SCORE 61 Low voltage fire alarm ![]() ![]() Permit type: Low voltage | Permit status: Completed | Completion date: September 27, 2010 | Current use: Commercial | Permit id: Bld2010-05284 | |||||
SCORE 66 Interior only, non structural demo of office space. No new work excepet capping off elec, mech, & plmb. Drawings are for reference only, new work will be submitted in 4-6 weeks. Tmb ah 05 19 2010 ![]() Permit status: Pass | Completion date: April 1, 2013 | Current use: Commercial | Permit id: Bld2010-03251 | |||||
SCORE 61 Fire alarm for 13th floor remodel ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: September 20, 2010 | Current use: Commercial | Permit id: Bld2010-05081 | |||||
SCORE 59 Replacing existing hollow metal doors and frames and add 2 coiling doors. Door types, sizes and harware remains the same. (maintenance replacement) g. S. D-1 zone, interior to doors. A. S. ![]() Permit status: Pass | Completion date: September 17, 2010 | Current use: Commercial | Permit id: Bld2010-04368 | |||||
SCORE 56 Complete electrical remodel of first floor, west wing. Includes interior and site lighting, fire alarm, intrusion detection. ![]() ![]() Permit type: Electrical | Permit status: Inspections | Completion date: March 16, 2016 | Current use: Commercial | Permit id: Bld2016-02256 | |||||
SCORE 56 Fire sprinkler ti ![]() Permit type: Fire | Permit status: Inspections | Completion date: March 14, 2016 | Current use: Commercial | Permit id: Bld2016-02095 | |||||
SCORE 56 This is a remodel of the main level, west wing of the church office building. We will be replacing the existing devices with new devices. A new nac will be installed in the electrical closet to control the strobes. New amplifiers will be installed in the data gathering panel on the third floor for voice control. Wiring is already in place from the dgp on the 3rd floor to the electrical room where the new nac will be installed. All wiring will be class a. ![]() ![]() Permit type: Low voltage | Permit status: Inspections | Completion date: March 14, 2016 | Current use: Commercial | Permit id: Bld2016-01338 | |||||
SCORE 56 Complete interior remodels of the 27th and 28th floors of the lds church office building. Non-structural. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907, at both floors. Add new ada compliant single-user restrooms at both floors. Replace existing drinking fountains with new ada compliant electric water coolers at both floors. Add new ada compliant break room at 28th floor. ![]() Permit status: Inspections | Completion date: March 24, 2016 | Current use: Commercial | Permit id: Bld2016-00598 | |||||
SCORE 61 Tenant finish of a small area on level 1 of the church office building. ![]() ![]() Permit type: Fire | Permit status: Inspections | Completion date: December 28, 2015 | Current use: Commercial | Permit id: Bld2015-10381 | |||||
SCORE 56 Lds church office building main level west wing complete floor remodel complete interior remodel of the main level west wing of the lds church office building. Non-structural; except for the removal existing cmu shaftwall at abandoned lamson mail delivery system. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907. Add new ada compliant single-user restroom. Replace existing drinking fountains with new ada compliant electric water coolers. ![]() Permit status: Inspections | Completion date: December 31, 2015 | Current use: Commercial | Permit id: Bld2015-08789 | |||||
Remodel and add fire sprinklers to levels 27 & 28 ![]() Permit type: Fire | Permit status: Inspections | Completion date: July 6, 2016 | Current use: Commercial | Permit id: Bld2016-05542 | |||||
SCORE 61 Tenant improvement on level 1ll ![]() ![]() Permit type: Electrical | Permit status: Closed | Completion date: December 17, 2015 | Current use: Commercial | Permit id: Bld2015-08384 | |||||
SCORE 56 Interior remodel of lds church office building cafeteria located on lower level 1, non-structural. To provide new, simple food preparation area and office areas. ![]() Permit status: Inspections | Completion date: July 22, 2016 | Current use: Commercial | Permit id: Bld2016-05801 | |||||
SCORE 56 Replace 5-vav boxes, register grilles, dampers, controls, test and balance, duct ![]() Permit type: Mechanical | Permit status: Inspections | Completion date: July 29, 2016 | Current use: Commercial | Permit id: Bld2016-07079 | |||||
