Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 19 Half St Sw, Washington, Dc 20536 Work includes excavating for a 69kv transmission line. This is part of ddots project for the relocation of south capitol street bridge. Work is on t street between water street sw and the anacostia river. Date: February 18, 2016 Contractor: Pepco N A Client: Pepco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600407 |