Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 92 Demolish &; remove the bldg. Client: Musto Mario | Permit type: Removal of structure | Permit status: Open | Current use: Comm | Permit id: Sf665461 | Parcel: 1809345000 | |||||
SCORE 82 Rebuild;warehouse to replace existing fire-damaged warehouse as per plans.; install a new fire sprinkler system.; existing warehouse to be razed under a separate permit. Client: Musto Mario | Permit type: Erect | Permit status: Open | Current use: Comm | Permit id: Ert653971 | Parcel: 1809345000 | |||||
SCORE 82 Rebuild;warehouse to replace existing fire-damaged warehouse as per plans.; install a new fire sprinkler system.; existing warehouse to be razed under a separate permit. Client: Musto Mario | Permit type: Erect/new construction | Expiration date: November 18, 2017 | Current use: Comm | Permit id: Ert653971 | Parcel: 1809345000 | |||||
SCORE 92 Demolish &; remove the bldg. Client: Musto Mario | Permit type: Short form bldg permit | Expiration date: June 20, 2017 | Current use: Comm | Permit id: Sf665461 | Parcel: 1809345000 | |||||
Sidewalk deposit during renovations to a building.; ; this is not a permit to excavate occupy or install driveway openings -; separate approvals and permits are required.; deposit will be held until all construction activities are completed and the site is in walk=away condition.; upon written request a pwd engineer will inspect the site to verify that the restored sidewalk meets ada and city standards ; permuit; 60. 00; inspection; 100. 00; deposit; ; 3 312. 00 Date: December 2, 2016 Client: Musto Mario | Permit type: Sidewalk deposit | Permit id: Sdep-662526 | Parcel: 1809345000 | |||||
Cut and cap existing lines ; boston police area e; 343-4556; ; 7 am to 4 pm; ; sdep-661748 Date: December 2, 2016 Client: Musto Mario | Permit type: Excavation permit | Expiration date: December 11, 2016 | Permit id: Exca-662545 | Parcel: 1809345000 |