16-04982 | |||||
SCORE 66 Prepare & repaint metal items inside the intake structure & utility conduit and on the access bridge. Remove & replace existing ladders, platforms, gratings, guides, bolts & section of raw water piping in intake tower conduit. Install metal access pipe & mis piping in utility conduit, place concrete builkheads at ends and fill void with concrete material. Install filter diaphragm around the existing conduit for water treatment plant ![]() ![]() Client: North Fork Left Fork Dam Intake Tower | Permit type: Fire prevention | Permit status: Issued | Current use: Fire | Permit id: 15-07379 | |||||
SCORE 89 Service change at north fork water treatment plant ![]() ![]() Permit type: Com: electrical | Permit status: Finaled | Current use: Commercial | Permit id: 15-04758 | |||||
Service change at north fork water treatment plant ![]() Permit type: Commercial | Permit status: Issued | Permit id: 15-04758 | |||||
SCORE 66 Prepare & repaintmetal items inside the intake structure & utility conduit and on the access bridge. Remove & replace existing ladders, platforms, gratings, guides, bolts & section of raw water piping in intake tower conduit. Install metal access pipe & misc piping in utility conduit, place concrete builkheads at ends and fill void with concrete material. Install filter diaphragm around the existing conduit for water treatment plant ![]() ![]() Client: North Fork Left Fork Dam Intake Tower | Permit type: Com: remodel | Permit status: Plan check | Current use: Commercial | Permit id: 15-07376 |