SCORE 56 Remodel of cafeteria area level 1ll gc permit bld2016-05801 ![]() ![]() Permit type: Electrical | Permit status: Inspections | Completion date: August 1, 2016 | Current use: Commercial | Permit id: Bld2016-07117 | |||||
SCORE 56 Tenant improvement of 27th and 28th floors ![]() ![]() Permit type: Electrical | Permit status: Inspections | Completion date: April 26, 2016 | Current use: Commercial | Permit id: Bld2016-03911 | |||||
Ductwork... Hvac remodel of the west wing lds church office building ![]() Permit type: Mechanical | Permit status: Inspections | Completion date: May 4, 2016 | Current use: Commercial | Permit id: Bld2016-04245 | |||||
SCORE 56 Install new plumbing fixtures ![]() Permit type: Plumbing | Permit status: Closed | Completion date: August 4, 2016 | Current use: Commercial | Permit id: Bld2016-04285 | |||||
SCORE 56 Remodel 27 & 28th floors.----2-drinking fountains 1-kitchen sink 2-wash basins-lavs 2-water closets, flushometer type, 1. 6 gal. ![]() Permit type: Plumbing | Permit status: Inspections | Completion date: June 9, 2016 | Current use: Commercial | Permit id: Bld2016-05491 | |||||
Relocate existing sprinkler heads to accommodate new ceiling layout ![]() Permit type: Fire | Permit status: Inspections | Completion date: August 11, 2016 | Current use: Commercial | Permit id: Bld2016-06867 | |||||
SCORE 56 Hvac remodel ![]() Permit type: Mechanical | Permit status: Inspections | Completion date: July 13, 2016 | Current use: Commercial | Permit id: Bld2016-06590 | |||||
SCORE 61 13 fixtures. Install plumbing fixtures and piping ![]() Permit type: Plumbing | Permit status: Closed | Completion date: December 14, 2015 | Current use: Commercial | Permit id: Bld2015-09206 | |||||
SCORE 59 Install ductwork, (10) dual duct vav boxes, controls, hvac test and balance ![]() Permit type: Mechanical | Permit status: Closed | Completion date: December 17, 2015 | Current use: Commercial | Permit id: Bld2015-08881 | |||||
SCORE 59 Installing an addressable system in the temple proper and annex bldg. Devices will be replaced 1 for 1 in 95% of the building. This will not be a full upgrade at this time, but will accomodate for coverage based on the existing system. ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: February 25, 2013 | Current use: Commercial | Permit id: Bld2012-05726 | |||||
SCORE 64 Project is to add notification appliances in the corridors of the annex and sl temple structures. ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: February 11, 2015 | Current use: Commercial | Permit id: Bld2014-09340 | |||||
SCORE 64 Detection for rooms to be added to existing preaction system. ![]() ![]() Permit type: Low voltage | Permit status: Completed | Completion date: August 2, 2013 | Current use: Commercial | Permit id: Bld2013-04502 | |||||
SCORE 59 Remodel the 24th floor of the church office building ![]() Permit type: Mechanical | Permit status: Completed | Completion date: January 7, 2015 | Current use: Commercial | Permit id: Bld2015-00101 | |||||
SCORE 64 Replace existing ups system ![]() Permit type: Electrical | Permit status: Pass | Completion date: August 25, 2014 | Current use: Commercial | Permit id: Bld2014-04922 | |||||
SCORE 64 Interior space finished out requires pendent heads to be dropped to protect new space and ceiling layout. (existing heads are pendent style and are located in 1" outlets using bushings) ![]() Permit type: Fire | Permit status: Completed | Completion date: March 21, 2011 | Current use: Commercial | Permit id: Bld2011-00623 | |||||
SCORE 64 Low voltage ![]() Permit type: Fire | Permit status: Pass | Completion date: March 17, 2015 | Current use: Commercial | Permit id: Bld2015-00740 | |||||
SCORE 64 1-lav, 1-water closet, 1-drain bathroom remodel ![]() ![]() Permit type: Plumbing | Permit status: Pass | Completion date: April 16, 2015 | Current use: Commercial | Permit id: Bld2014-09371 | |||||
SCORE 100 Interior remodel ![]() ![]() Permit status: Pass | Completion date: February 23, 2015 | Current use: Commercial | Permit id: Bld2014-09469 | |||||
SCORE 64 Plan review approved for permit issuance. Please arrange to pay the balance due. Fire suppression ![]() Permit type: Fire | Permit status: Completed | Completion date: February 10, 2015 | Current use: Commercial | Permit id: Bld2015-00441 | |||||
SCORE 69 Fire sprinkler system. Food court block 75 building 4 ![]() Permit type: Low voltage | Permit status: Completed | Completion date: March 9, 2011 | Current use: Commercial | Permit id: Bld2011-00487 | |||||
