Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 330 Brookline Av Boston Ma 02115 Legal occupancy:; medical center; alt1254. Phase i; &; 2 of east campus loading dock receiving area. Alt111605 issued: 3 29 12 &; sf111734 issued 12 23 2011. Temporary coo valid for 90 days (11 12 2012) pending completion of planned work. Extend for additional 90 days to expire on 3 12 2013 ;thi Date: August 30, 2012 Contractor: Carlin Grenier Client: Beth Israel Hospital | Permit id: Coo151410 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 I am looking for an ammendment to my permit alt111605 to install a loading dock canopy roof and a stormdrain recharge system. Some of the cost reflected on alt111605. Sprinkler and fa. Client: Beth Israel Hospital | Permit type: Canopy | Current use: Comm | Permit id: A133106 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 Legal occupancy:; medical center coo for east campus;loading dock the basement level recieving area &; storage areas alt111605 issued: 3 29 12 &; a133106 issued: 12 13 12 &; sf111734 issued: 12 23 11 Client: Beth Israel Hospital | Permit type: Interior/exterior wo | Current use: Comm | Permit id: Coo230596 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 We are revonating 1000sq feet of space into enviromental storage(evs)including new doors hardware new outlets and finishes Client: Beth Israel Hospital | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf304893 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 Renovation of 1050 sq feet of space into a new mailroom for hospital use. Work consists of new walls doors hardware ceilings and millwork. Client: Beth Israel Hospital | Permit type: Fast track applicati | Current use: Comm | Permit id: Alt324419 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 We are renovating 250sf of space into bulk storage for environmental services. Work consists of new door frame hardware flooring electrical and paint. Client: Beth Israel Hospital | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf342286 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 Renovations include new flooring ceilings paint and finishes for central processing dept or stores Client: Beth Israel Hospital | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf342308 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 Work consists of 600sf of act ceiling removal replacement above ceiling fire stopping misc patching Client: Beth Israel Hospital | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf356484 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 New installation of modular roof guardrails steel fixed railings ladders misc painting and doors and hardware. Client: Beth Israel Hospital | Permit type: Interior/exterior wo | Current use: Comm | Permit id: Sf364348 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 Renovation of 1500sf of space for central processing departments sterile stores for hospital use. Work consists of new act ceiling lighting flooring hvac and other finishes. Client: Beth Israel Hospital | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf406135 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 Work consists of exterior sidewalk repair to concrete and also renovation to a room below work inside rose room includes wall patching lighting ceiling repair and instalation of a new sprinkler head Client: Beth Israel Hospital | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf435729 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 Work consists of creating space for new pathology training room work include new finishes of carpet act ceiling tel data and and paint Client: Beth Israel Hospital | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf435724 | Parcel: 401862000 | |||||
SCORE 96 330 Brookline Av Boston Ma 02115 To provide construction services to the east campus interventional radiology-3rd flr.;enabeling work. Work consists of new act ceiling flooring doors frames hardware and finishes forn a reading room and offices. Client: Beth Israel Hospital | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf436093 | Parcel: 401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 Hospital &; wireless communication coo for pulmonary function test clinic (first floor - rabb 1) alt6454 issued 11 17 2016 &; sf647617 issued 10 21 2016 Client: Beth Israel Deaconess | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo672282 | Parcel: 0401862000 | |||||
