Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 71 4414 Rolling Meadows Ln Rockford, Il 61114 Change existing full bath into (1) 3 4 bath & (1) 1 2 bath. 8 x 12. Client: Fairhaven Christian Retirement Ctr | Permit id: Sfd20101911 | |||||
SCORE 71 Client: Fairhaven Christian Center, Fairhaven | Permit id: Sfd20111275 | |||||
SCORE 71 4409 Rolling Meadows Ln Rockford, Il 61114 Finish basement. Add half-bath. Drywall walls. Per ssommer, r-13 in exterior walls. Client: Fairhaven Christian Center, Fairhaven | Permit id: Sfd20113425 | |||||
SCORE 71 26 Highcrest Rd Rockford, Il 61107 Remove wall between existing bath and exercise room to make one large hall bathroom (size 15 x 10). Includes electrical, plumbing, mech Client: Roegner, Douglas | Permit id: Sfd20122096 |