Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Electrical on the restrooms, hook up sensors, lights, and outlets Date: February 16, 2016 Contractor: Ac Electric Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-01282 | |||||
SCORE 67 1-exhaust fan 1-ductwork new restroom Date: March 2, 2016 Contractor: Jts Mechanical Llc Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-01880 | |||||
SCORE 61 1-drinking fountain 1-urinal 2-wash basin-lavs 3-water closets 1-water heater 4-roof/floor drains 1-hose bibbs 1-backflow preventer. New restroom Date: February 12, 2016 Contractor: Jeff C Redd Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-01167 | |||||
SCORE 76 Demolition of an existing restroom and construction of a new restroom. This is the third phase of restroom replacement at the sugar house park. This one is located at the parleys creek pavilion area. The plans are the same as the other two that have been constructed at the fabian and hidden grove areas. Date: February 5, 2016 Contractor: Ajc Architects Permit status: Inspections | Permit id: Bld2015-07759 | |||||
SCORE 61 1-drinking fountain 1-urinal 2-wash basin-lavs 3-water closets 1-water heater 4-roof floor drains 1-hose bibbs 1-backflow preventer. New restroom Date: February 12, 2016 Contractor: Jeff C Redd Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-01167 | |||||
SCORE 67 1-exhaust fan 1-ductwork new restroom Date: March 2, 2016 Contractor: Jts Mechanical Llc Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-01880 | |||||
SCORE 76 Demolition of an existing restroom and construction of a new restroom. This is the third phase of restroom replacement at the sugar house park. This one is located at the parleys creek pavilion area. The plans are the same as the other two that have been constructed at the fabian and hidden grove areas. Date: February 5, 2016 Contractor: Ajc Architects Permit status: Inspections | Permit id: Bld2015-07759 | |||||
SCORE 73 Remove existing public restroom in preparation of new building permit #bld2015-07759. Accessory use. Public utilities has approved the project. Contractor has daq approved. Date: January 21, 2016 Contractor: Merrill Sheriff Construction Inc Permit status: Inspections | Permit id: Bld2016-00485 |