Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit ![]() Permit status: Completed | Permit id: 49126 | |||||
Zoning admin review ![]() Permit status: Completed | Permit id: 355704 | |||||
Zoning admin review ![]() Permit status: Active | Permit id: 185824 | |||||
Demolition permit ![]() Permit status: Active | Permit id: 720062 | |||||
Zoning/use permit ![]() Permit status: Completed | Permit id: 680689 | |||||
Zoning permit ![]() Permit status: Completed | Permit id: 686627 | |||||
Plumbing permit ![]() Permit status: Completed | Permit id: 678774 | |||||
Permit is for interior additions of neew 2nd and 3rd floors, partial demolition (removal of a portion of the existing roof left open to 1st floor below to create partially open parking fpr eight vehicles. For use of the structure as a 1st floor commercial space for uses as permitted in c-2 commercial district and eight (8) family dwellings between the 2nd and 3rd floors. ![]() Applicant: William F. Martin | Permit type: Appeal | Permit status: Granted/prov | Completion date: May 16, 2007 | Permit id: 1537 | |||||
Zoning admin review ![]() Permit status: Completed | Permit id: 355704 | |||||
Demolition permit ![]() Permit status: Completed | Permit id: 680691 | |||||
Zoning admin review ![]() Permit status: Active | Permit id: 185824 | |||||
Plumbing permit ![]() Permit status: Completed | Permit id: 678774 | |||||
Zoning permit ![]() Permit status: Completed | Permit id: 686627 | |||||
Zoning use permit ![]() Permit status: Completed | Permit id: 49126 | |||||
Zoning use permit ![]() Permit status: Completed | Permit id: 680689 | |||||
Permit is for interior additions of neew 2nd and 3rd floors, partial demolition (removal of a portion of the existing roof left open to 1st floor below to create partially open parking fpr eight vehicles. For use of the structure as a 1st floor commercial space for uses as permitted in c-2 commercial district and eight (8) family dwellings between the 2nd and 3rd floors. ![]() Applicant: William F. Martin | Permit type: Appeal | Permit status: Granted/prov | Completion date: May 16, 2007 | Permit id: 1537 | |||||
For the lot adjustment to create twelve (12) lots (proposed lots "a" through "l" on plans) from one (1) existing lot (1401 n 31st st), size and location as shown on plans. ![]() Permit type: Zoning permit | Permit status: Completed | Completion date: October 14, 2016 | Permit id: 686627 | |||||
Requesting extesion of time pursuant to pa act 46 for ap#49126 ![]() Permit type: Zoning admin review | Permit status: Completed | Completion date: July 29, 2011 | Permit id: 355704 | |||||
Request for an extension of time to pick up permit. Permit #49126 approved on 5-16-2007 with proviso as described in letter from william martin approved permit was never picked up and design construction on the project was delayed for financing reasons. ![]() Permit type: Zoning admin review | Permit status: Active | Completion date: January 15, 2009 | Permit id: 185824 | |||||
SCORE 100 Closure of one (1) 550-gallon underground storage tank (ust) ![]() ![]() Permit type: Demolition permit | Permit status: Completed | Completion date: June 30, 2017 | Permit id: 720062 | |||||
SCORE 87 For the complete demolition of the exisitng structure. For use as vacant lot. ![]() ![]() Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 27, 2016 | Permit id: 680689 | |||||
SCORE 96 Dig down remove curb trap and seal lateral pa20160831266 (mixed use)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" ![]() ![]() Permit type: Plumbing permit | Permit status: Completed | Completion date: April 1, 2016 | Permit id: 678774 | |||||
Convert to retail,office space,8 s. F. Units to include parking per plans ![]() Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 21, 2015 | Permit id: 49126 | |||||
Requesting extesion of time pursuant to pa act 87 for ap#49126 - third extension ![]() Permit type: Zoning admin review | Permit status: Abandoned | Completion date: April 4, 2017 | Permit id: 481064 | |||||
SCORE 87 For the complete demolition of an existing detached, one two story structure. Structure to be demolished by hand and with mechanical equipment per submitted documents. Pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. Foundation to remain for future construction and interim positive cellar drainage to be provided per plans and signed and sealed statement. Separate streets department permit require for closure of right of way. 21 day posting and notice required per a-303. 2. Asbestos remediation required prior to demolition. Safety zone = 13 ft at 2 story portion and 9 ft at one story portion. ![]() ![]() Permit type: Demolition permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 680691 |