Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 14 Riverside Dr, Asheville, Nc 28801 September 29, 2011 11:39: am ssalyer. Excavationof contaminated soil and back filling with clean soil and seeding for asheville mgp site;this project was public funded project grading 1/2 price;sls; removal of contaminated soil: no zoning permit is required. A zoning permit must be obtained in order to establish any new use(s) or structure(s) on the site. This does not constitute approval of any uses or structures. October 4, 2011 4:42:19 pm jblevins.; approval of the grading permit is pending until the following have been accomplished: 1. Contractor picks up the approved plan from the development services center. 2. Approved plan is posted at the construction site. 3. Preliminary grading and erosion control inspection has been held, and the erosion control devices have been accepted as installed properly. Engineering inspection requests must be made at least 24 hours in advance of inspections. Inspection request should be called into redacted phone number by 7: am, or can be sche Date: December 6, 2011 Contractor: Silar Services Inc Client: Asheville Mgp Site | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 11-05650 | Parcel: 22182 |