Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 We will prepare the existing roof to receive the new system by removing the existing epdm membrane. We will be installing tapered foam crickets around the outside between drains and a 1/4" hard board will be installed. We will be installing a light grey s-327 mil pvc single-ply membrane, manufactured by sarnafil. This system will be attached using rhino bond adhered mechanically fastening system. ![]() Permit type: Roofing | Permit status: Pass | Completion date: May 13, 2014 | Current use: Commercial | Permit id: Bld2014-02647 | |||||
SCORE 64 Replace existing ups system ![]() Permit type: Electrical | Permit status: Pass | Completion date: August 25, 2014 | Current use: Commercial | Permit id: Bld2014-04922 | |||||
Splits are charged for both heating and cooling. Install 1. 5 ton unitary split system ![]() Permit type: Mechanical | Permit status: Pass | Completion date: August 25, 2014 | Current use: Commercial | Permit id: Bld2014-05135 | |||||
SCORE 64 Remodel of entire floor. Use all new equipment and tie to existing transponder in electrical room. Mount new nac panel in closet located in store room 2301 to run strobe circuits, run speaker circuits to the existing transponder. Damper shutdown relays are to be located in each of the electrical rooms. The east electrical room will close the east dampers and the west electrical room will close the west dampers. Duct detectors will be mounted within 5 of each damper. The initiating circuit will run back to the existing transponder, the circuit is m9. Won-door controller is located in the east electrical room and connect to the transponder from there. ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: February 10, 2015 | Current use: Commercial | Permit id: Bld2014-06524 | |||||
Hvac remodel of 23 floor ![]() Permit type: Mechanical | Permit status: Pass | Completion date: February 12, 2015 | Current use: Commercial | Permit id: Bld2014-07147 | |||||
SCORE 64 This is a complete remodel of the 24th floor of the church office building. A new nac panel will be installed to control the new strobes and the existing speaker circuit will be used to run the new speakers. New duct detectors will be installed as well as all equipment that makes up the fire alarm for this floor. ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: March 31, 2015 | Current use: Commercial | Permit id: Bld2014-08454 | |||||
SCORE 64 Project is to add notification appliances in the corridors of the annex and sl temple structures. ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: February 11, 2015 | Current use: Commercial | Permit id: Bld2014-09340 | |||||
SCORE 64 1-lav, 1-water closet, 1-drain bathroom remodel ![]() ![]() Permit type: Plumbing | Permit status: Pass | Completion date: April 16, 2015 | Current use: Commercial | Permit id: Bld2014-09371 | |||||
SCORE 100 Interior remodel ![]() ![]() Permit type: Permit | Permit status: Pass | Completion date: February 23, 2015 | Current use: Commercial | Permit id: Bld2014-09469 | |||||
Remodel the 24th floor of the church office building ![]() Permit type: Mechanical | Permit status: Completed | Completion date: January 7, 2015 | Current use: Commercial | Permit id: Bld2015-00101 | |||||
Plan review approved for permit issuance. Please arrange to pay the balance due. Fire suppression ![]() Permit type: Fire | Permit status: Completed | Completion date: February 10, 2015 | Current use: Commercial | Permit id: Bld2015-00441 | |||||
Low voltage ![]() Permit type: Fire | Permit status: Pass | Completion date: March 17, 2015 | Current use: Commercial | Permit id: Bld2015-00740 | |||||
SCORE 64 Install ahu, coils, pumps, and fan coil units ![]() Permit type: Mechanical | Permit status: Pass | Completion date: March 31, 2014 | Current use: Commercial | Permit id: Bld2013-07968 | |||||
SCORE 64 Remodel of the east wing of the church office building. Floors include levels 4, 3, 2, 1, ll1, ll2, and ll3. Floors 1, ll1, ll2, and ll3 will connect to the ll1 east transponder. Floors 4, 3, and 2 will connect to the 3rd floor east transponder. ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: March 28, 2014 | Current use: Commercial | Permit id: Bld2013-07805 | |||||
SCORE 64 Hvac sheet metal ![]() ![]() Permit type: Mechanical | Permit status: Pass | Completion date: May 29, 2014 | Current use: Commercial | Permit id: Bld2013-07691 | |||||
SCORE 64 Detection for rooms to be added to existing preaction system. ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: August 2, 2013 | Current use: Commercial | Permit id: Bld2013-04502 | |||||
Lds church intends to remodel the three main stairwells to the church office building tower: center stairwell, north east stairwell and north west stairwell. This is a voluntary seismic upgrade including an aesthetic refresh to the finish materials in the stairwells. Scope of work includes the main level up to the 28th and 29th floors. No work in the lower parking stairwells will be completed. No work in the east wing or west wing stairwells will be completed at this time. Intent is for the construction of this project to be phased. A detailed description of the construction phasing is included within the the design criteria. ![]() Permit type: Permit | Permit status: Completed | Completion date: August 7, 2014 | Current use: Commercial | Permit id: Bld2013-01195 | |||||
Renovation of the existing cafeteria & dining areas to include renovated salad bar area and soup bar; also upgrading floor & wall finishes. ![]() Permit type: Permit | Permit status: Pass | Completion date: August 2, 2013 | Current use: Commercial | Permit id: Bld2013-00978 | |||||
SCORE 64 Various piping for new fixtures at church office bldg. ![]() ![]() Permit type: Plumbing | Permit status: Pass | Completion date: March 4, 2013 | Current use: Commercial | Permit id: Bld2013-00076 | |||||
