Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 Replace-two tubs in basement existing bathrooms. With shower valves. Add additional bathroom in master suite. Replace fixtures in 3 existing bathrooms, replace 40gal gas water heater. Above ground waste and water piping will be updated. Date: October 21, 2013 Contractor: All Purpose Plumbingalden Remodel Permit type: Plumbing | Permit status: Pass | Completion date: March 20, 2014 | Current use: Residential | Permit id: Bld2013-07747 | |||||
SCORE 64 Elec work for home remodel Date: October 21, 2013 Contractor: Copper Creek Electric. Llcalden St Permit type: Electrical | Permit status: Pass | Completion date: March 24, 2014 | Current use: Residential | Permit id: Bld2013-07723 | |||||
SCORE 64 Install baseboard heating system for basement. 30k btu, 7" round exterior combustion air, 3/4" gas line Date: September 27, 2013 Contractor: Verco Of Salt Lakealden St Remodel Permit type: Mechanical | Permit status: Pass | Completion date: March 20, 2014 | Current use: Residential | Permit id: Bld2013-07098 | |||||
SCORE 79 Int remodel of existing home, no structural change, elec/mech/plmbg permits reqd r. M. R-1/70 not historic a. S. Date: September 25, 2013 Contractor: Bulkley Construction Llckmak Group Permit type: Permit | Permit status: Pass | Completion date: March 20, 2014 | Current use: Residential | Permit id: Bld2013-07008 | |||||
Unit legalization Date: June 3, 2013 Permit status: Accepted | Completion date: June 3, 2013 | Permit id: Bld2013-03620 |