Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Wiring of air compressor, boiler, refrigeration equipment, processing equipment, oven equipment and cooler lighting. Date: November 20, 2013 Contractor: Schebler Enterprises Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201309880 | |||||
SCORE 86 Install feeders & branch circuits & lighting Date: November 4, 2013 Contractor: Schebler Enterprises Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201309318 | |||||
Simmering soup-running sanitary line from the building to the city sewer main sanitary line from a dumpster pad floor drain to the city sewer main running sanitary line from a grease trap to the city sewer main. Date: October 11, 2013 Permit type: Commercial | Permit status: Create application | Permit id: Qcr-2013-02441 | |||||
SCORE 81 Install hvac system unit ductwork and grilles 1 exhaust fan Date: October 2, 2013 Contractor: Air Conditioning Spec Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201302860 | |||||
SCORE 86 Branch power and lighting for new office expansion. Date: September 30, 2013 Contractor: Eckardt Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201308097 | |||||
SCORE 56 Renovate plumbing to an existing space to expand simmering soup from 12,6 sf to 18,5 sf. Including dwv and water and fixture connections including office and cooking plumbing. The owner is providing several fixtures such as the wh-b and we are unsure of the source. Date: September 27, 2013 Contractor: Harveys Plumbing And Irrigation Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201303325 | |||||
Add and relocate off existing fire sprinklers per nfpa 13. Date: August 28, 2013 Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201302898 | |||||
Simmering soup is an existing food processing facility that makes prepackaged food. Simmering soup currenly, occupying 12670sf and looks to expand into additional 18,5 sf. After the expansion simmering soup will occupy 31,2 s. F. In the building Date: August 26, 2013 Permit type: Commercial | Permit status: Create application | Permit id: Qcr-2013-01939 | |||||
SCORE 86 Disconnectreconnectcommercial Date: August 12, 2013 Contractor: Schebler Enterprises Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201306451 | |||||
SCORE 86 Service upgrade: 1110-amp 3-phase 277 480 Date: June 3, 2013 Contractor: Schebler Enterprises Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201304278 | |||||
SCORE 86 Service upgrade: 800-amp 3-phase 120 208 Date: June 3, 2013 Contractor: Schebler Enterprises Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201304279 | |||||
Food manufacturer Date: February 3, 2012 Permit type: License | Permit status: Accepting application | Permit id: Zla-201200499 |