Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 97 Interior basement finish - step by step basement to add a bedroom, bath and family room. Adding steps to existing for the step to 8 ceiling. Date: March 10, 2009 Contractor: Viper Construction Inc Permit status: Inspections | Current use: Residential | Permit id: Bld2009-01529 | |||||
SCORE 84 Fixture grand total 4, grand total of fixture units 8, floor drains 1 and 1 sewage ejector. Date: March 20, 2009 Contractor: M And N Plumbing Inc Permit type: Plumbing | Permit status: Inspections | Current use: Residential | Permit id: Bld2009-01743 | |||||
SCORE 56 Minimum electrical for a basement remodel. Date: April 15, 2009 Contractor: T. J. Electric L.L.C Permit type: Electrical | Permit status: Inspections | Current use: Residential | Permit id: Bld2009-02191 | |||||
SCORE 100 Installing a fireplace Date: February 24, 2014 Contractor: Hearth And Home Distributors Of Utah L.L.C Permit type: Mechanical | Permit status: Inspections | Current use: Residential | Permit id: Bld2014-01191 |