Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 66 1 Huntington Av Boston Ma Emergency - valve off chilled water supply to ahu braze closed leaks on coil refill vent and operate. Date: April 11, 2017 Contractor: Connie Goodwin Client: Trinity Place Condominium Tr | Permit type: Bfd cutting-burning-welding | Permit id: Cbw697662 | Parcel: 0401053010 | |||||
SCORE 66 55 Fruit St Boston Ma Soft soldering of ;(1) - 5 8" and (1) - 1 1 8" refrigerant ball valve (dpl 1-day upon district approval) bfd paid detail required Date: February 15, 2017 Contractor: Connie Goodwin Client: General Hospital Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw679995 | Parcel: 0300370000 | |||||
SCORE 66 45 Province St Boston Ma Brazing of;isolate and drain heating hot water riser cut and remove compromised fittings and solder new replacement fittings. Leak check and refill heating hot water riser bfd paid detail required Date: March 13, 2017 Contractor: Connie Goodwin Permit type: Bfd cutting-burning-welding | Permit id: Cbw687380 | |||||
SCORE 66 55 Fruit St Boston Ma Cutting burning welding to install a steel beam above the chiller to rig off the motor to overhaul the chiller and to replace the economizer flange on the chiller (dpl 9 2 17) bfd paid detail required Date: March 6, 2017 Contractor: Connie Goodwin Client: General Hospital Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw685496 | Parcel: 0300370000 | |||||
SCORE 66 1 Harbor St Boston Ma Drain down hot water loop to remove flex connector &; associated pipe weld off small 1-2 section of pipe to realign system replace flex connector with new (dpl) Date: March 27, 2017 Contractor: Connie Goodwin Client: Economic Development And | Permit type: Bfd cutting-burning-welding | Permit id: Cbw691138 | Parcel: 0602674000 |