Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wusd new high school. Frontage improvements and road widening along jefferson bl. And linden rd. Joint trench plans shall be approved by city prior to any work in r w. A pre-construction meeting is required. Inspection request line (916)617-4692. All work shall conform to city standards. Date: March 23, 2006 Permit id: 06-0164 | Parcel: 046020064000 | |||||
Swpp measures in r w. Install 1" backflow device. Temporary access road, water & sewer connections to job trailers. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: October 26, 2006 Permit id: 06-0809 | Parcel: 046020064000 | |||||
Install and remove five (5) 2" casing monitoring wells per attached cut sheet, per attached locations. Part of the high school dewatering program. Date: November 7, 2006 Permit id: 06-0848 | Parcel: 046020064000 | |||||
Install 1 water meter and backflow for temporary construction water backflow and pipe provided by contractor. Temp do not final until project close out Date: January 31, 2007 Permit id: 07-0106 | Parcel: 046020064000 | |||||
Landscaping along jefferson and linden; connection to existing irrigation system Date: October 1, 2008 Permit id: 08-0259 | Parcel: 046020064000 | |||||
SCORE 99 W. O. 99003 at&t # ac55509 install line across jefferson bl., in the vicinity of higgins rd. Date: January 6, 2012 Contractor: At And T Permit id: 12-0005 | Parcel: 046020067000 |