Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 1248 Pennsylvania Ave Se, Washington, Dc 20003 Will remove concrete and gravel on top of the middle tank in the tank field, which is an existing 80 gallon double wall fiberglass tank. Remove all tank top equipment and re-line the interior of the tank. Install new tank top sumps and motors. Date: October 9, 2013 Contractor: Mid Atlantic Construction Group Client: Sunoco Inc R ? M | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1400002 |