Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Overlash fiber optic cable to existing comcast aerial route. Pull fiber optic cable through existing underground conduit. Construction of new underground conduit path along 4th and shattuck. South of railroad overhead on shattuck. East on 6th overhead north on morris overhead east on 5th overhead. South on williams overhead to grady. Grady to talbot in conduit. Pre-con required. Overhead variance approved. Date: March 25, 2014 Contractor: Rebecca Reiff Sefnco Communications Inc Client: Null | Permit type: Franchise | Permit status: Expired | Expiration date: December 31, 2014 | Permit id: Mfp14001508 |