Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Installation of a new air conditioning unit. A c units cannot be placed within the required setback areas. Date: July 19, 1999 Contractor: Specialty Heating Fabricatio Client: Le, Dung | Permit type: Mechanical | Permit status: Closed | Permit id: Mec1999-00308 | |||||
SCORE 100 Ad a first branch circuit. Date: July 19, 1999 Contractor: Sharpe Electric Inc Client: Le, Dung | Permit type: Electrical | Permit status: Closed | Permit id: Elc1999-00437 |