SCORE 96 1 Deaconess Rd Boston Ma 02215 Hospital coo for clinical procedure room (3rd floor) &; equipment room (2nd floor) - rosenberg building alt596626 issued 7 27 2016 Client: Beth Israel Deaconess | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo663101 | Parcel: 0401954001 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 ;hospital wireless communication certificate for the infusion clinic for health care at beth israel hospital alt666269 issued: 2 14 17 ; Client: Beth Israel Deaconess | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo705677 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 This project consists of interior renovation to approximately 33 square feet of clinical space. The project will be a new infusion clinic. Scope includes interior demolition new walls doors hardware hvac electrical plumbing and new finishes. Client: Beth Israel Deaconess | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt666269 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 This project consists of renovation to an existing space to accommodate new in patient beds and clinical rooms for nursing and support staff. Work includes minor architectural demo meps (4) sprinkler head relocations for new wall layout new ceiling and architectural finishes. Client: Beth Israel Deaconess | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf691630 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 This (2) phase project consists of interior renovation to 1000sf in west campus farr building for new hospital imaging equipment and support services work includes demo new meps doors and hardware flooring ceilings and finishes. Phase 1 is temporary and is being used as swing space until another project is complete. Phase 2 will be the permanent occupied space once complete. Client: Beth Israel Deaconess | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf729226 | Parcel: 0401862000 | |||||
SCORE 96 175 Pilgrim Rd Boston Ma 02215 Interior renovation of 4000sf on level 1 of the deaconess building west campus to be renovated into a cardiac outpatient unit with exam rooms observation bays and related suppoprt spaces. ; Client: Nedh Corp | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt545399 | Parcel: 0401944000 | |||||
SCORE 96 175 Pilgrim Rd Boston Ma 02215 Hospital wireless communications certificate for;the deaconess building west campus cardiac outpatient unit alt545399 issued: 1 21 16 Client: Nedh Corp | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo625005 | Parcel: 0401944000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 We are revonating 1000sq feet of space into enviromental storage(evs)including new doors/hardware new outlets and finishes Client: Beth Israel Deaconess | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf304893 | Parcel: 0401862000 | |||||
SCORE 96 89 Mt Hope St Roslindale Ma 02131 Replacement of asphalt parking lot concrete sidewalks. And curbing. Putting back what was existing but new material. Permit type: Other | Current use: Comm | Permit id: Sf133642 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 Renovation of 1500sf of space for central processing departments sterile stores for hospital use. Work consists of new act ceiling lighting flooring hvac and other finishes. Client: Beth Israel Deaconess | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf406135 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 Renovations include new flooring ceilings paint and finishes for central processing dept or stores Client: Beth Israel Deaconess | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf342308 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 Legal occupancy:; medical center coo for east campus;loading dock the basement level recieving area &; storage areas alt111605 issued: 3/29/12 &; a133106 issued: 12/13/12 &; sf111734 issued: 12/23/11 Client: Beth Israel Deaconess | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Coo230596 | Parcel: 0401862000 | |||||
SCORE 96 1 Deaconess Rd Boston Ma 02215 This project consists of interior renovation to 1000sf in west campus rosenberg building for new hospital imaging equipment and support services work includes demo new mechanical doors and hardware flooring and ceilings and finishes Client: Beth Israel Deaconess | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt596626 | Parcel: 0401954001 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 The work consists of construction services for the east campus interventional radiology(ir) expansion and upgrade. Client: Beth Israel Deaconess | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt436090 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 New installation of modular roof guardrails steel fixed railings/ladders misc painting and doors and hardware. Client: Beth Israel Deaconess | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Sf364348 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 Legal occupancy:; medical center; alt1254. Phase i; &; 2 of east campus loading dock/receiving area. Alt111605/issued: 3/29/12 &; sf111734 issued 12/23/2011. Temporary coo valid for days (11/12/2012) pending completion of