Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: December 7, 2015 Contractor: A S I Hastings Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
SCORE 86 Reroof for 3 condo buildings. See pds2016-cmaspc-0000 for all clearances. 12057 calle de montana = 76 sqft reroof if a re-roof project is proposed, the following specifications apply. Existing roofing material hot mop p gravel proposed roofing material tpo plastic manufacturer firestone brand and model tpo color (if cool roof required) white built-up roofing assembly system number per attached listing report (if applicable) icc esr 2831 specific exemption from cool roof requirements (if applicable) flat roof required building inspector field verification (if applicable) n/a note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: September 16, 2016 | Permit id: Pds2016-Comalt- | |||||
SCORE 86 Reroof for 3 condo buildings. See pds2016-cmaspc-0000 for all clearances. 12057 calle de montana = 76 sqft reroof 12065 calle de montana = 76 sqft reroof 12089 calle de montana= 80 sqft reroof if a re-roof project is proposed, the following specifications apply. Existing roofing material hot mop p gravel proposed roofing material tpo plastic manufacturer firestone brand and model tpo color (if cool roof required) white built-up roofing assembly system number per attached listing report (if applicable) icc esr 2831 specific exemption from cool roof requirements (if applicable) flat roof required building inspector field verification (if applicable) n/a note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: June 13, 2016 Contractor: Christian Roofing Permit type: Commercial multi-bldg parent | Permit status: Completed | Completion date: June 13, 2016 | Permit id: Pds2016-Cmaspc- | |||||
Final Date: September 15, 2016 Permit status: Pass | Permit id: Pds2016-Comalt- |