Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 4845 Colorado Ave Nw, Washington, Dc 20011 Updating of 4 bathrooms on second floor and creation of arch way in second floor hallway 1. East bathroom remove parting wall between adjacent bath to create one bathroom. Replace fixtures, demo walls and floor back to rough framing. Relocate fixtures along interior wall. Drywall, tile, trim and paint 2. South bathroom - remove closets to create a passage through to the bedrooms. Demo walls and floor back to rough framing. Relocate fixtures, shower stall, and replace tub. Drywall, tile, trim and paint 3. West bathroom - demo walls, floor and fixtures. Replace the existing tub with shower. Drywall, tile, trim, and painting 4. Master bathroom remove closets to create a passage to dressing room. Demo walls and floor, relocate new fixtures and add a tub. Drywall, tile, trim and painting of new construction. 5. Hallway recessed arch opening demo and construct an arch opening to create vestibule. Prep, plaster, paint, and possible trim detail. Date: February 25, 2016 Contractor: Paul Pourreza Client: Rod Thomas | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1604870 |