planned work. Extend for additional days to expire on 3/12/2013 ;third extension expires;4/12/13;- pending issuance of a133106. Date: August 30, 2012 Contractor: Carlin Grenier Client: Beth Israel Deaconess | Permit status: Expired | Permit id: Coo151410 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 Hospital and wireless communications certificate of occuapncy for;beth isreal deconess medical center east campus interventional radiology(ir) alt4360 issued: 3 23 15 Client: Beth Israel Deaconess | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo560926 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 We are renovating 250sf of space into bulk storage for environmental services. Work consists of new door frame hardware flooring electrical and paint. Client: Beth Israel Deaconess | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf342286 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 Work consists of 600sf of act ceiling removal/replacement above ceiling fire stopping misc patching Client: Beth Israel Deaconess | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf356484 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 Work consists of creating space for new pathology training room work include new finishes of carpet act ceiling tel/data and and paint Client: Beth Israel Deaconess | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf435724 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 I am looking for an ammendment to my permit alt111605 to install a loading dock canopy roof and a stormdrain recharge system. Some of the cost reflected on alt111605. Sprinkler and fa. Client: Beth Israel Deaconess | Permit type: Canopy | Permit status: Expired | Current use: Comm | Permit id: A133106 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 To provide construction services to the east campus interventional radiology-3rd flr.;enabeling work. Work consists of new act ceiling flooring doors/frames/hardware and finishes forn a reading room and offices. Client: Beth Israel Deaconess | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf436093 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 Renovation of 10 sq feet of space into a new mailroom for hospital use. Work consists of new walls doors/hardware ceilings and millwork. Client: Beth Israel Deaconess | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt324419 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma 02115 Work consists of exterior sidewalk repair to concrete and also renovation to a room below work inside rose room includes wall patching lighting ceiling repair and instalation of a new sprinkler head Client: Beth Israel Deaconess | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf435729 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma I am looking for an ammendment to my permit alt111605 to install a loading dock canopy roof and a stormdrain recharge system. Some of the cost reflected on alt111605. Sprinkler and fa. Client: Beth Israel Hospital | Permit type: Amendment to a long form | Expiration date: June 13, 2013 | Current use: Comm | Permit id: A133106 | Parcel: 0401862000 | |||||
SCORE 96 89 Mt Hope St Roslindale Ma Replacement of asphalt parking lot concrete sidewalks. And curbing. Putting back what was existing but new material. Permit type: Short form bldg permit | Expiration date: October 19, 2012 | Current use: Comm | Permit id: Sf133642 | |||||
SCORE 96 175 Pilgrim Rd Boston Ma Interior renovation of 4000sf on level 1 of the deaconess building west campus to be renovated into a cardiac outpatient unit with exam rooms observation bays and related suppoprt spaces. ; Client: Nedh Corp | Permit type: Long form/alteration permit | Expiration date: July 21, 2016 | Current use: Comm | Permit id: Alt545399 | Parcel: 0401944000 | |||||
SCORE 96 3 Brookline Av Boston Ma Renovations include new flooring ceilings paint and finishes for central processing dept or stores Client: Beth Israel Hospital | Permit type: Short form bldg permit | Expiration date: September 7, 2014 | Current use: Comm | Permit id: Sf342308 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma The work consists of construction services for the east campus interventional radiology(ir) expansion and upgrade. Client: Beth Israel Hospital | Permit type: Long form/alteration permit | Expiration date: September 23, 2015 | Current use: Comm | Permit id: Alt436090 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma We are renovating 250sf of space into bulk storage for environmental services. Work consists of new door frame hardware flooring electrical and paint. Client: Beth Israel Hospital | Permit type: Short form bldg permit | Expiration date: September 7, 2014 | Current use: Comm | Permit id: Sf342286 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma