Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 92 Client: New S F Lot 4 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-06933 | Parcel: 20383 | |||||
SCORE 92 Client: Woodland Trace New Sf | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-05069 | Parcel: 20384 | |||||
SCORE 92 Client: Woodland Trace New S F | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-06662 | Parcel: 20379 | |||||
SCORE 92 Client: Woodland Trace New S F | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-06661 | Parcel: 20383 | |||||
SCORE 92 Client: New S F Lot 44 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-06934 | Parcel: 20378 | |||||
SCORE 92 Client: Woodland Trace New S F | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-06658 | Parcel: 20378 | |||||
SCORE 92 21 Ocaso Dr, Asheville, Nc 28806 May 9, 2013 3:18:16 pm ssalyer. New single family home for woodland trace llc unit 46;sls 40w exit 44 r on 10/23 r on acton circ l sandhill school rd straight onto w oakview r on crowell farms l on ocaso dr lot 46 on r; may 9, 2013 3:35:51 pm ssalyer. Drop in meter paid 1500. 00;sls; may 9, 2013 3:36:15 pm ssalyer. Informed applicant at submittal needed to bring back info;sls; may 13, 2013 1:47:21 pm ssalyer. Not a city street, still private maintenance. Coa driveway apron permit is not required. Ted williams city of asheville transportation department traffic engineering division 828. Redacted phone number -----original message----- from: sheila salyer sent: monday, may 13, 2013 8:08 am to: ted williams subject: fw:13-2781 ted can you tell me if this one needs a driveway permit. I dont think so, but i wanted to make sure. Thanks sheila -----original message; may 13, 2013 8:03:26 am ssalyer. Placed in basket;sls; may 13, 2013 4:19:57 pm heatherr. Msd fees = 2,500; may 13, 2013 8:03:44 am Client: Woodland Trace Lot 46 | Permit type: Res: new | Permit status: Co issued | Current use: Residential | Permit id: 13-02781 | Parcel: 203790 | |||||
SCORE 92 39 Ocaso Dr, Asheville, Nc 28806 June 20, 2013 3:32: pm heatherr. Woodland trace new s/f lot 28 - build new site built home; har location:sand hill school rd to oakview rd to crowell farms to pacifico dr; june 20, 2013 3:36:16 pm heatherr. Will need to pay for drop in meter with jlf; har; june 20, 2013 3:36:46 pm heatherr. Need this form; har; june 24, 2013 4:36:32 pm heatherr. Msd fees = 5,0 - this is 2,500. A piece for 39 ocaso dr and 4 pacifico dr; har; approval of the grading permit is pending until the following have been accomplished: 1. Contractor picks up the approved plan from the development services center. 2. Approved plan is posted at the construction site. 3. Preliminary grading and erosion control inspection has been held, and the erosion control devices have been accepted as installed properly. Engineering inspection requests must be made at least 24 hours in advance of inspections. Inspection request should be called into redacted phone number by 7: am, or can be scheduled via web at www. Ashevillenc Client: Woodland Trace New S F | Permit type: Res: new | Permit status: Co issued | Current use: Residential | Permit id: 13-03751 | Parcel: 203794 | |||||
SCORE 92 16 Pacifico Dr, Asheville, Nc 28806 October 10, 2013 3:29: pm heatherr. Woodland trace new s/f home lot # build new home slab on grade; har location:acton cir to snad hill school rd to w. Oakview to crowell farms to ocaso to pacifico; october 10, 2013 3:32:18 pm heatherr. Paid for meter with jamie fortner; har; october 10, 2013 3:32:37 pm heatherr. Need this form; har; october 31, 2013 1:46:09 pm mlipe. Paid 25 by ck; october 15, 2013 4:42:34 pm ssalyer. Msd fees = 2,500; building comments: refer to your approved plans and plan review checklist for written comments regarding code-related issues or corrections. The approved plans and review comments shall be maintained at the jobsite for all inspections. Inspectors need to see your plans when making their inspections. The permit is required to be posted at the jobsite at all times in a conspicuous weathertight location or container that is accessible to the city inspectors. Any new footings are required to be in Client: Woodland Trace New S F | Permit type: Res: new | Permit status: Co issued | Current use: Residential | Permit id: 13-06257 | Parcel: 203845 | |||||
SCORE 92 4 Pacifico Dr, Asheville, Nc 28806 June 20, 2013 3:32: pm heatherr. Woodland trace new s/f lot 43 - build new site built home(i revoked the driveway due to not a city maintained street, had to take 1 off grading due to driveway walready paid for and revoked one driveway and created another); har location:sand hill school rd to oakview rd to crowell farms to pacifico dr; june 20, 2013 3:36:16 pm heatherr. Drop in meter paid for with jlf; har; june 20, 2013 3:36:46 pm heatherr. Need this form; har; june 24, 2013 4:38:17 pm heatherr. Msd fees = 5,0 - this is 2,500. A piece for 39 ocaso dr and 4 pacifico dr; har; approval of the grading permit is pending until the following have been accomplished: 1. Contractor picks up the approved plan from the development services center. 2. Approved plan is posted at the construction site. 3. Preliminary grading and erosion control inspection has been held, and the erosion control devices have been accepted as installed properly. Engineering inspection requests must be made at least 2 Client: Woodland Trace New S F | Permit type: Residential | Permit status: Tco issued | Current use: Residential | Permit id: 13-03750 | Parcel: 220185 |