Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 0 Chestnut Hill Av Brighton Ma Sidewalk deposit during reconstruction of sidewalk and hp ramps after installation of updated traffic signals &; handholes .; ;deposit will be held until all construction activities are completed and the site is in walk=away condition.; upon written request a pwd engineer will inspect the site to verify that the restored sidewalk and h-ramps meet ada and city; standards.;permit; 60. 00; inspection; 825. 00; deposit; 105 210. 00 Date: May 16, 2017 Permit type: Sidewalk deposit | Permit id: Sdep-704386 |