Work consists of exterior sidewalk repair to concrete and also renovation to a room below work inside rose room includes wall patching lighting ceiling repair and instalation of a new sprinkler head Client: Beth Israel Hospital | Permit type: Short form bldg permit | Expiration date: June 17, 2015 | Current use: Comm | Permit id: Sf435729 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma Renovation of 1500sf of space for central processing departments sterile stores for hospital use. Work consists of new act ceiling lighting flooring hvac and other finishes. Client: Beth Israel Hospital | Permit type: Short form bldg permit | Expiration date: June 17, 2015 | Current use: Comm | Permit id: Sf406135 | Parcel: 0401862000 | |||||
SCORE 96 175 Pilgrim Rd Boston Ma Interior renovation of 4000sf of space on 1st floor deaconness building at beth israel deaconess medical center west campus work to be complete involves demo framing doors and hardware ceiling flooring finishes and paint. Space will be a new cardiac care unit. Date: March 30, 2016 Contractor: Carlin Grenier Client: Nedh Corp | Permit type: Bfd construction demo reno | Permit id: Fdc574328 | Parcel: 0401944000 | |||||
SCORE 96 175 Pilgrim Rd Boston Ma Hospital wireless communications certificate for;the deaconess building west campus cardiac outpatient unit alt545399 issued: 1 21 16 Client: Nedh Corp | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo625005 | Parcel: 0401944000 | |||||
SCORE 96 3 Brookline Av Boston Ma Hospital and wireless communications certificate of occuapncy for;beth isreal deconess medical center east campus interventional radiology(ir) alt4360 issued: 3 23 15 Client: Beth Israel Deaconess | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo560926 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma Renovation of 10 sq feet of space into a new mailroom for hospital use. Work consists of new walls doors/hardware ceilings and millwork. Client: Beth Israel Deaconess | Permit type: Long form/alteration permit | Expiration date: September 7, 2014 | Current use: Comm | Permit id: Alt324419 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma New installation of modular roof guardrails steel fixed railings/ladders misc painting and doors and hardware. Client: Beth Israel Deaconess | Permit type: Short form bldg permit | Expiration date: November 20, 2014 | Current use: Comm | Permit id: Sf364348 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma We are revonating 1000sq feet of space into enviromental storage(evs)including new doors/hardware new outlets and finishes Client: Beth Israel Deaconess | Permit type: Short form bldg permit | Expiration date: May 14, 2014 | Current use: Comm | Permit id: Sf304893 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma Work consists of creating space for new pathology training room work include new finishes of carpet act ceiling tel/data and and paint Client: Beth Israel Deaconess | Permit type: Short form bldg permit | Expiration date: June 17, 2015 | Current use: Comm | Permit id: Sf435724 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma To provide construction services to the east campus interventional radiology-3rd flr.;enabeling work. Work consists of new act ceiling flooring doors/frames/hardware and finishes forn a reading room and offices. Client: Beth Israel Deaconess | Permit type: Short form bldg permit | Expiration date: June 18, 2015 | Current use: Comm | Permit id: Sf436093 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma Work consists of 600sf of act ceiling removal/replacement above ceiling fire stopping misc patching Client: Beth Israel Deaconess | Permit type: Short form bldg permit | Expiration date: November 20, 2014 | Current use: Comm | Permit id: Sf356484 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma Legal occupancy:; medical center coo for east campus;loading dock the basement level recieving area &; storage areas alt111605 issued: 3/29/12 &; a133106 issued: 12/13/12 &; sf111734 issued: 12/23/11 Client: Beth Israel Deaconess | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo230596 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma Legal occupancy:; medical center; alt1254. Phase i; &; 2 of east campus loading dock/receiving area. Alt111605/issued: 3/29/12 &; sf111734 issued 12/23/2011. Temporary coo valid for days (11/12/2012) pending completion of planned work. Extend for additional days to expire on 3/12/2013 ;third extension expires;4/12/13;- pending issuance of a133106. Date: August 30, 2012 Contractor: Carlin Grenier Client: Beth Israel Deaconess | Permit type: Certificate of occupancy | Expiration date: April 12, 2013 | Permit id: Coo151410 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma This project consists of renovation to an existing space to make way for a new pft clinic work includes minor non structural demo-only metal studs drywall partitions doors and frames and misc mechanical equipment removal. No hot work will be performed for any demolition. Date: October 21, 2016 Contractor: Carlin Grenier Permit type: Bfd construction demo reno | Permit id: Fdc645496 | |||||