SCORE 77 Fire sprinkler system. Module 3 ![]() ![]() Permit type: Fire | Permit status: Pass | Completion date: February 3, 2012 | Current use: Commercial | Permit id: Bld2012-00667 | |||||
SCORE 59 Hvac remodel of 23 floor ![]() Permit type: Mechanical | Permit status: Pass | Completion date: February 12, 2015 | Current use: Commercial | Permit id: Bld2014-07147 | |||||
SCORE 64 Remodel of entire floor. Use all new equipment and tie to existing transponder in electrical room. Mount new nac panel in closet located in store room 2301 to run strobe circuits, run speaker circuits to the existing transponder. Damper shutdown relays are to be located in each of the electrical rooms. The east electrical room will close the east dampers and the west electrical room will close the west dampers. Duct detectors will be mounted within 5 of each damper. The initiating circuit will run back to the existing transponder, the circuit is m9. Won-door controller is located in the east electrical room and connect to the transponder from there. ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: February 10, 2015 | Current use: Commercial | Permit id: Bld2014-06524 | |||||
SCORE 64 Various piping for new fixtures at church office bldg. ![]() ![]() Permit type: Plumbing | Permit status: Pass | Completion date: March 4, 2013 | Current use: Commercial | Permit id: Bld2013-00076 | |||||
SCORE 64 Hvac sheet metal ![]() ![]() Permit type: Mechanical | Permit status: Pass | Completion date: May 29, 2014 | Current use: Commercial | Permit id: Bld2013-07691 | |||||
SCORE 64 Electrical rough in for door modifications ![]() Permit type: Electrical | Permit status: Reviews not require | Completion date: November 14, 2011 | Current use: Commercial | Permit id: Bld2011-07479 | |||||
SCORE 59 Renovation of the existing cafeteria & dining areas to include renovated salad bar area and soup bar; also upgrading floor & wall finishes. ![]() Permit status: Pass | Completion date: August 2, 2013 | Current use: Commercial | Permit id: Bld2013-00978 | |||||
SCORE 64 This is a complete remodel of the 24th floor of the church office building. A new nac panel will be installed to control the new strobes and the existing speaker circuit will be used to run the new speakers. New duct detectors will be installed as well as all equipment that makes up the fire alarm for this floor. ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: March 31, 2015 | Current use: Commercial | Permit id: Bld2014-08454 | |||||
SCORE 69 Site modifications for the placement of bollards on private property 07 12 2011 ![]() Permit status: Pass | Completion date: March 15, 2013 | Current use: Commercial | Permit id: Bld2011-04263 | |||||
SCORE 77 Fire sprinkler system. Module 3 ![]() ![]() Permit type: Fire | Permit status: Pass | Completion date: August 13, 2012 | Current use: Commercial | Permit id: Bld2011-05147 | |||||
SCORE 86 Temp structure, annual church function ![]() ![]() Permit type: Temporary use | Permit status: Accepted - standard | Completion date: October 6, 2011 | Permit id: Bld2011-06453 | |||||
SCORE 59 Splits are charged for both heating and cooling. Install 1. 5 ton unitary split system ![]() Permit type: Mechanical | Permit status: Pass | Completion date: August 25, 2014 | Current use: Commercial | Permit id: Bld2014-05135 | |||||
SCORE 64 Fire door and overhead door upgrades ![]() ![]() Permit status: Pass | Completion date: February 9, 2012 | Current use: Commercial | Permit id: Bld2011-06201 | |||||
SCORE 64 We will prepare the existing roof to receive the new system by removing the existing epdm membrane. We will be installing tapered foam crickets around the outside between drains and a 1 4" hard board will be installed. We will be installing a light grey s-327 mil pvc single-ply membrane, manufactured by sarnafil. This system will be attached using rhino bond adhered mechanically fastening system. ![]() Permit type: Roofing | Permit status: Pass | Completion date: May 13, 2014 | Current use: Commercial | Permit id: Bld2014-02647 | |||||
SCORE 64 Fire alarm for 14th remodel ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: March 8, 2013 | Current use: Commercial | Permit id: Bld2012-08988 | |||||
SCORE 64 Install ahu, coils, pumps, and fan coil units ![]() Permit type: Mechanical | Permit status: Pass | Completion date: March 31, 2014 | Current use: Commercial | Permit id: Bld2013-07968 | |||||
