Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Install a 40,0 btu gas furnace and 1. 5 ton a/c to main level install a 1. 5 ton heat pump to upper level Date: June 10, 2016 Contractor: Elko Electric Inc Client: Troy Tolle | Permit type: Res: multi-trade heating | Permit status: Finaled | Current use: Residential | Permit id: 16-05478 | Parcel: 47106 | |||||
SCORE 99 Install a 40,0 btu gas furnace and 1. 5 ton a/c to main level install a 1. 5 ton heat pump to upper level Date: June 10, 2016 Contractor: Bullman Heating And Air Client: Troy Tolle | Permit type: Res: multi-trade heating | Permit status: Finaled | Current use: Residential | Permit id: 16-05478 | Parcel: 47106 |