Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Re-lay roofing materials for condo building (remove & replace bldg paper then replace original tile) -- bora if a re-roof project is proposed, the following specifications apply. Existing roofing material lt wt conc tile proposed roofing material lt wt conc til manufacturer n a brand and model n a color (if cool roof required) n a built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: October 3, 2016 | Permit id: Pds2016-Comalt- | |||||
Final Date: September 29, 2016 Permit status: Pass | Permit id: Pds2016-Comalt- | |||||
SCORE 86 Re-lay roofing materials for condo building (remove & replace bldg paper then replace original tile) -- bora if a re-roof project is proposed, the following specifications apply. Existing roofing material lt wt conc tile proposed roofing material lt wt conc til manufacturer n a brand and model n a color (if cool roof required) n a built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) Permit type: Misc. (antennas, canopy, racks) | Permit status: Completed | Permit id: Pds2016-Comalt- | Parcel: 5022910106 |