SCORE 64 Remodel of the east wing of the church office building. Floors include levels 4, 3, 2, 1, ll1, ll2, and ll3. Floors 1, ll1, ll2, and ll3 will connect to the ll1 east transponder. Floors 4, 3, and 2 will connect to the 3rd floor east transponder. ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: March 28, 2014 | Current use: Commercial | Permit id: Bld2013-07805 | |||||
SCORE 59 Lds church intends to remodel the three main stairwells to the church office building tower: center stairwell, north east stairwell and north west stairwell. This is a voluntary seismic upgrade including an aesthetic refresh to the finish materials in the stairwells. Scope of work includes the main level up to the 28th and 29th floors. No work in the lower parking stairwells will be completed. No work in the east wing or west wing stairwells will be completed at this time. Intent is for the construction of this project to be phased. A detailed description of the construction phasing is included within the the design criteria. ![]() Permit status: Completed | Completion date: August 7, 2014 | Current use: Commercial | Permit id: Bld2013-01195 | |||||
SCORE 61 Replacement of duct work and terminal units entire floor ![]() Permit type: Mechanical | Permit status: Closed | Completion date: August 30, 2016 | Current use: Commercial | Permit id: Bld2012-09350 | |||||
SCORE 59 Non-structural remodel converting portions of existing cafeteria seating area, office area, and storage room into a new health unit ![]() Permit status: Closed | Completion date: December 17, 2015 | Current use: Commercial | Permit id: Bld2015-05914 | |||||
SCORE 56 Lds church office building main level west wing complete floor remodel complete interior remodel of the main level west wing of the lds church office building. Non-structural; except for the removal existing cmu shaftwall at abandoned lamson mail delivery system. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907. Add new ada compliant single-user restroom. Replace existing drinking fountains with new ada compliant electric water coolers. ![]() Permit status: Closed | Completion date: September 19, 2016 | Current use: Commercial | Permit id: Bld2015-08789 | |||||
SCORE 59 Install ductwork, (10) dual duct vav boxes, controls, hvac test and balance ![]() Permit type: Mechanical | Permit status: Closed | Completion date: December 17, 2015 | Current use: Commercial | Permit id: Bld2015-08881 | |||||
SCORE 56 Complete interior remodels of the 27th and 28th floors of the lds church office building. Non-structural. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907, at both floors. Add new ada compliant single-user restrooms at both floors. Replace existing drinking fountains with new ada compliant electric water coolers at both floors. Add new ada compliant break room at 28th floor. ![]() Permit status: Closed | Completion date: November 4, 2016 | Current use: Commercial | Permit id: Bld2016-00598 | |||||
SCORE 56 Fire sprinkler ti ![]() Permit type: Fire | Permit status: Inspections | Completion date: March 14, 2016 | Current use: Commercial | Permit id: Bld2016-02095 | |||||
SCORE 56 Add new nac panel on the 27th floor to run new strobes on the 27th & 28th floors. Replace and/or add devices to existing speaker circuits and slc circuits due to the remodeling of these two floors. ![]() ![]() Permit type: Low voltage | Permit status: Inspections | Completion date: May 20, 2016 | Current use: Commercial | Permit id: Bld2016-03776 | |||||
SCORE 56 Ductwork... Hvac remodel of the west wing lds church office building ![]() ![]() Permit type: Mechanical | Permit status: Closed | Completion date: August 30, 2016 | Current use: Commercial | Permit id: Bld2016-04245 | |||||
SCORE 56 Remodel and add fire sprinklers to levels 27 & 28 ![]() ![]() Permit type: Fire | Permit status: Closed | Completion date: November 1, 2016 | Current use: Commercial | Permit id: Bld2016-05542 | |||||
SCORE 56 Interior remodel of lds church office building cafeteria located on lower level 1, non-structural. To provide new, simple food preparation area and office areas. ![]() Permit status: Closed | Completion date: October 11, 2016 | Current use: Commercial | Permit id: Bld2016-05801 | |||||
SCORE 56 Hvac remodel ![]() Permit type: Mechanical | Permit status: Closed | Completion date: October 28, 2016 | Current use: Commercial | Permit id: Bld2016-06590 | |||||
SCORE 56 Relocate existing sprinkler heads to accommodate new ceiling layout ![]() Permit type: Fire | Permit status: Closed | Completion date: September 29, 2016 | Current use: Commercial | Permit id: Bld2016-06867 | |||||
