Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: September 19, 2016 Client: Becker James A Hahn Elizabeth A | Permit status: Active | Permit id: 722806 | |||||
Plumbing permit Date: July 13, 2007 Client: Becker James A Hahn Elizabeth A | Permit status: Completed | Permit id: 89087 | |||||
Alteration permit Date: September 19, 2016 Client: Becker James A Hahn Elizabeth A | Permit status: Active | Permit id: 722806 | |||||
Plumbing permit Date: July 13, 2007 Client: Becker James A Hahn Elizabeth A | Permit status: Completed | Permit id: 89087 | |||||
SCORE 76 Int demo and alt-sfd Date: September 19, 2016 Contractor: Epiphyte Builders Llc Client: Becker James A Hahn Elizabeth A | Permit type: Alteration permit | Permit status: Active | Completion date: July 26, 2017 | Permit id: 722806 | |||||
SCORE 100 2nd floor bath section of stack, ideal bend, re-rough both. 1 water closet, 2 lavs, 1 bath tub Date: July 13, 2007 Contractor: Ed Scannapieco Plumbing Inc Client: Becker James A Hahn Elizabeth A | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 25, 2007 | Permit id: 89087 | |||||
For level ii alterations throughout an existing single family dwelling to include new framing work, installation of powder room, replacement of windows, exterior doors and cabinetry. Work to also include the replacement of finishes and furnishings throughout. All work to be done per approved plans. If field conditions vary contact design professional prior to the start of any work. Separate permits required for mechanical, electrical and plumbing work. Date: December 4, 2017 Client: Becker James A Hahn Elizabeth A | Permit type: Alteration permit | Permit status: Active | Completion date: December 4, 2017 | Permit id: 798067 |