SCORE 96 1 Deaconess Rd Boston Ma This project consists of interior renovation to 1000sf in west campus rosenberg building for new hospital imaging equipment and support services work includes demo new mechanical doors and hardware flooring and ceilings and finishes Client: Beth Israel Deaconess | Permit type: Long form/alteration permit | Expiration date: January 27, 2017 | Current use: Comm | Permit id: Alt596626 | Parcel: 0401954001 | |||||
SCORE 96 1 Deaconess Rd Boston Ma Interior renovation to 20 sf of space on 3rd floor of rosenberg building at beth israel west campus work to be completed involves demo framing doors and hardware ;hvac and finishes. The space will become a new imaging procedure room for radiology flouroscopy Date: July 27, 2016 Contractor: Carlin Grenier Client: Beth Israel Deaconess | Permit type: Bfd construction demo reno | Permit id: Fdc612294 | Parcel: 0401954001 | |||||
SCORE 96 3 Brookline Av Boston Ma ;hospital wireless communication certificate for the infusion clinic for health care at beth israel hospital alt666269 issued: 2 14 17 ; Client: Beth Israel Deaconess | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo705677 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma This project consists of renovation to an existing space to accommodate new in patient beds and clinical rooms for nursing and support staff. Work includes minor architectural demo meps (4) sprinkler head relocations for new wall layout new ceiling and architectural finishes. Client: Beth Israel Deaconess | Permit type: Short form bldg permit | Expiration date: September 27, 2017 | Current use: Comm | Permit id: Sf691630 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma Interior renovation to include architectural and mechanical demolition and installation of architectural items like doors ceilings flooring Date: December 20, 2016 Contractor: Carlin Grenier Permit type: Bfd construction demo reno | Permit id: Fdc666203 | |||||
SCORE 96 3 Brookline Av Boston Ma This project consists of interior renovation to approximately 33 square feet of clinical space. The project will be a new infusion clinic. Scope includes interior demolition new walls doors hardware hvac electrical plumbing and new finishes. Client: Beth Israel Deaconess | Permit type: Long form/alteration permit | Expiration date: August 14, 2017 | Current use: Comm | Permit id: Alt666269 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma ;renovation to an existing space to accommodate new in patient beds and clinical rooms for nursing and support staff. Work include minor architectural demo relocations for new wall layout new ceiling and architectural finishes. Date: March 27, 2017 Contractor: Carlin Grenier Client: Beth Israel Deaconess | Permit type: Bfd construction demo reno | Permit id: Fdc691641 | Parcel: 0401862000 | |||||
SCORE 96 1 Deaconess Rd Boston Ma Hospital coo for clinical procedure room (3rd floor) &; equipment room (2nd floor) - rosenberg building alt596626 issued 7 27 2016 Client: Beth Israel Deaconess | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo663101 | Parcel: 0401954001 | |||||
SCORE 96 3 Brookline Av Boston Ma Hospital &; wireless communication coo for pulmonary function test clinic (first floor - rabb 1) alt6454 issued 11 17 2016 &; sf647617 issued 10 21 2016 Client: Beth Israel Deaconess | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo672282 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma Renovations to an existing space for new procedure room equipment of space on 4th floor of farr building at beth israel west campus work to be completed involves demo framing doors and hardware and finishes. Date: July 20, 2017 Contractor: Carlin Grenier Client: Beth Israel Deaconess | Permit type: Bfd construction demo reno | Expiration date: July 18, 2018 | Permit id: Fdc729235 | Parcel: 0401862000 | |||||
SCORE 96 3 Brookline Av Boston Ma This (2) phase project consists of interior renovation to 1000sf in west campus farr building for new hospital imaging equipment and support services work includes demo new meps doors and hardware flooring ceilings and finishes. Phase 1 is temporary and is being used as swing space until another project is complete. Phase 2 will be the permanent occupied space once complete. Client: Beth Israel Deaconess | Permit type: Short form bldg permit | Expiration date: January 20, 2018 | Current use: Comm | Permit id: Sf729226 | Parcel: 0401862000 |