SCORE 56 Lds church office building 21st level complete floor remodel complete interior remodel of the 21st floor of the lds church office building. Non-structural. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907. 3. Add new ada compliant single-user restroom. Replace existing drinking fountains with new ada compliant electric water coolers ![]() Permit status: Inspections | Completion date: November 4, 2016 | Current use: Commercial | Permit id: Bld2016-07640 | |||||
SCORE 56 Relocate and or add 4 speaker strobes and 2 strobes to remodel of the cafeteria on ll1. Connect speakers to existing speaker circuit from the health unit. Run new class a wiring for the strobes from the existing transponder using unused circuit nac6. ![]() ![]() Permit type: Low voltage | Permit status: Closed | Completion date: October 7, 2016 | Current use: Commercial | Permit id: Bld2016-07721 | |||||
SCORE 56 Add new plumbing fixtures ![]() Permit type: Plumbing | Permit status: Closed | Completion date: September 21, 2016 | Current use: Commercial | Permit id: Bld2016-07873 | |||||
SCORE 56 New sprinkler system for level 21 of the church office building ![]() ![]() Permit type: Fire | Permit status: Inspections | Completion date: November 4, 2016 | Current use: Commercial | Permit id: Bld2016-09293 | |||||
SCORE 56 Add a new nac panel to the 21st floor and add new devices as shown on the drawings. This is a complete remodel of the 21st floor and all devices will be new. ![]() ![]() Permit type: Low voltage | Permit status: Inspections | Completion date: November 14, 2016 | Current use: Commercial | Permit id: Bld2016-09635 | |||||
SCORE 56 Tenant improvement of the 21st floor ![]() ![]() Permit type: Electrical | Permit status: Inspections | Completion date: November 8, 2016 | Current use: Commercial | Permit id: Bld2016-10355 | |||||
SCORE 56 Hvac installation ![]() ![]() Permit type: Mechanical | Permit status: Inspections | Completion date: November 29, 2016 | Current use: Commercial | Permit id: Bld2016-10951 | |||||
SCORE 56 Replace drinking fountains with ada electric water coolers. Install new sink, carrier and lav ![]() ![]() Permit type: Plumbing | Permit status: Inspections | Completion date: December 8, 2016 | Current use: Commercial | Permit id: Bld2016-11225 | |||||
SCORE 64 Elec work for cob fire door project ![]() Permit type: Electrical | Permit status: Pass | Completion date: September 16, 2010 | Current use: Commercial | Permit id: Bld2010-04658 | |||||
SCORE 66 13th floor interior remodel. Fixture grand total 2, grand total of fixture units 5 and 1 floor drains. ![]() Permit type: Plumbing | Permit status: Completed | Completion date: January 11, 2011 | Current use: Commercial | Permit id: Bld2010-05451 | |||||
SCORE 64 Elec work for 13th flr remodel ![]() Permit type: Electrical | Permit status: No certificate req | Completion date: January 11, 2011 | Current use: Commercial | Permit id: Bld2010-05084 | |||||
SCORE 64 Fire alarm system for the 13th floor interior remodel. ![]() Permit type: Fire | Permit status: No certificate req | Completion date: May 17, 2011 | Current use: Commercial | Permit id: Bld2010-05777 | |||||
SCORE 66 Ductwork misc. Work for 13th floor interior remodel ![]() Permit type: Mechanical | Permit status: No certificate req | Completion date: January 11, 2011 | Current use: Commercial | Permit id: Bld2010-06108 | |||||
SCORE 66 Fire sprinkler modifications for 13th floor interior remodel. ![]() Permit type: Fire | Permit status: Completed | Completion date: January 11, 2011 | Current use: Commercial | Permit id: Bld2010-05000 | |||||
SCORE 64 Low voltage fire alarm system. ![]() Permit type: Low voltage | Permit status: Pass | Completion date: March 31, 2011 | Current use: Commercial | Permit id: Bld2010-05778 | |||||
SCORE 59 Install 36 vav fan coil units for interior remodel - 13th ![]() ![]() Permit type: Mechanical | Permit status: Pass | Completion date: April 1, 2013 | Current use: Commercial | Permit id: Bld2010-04976 | |||||
SCORE 59 Interior remodel of 14th floor d. D. A. H. D. W. ![]() Permit status: Pass | Completion date: March 8, 2013 | Current use: Commercial | Permit id: Bld2012-07762 | |||||
SCORE 66 Interior non-structural demolition, fire proofing will be included in the scope of this permit d. D. A. H. ![]() Permit status: Accepted - standard | Completion date: October 19, 2012 | Current use: Commercial | Permit id: Bld2012-07761 | |||||
SCORE 66 Interior remodel of the church office building 14th floor. Gc permit #bld2012-07762 ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: March 8, 2013 | Current use: Commercial | Permit id: Bld2012-09321 | |||||
SCORE 61 Replacement of duct work and terminal units entire floor ![]() Permit type: Mechanical | Permit status: Completed | Completion date: December 28, 2012 | Current use: Commercial | Permit id: Bld2012-09350 | |||||
SCORE 61 14th floor to receive fire sprinkler system. We will begin our work after the control valve and flow switch that is currently installed. ![]() ![]() Permit type: Fire | Permit status: Completed | Completion date: December 27, 2012 | Current use: Commercial | Permit id: Bld2012-09111 | |||||
SCORE 59 Lds church office building - 14th floor vault & vault ante room fm-2 fire suppression system with controls for pre-action fire sprinkler system (pre-action sprinkler system is furnished and installed by others) ![]() Permit type: Fire | Permit status: Pass | Completion date: March 8, 2013 | Current use: Commercial | Permit id: Bld2013-00771 | |||||
SCORE 66 Fire sprinklers nob publishing services ![]() Permit type: Fire | Permit status: Pass | Completion date: August 2, 2013 | Current use: Commercial | Permit id: Bld2013-03533 | |||||
SCORE 59 Int tenant improvement, mech elec plmbg permits reqd k. A. Int remodel only a. H. D. W. ![]() Permit status: Pass | Completion date: May 30, 2014 | Current use: Commercial | Permit id: Bld2013-04165 | |||||
SCORE 66 Church office building east wing remodel of 4 floors ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: March 28, 2014 | Current use: Commercial | Permit id: Bld2013-06002 | |||||
SCORE 66 Adding sprinklers to levels 1-4 in the east wing of the church office building. Floor control valve assemblies already exist and we are attaching to them and running the sprinkler system out. ![]() ![]() Permit type: Fire | Permit status: Pass | Completion date: May 29, 2014 | Current use: Commercial | Permit id: Bld2013-06275 | |||||
SCORE 66 Plumbing remodel ![]() Permit type: Plumbing | Permit status: Pass | Completion date: March 24, 2014 | Current use: Commercial | Permit id: Bld2013-06648 | |||||
SCORE 79 Fire sprinklers (clean agent) ![]() ![]() Permit type: Fire | Permit status: Pass | Completion date: August 7, 2014 | Current use: Commercial | Permit id: Bld2014-02688 | |||||
SCORE 79 Low voltage alarm (clean agent) ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: August 7, 2014 | Current use: Commercial | Permit id: Bld2014-02698 | |||||
SCORE 59 Complete interior remodel of the 23rd floor of the lds church office building. Non-structural. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907. 3. Add new ada compliant single-user restroom. Replace existing drinking fountains with new ada compliant electric water coolers. ![]() Permit status: Pass | Completion date: February 12, 2015 | Current use: Commercial | Permit id: Bld2014-04780 | |||||
SCORE 66 Fire sprinklers for the 23rd floor ![]() Permit type: Fire | Permit status: Pass | Completion date: January 23, 2015 | Current use: Commercial | Permit id: Bld2014-06879 | |||||
SCORE 66 Remodel of the 23rd floor at the church office building ![]() Permit type: Plumbing | Permit status: Pass | Completion date: February 3, 2015 | Current use: Commercial | Permit id: Bld2014-07790 | |||||
SCORE 66 Elec work for tenant improvement on 24th floor of lds church office building big-d general permit #bld2014-06620 ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: April 3, 2015 | Current use: Commercial | Permit id: Bld2014-08943 | |||||
SCORE 66 Fire sprinkler system ![]() Permit type: Fire | Permit status: Completed | Completion date: December 22, 2014 | Current use: Commercial | Permit id: Bld2014-08834 | |||||
SCORE 59 Complete interior remodel of the 24th floor of the lds church office building. Non-structural. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907. 3. Add new ada compliant single-user restroom. Replace existing drinking fountains with new ada compliant electric water coolers. ![]() Permit status: Pass | Completion date: November 20, 2014 | Current use: Commercial | Permit id: Bld2014-06620 | |||||
SCORE 66 Tenant improvement of 23rd floor gc permit big-d bld2014-04780 ![]() Permit type: Electrical | Permit status: Pass | Completion date: February 2, 2015 | Current use: Commercial | Permit id: Bld2014-07022 |