SCORE 64 Fire alarm for 14th remodel ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: March 8, 2013 | Current use: Commercial | Permit id: Bld2012-08988 | |||||
Installing an addressable system in the temple proper and annex bldg. Devices will be replaced 1 for 1 in 95% of the building. This will not be a full upgrade at this time, but will accomodate for coverage based on the existing system. ![]() Permit type: Low voltage | Permit status: Pass | Completion date: February 25, 2013 | Current use: Commercial | Permit id: Bld2012-05726 | |||||
SCORE 77 Fire sprinkler system. Module 3 ![]() ![]() Permit type: Fire | Permit status: Pass | Completion date: February 3, 2012 | Current use: Commercial | Permit id: Bld2012-00667 | |||||
SCORE 64 Electrical rough in for door modifications ![]() Permit type: Electrical | Permit status: Accepted | Completion date: November 14, 2011 | Current use: Commercial | Permit id: Bld2011-07479 | |||||
SCORE 86 Temp structure, annual church function ![]() ![]() Permit type: Temporary use | Permit status: Completed | Completion date: October 6, 2011 | Permit id: Bld2011-06453 | |||||
SCORE 64 Fire door and overhead door upgrades ![]() ![]() Permit type: Permit | Permit status: Pass | Completion date: February 9, 2012 | Current use: Commercial | Permit id: Bld2011-06201 | |||||
SCORE 77 Fire sprinkler system. Module 3 ![]() ![]() Permit type: Fire | Permit status: Pass | Completion date: August 13, 2012 | Current use: Commercial | Permit id: Bld2011-05147 | |||||
Site modifications for the placement of bollards on private property 07/12/2011 ![]() Permit type: Permit | Permit status: Pass | Completion date: March 15, 2013 | Current use: Commercial | Permit id: Bld2011-04263 | |||||
SCORE 64 Interior space finished out requires pendent heads to be dropped to protect new space and ceiling layout. (existing heads are pendent style and are located in 1" outlets using bushings) ![]() Permit type: Fire | Permit status: Completed | Completion date: March 21, 2011 | Current use: Commercial | Permit id: Bld2011-00623 | |||||
Fire sprinkler system. Food court block 75 building 4 ![]() Permit type: Low voltage | Permit status: Completed | Completion date: March 9, 2011 | Current use: Commercial | Permit id: Bld2011-00487 | |||||
Replacing existing hollow / metal doors and frames and add 2 coiling doors. Door types, sizes and harware remains the same. (maintenance replacement) g. S. D-1 zone, interior to doors. A. S. ![]() Permit type: Permit | Permit status: Pass | Completion date: September 17, 2010 | Current use: Commercial | Permit id: Bld2010-04368 | |||||
SCORE 59 Non-structural remodel converting portions of existing cafeteria seating area, office area, and storage room into a new health unit ![]() Permit status: Closed | Completion date: December 17, 2015 | Current use: Commercial | Permit id: Bld2015-05914 | |||||
SCORE 59 Lds church intends to remodel the three main stairwells to the church office building tower: center stairwell, north east stairwell and north west stairwell. This is a voluntary seismic upgrade including an aesthetic refresh to the finish materials in the stairwells. Scope of work includes the main level up to the 28th and 29th floors. No work in the lower parking stairwells will be completed. No work in the east wing or west wing stairwells will be completed at this time. Intent is for the construction of this project to be phased. A detailed description of the construction phasing is included within the the design criteria. ![]() Permit status: Inspections | Completion date: December 31, 2015 | Current use: Commercial | Permit id: Bld2013-01195 | |||||
SCORE 79 Fire sprinklers (clean agent) ![]() ![]() Permit type: Fire | Permit status: Pass | Completion date: August 7, 2014 | Current use: Commercial | Permit id: Bld2014-02688 | |||||
SCORE 79 Low voltage alarm (clean agent) ![]() ![]() Permit type: Low voltage | Permit status: Pass | Completion date: August 7, 2014 | Current use: Commercial | Permit id: Bld2014-02698 | |||||
Complete interior remodel of the 23rd floor of the lds church office building. Non-structural. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907. 3. Add new ada compliant single-user restroom. Replace existing drinking fountains with new ada compliant electric water coolers. ![]() Permit type: Permit | Permit status: Pass | Completion date: February 12, 2015 | Current use: Commercial | Permit id: Bld2014-04780 | |||||
SCORE 66 Fire sprinklers for the 23rd floor ![]() Permit type: Fire | Permit status: Pass | Completion date: January 23, 2015 | Current use: Commercial | Permit id: Bld2014-06879 | |||||
SCORE 66 Remodel of the 23rd floor at the church office building ![]() Permit type: Plumbing | Permit status: Pass | Completion date: February 3, 2015 | Current use: Commercial | Permit id: Bld2014-07790 | |||||
Complete interior remodel of the 24th floor of the lds church office building. Non-structural. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907. 3. Add new ada compliant single-user restroom. Replace existing drinking fountains with new ada compliant electric water coolers. ![]() Permit type: Permit | Permit status: Pass | Completion date: November 20, 2014 | Current use: Commercial | Permit id: Bld2014-06620 | |||||
SCORE 66 Fire sprinkler system ![]() Permit type: Fire | Permit status: Completed | Completion date: December 22, 2014 | Current use: Commercial | Permit id: Bld2014-08834 | |||||
SCORE 66 Elec work for tenant improvement on 24th floor of lds church office building big-d general permit #bld2014-06620 ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: April 3, 2015 | Current use: Commercial | Permit id: Bld2014-08943 | |||||
SCORE 66 Tenant improvement of 23rd floor gc permit big-d bld2014-04780 ![]() Permit type: Electrical | Permit status: Pass | Completion date: February 2, 2015 | Current use: Commercial | Permit id: Bld2014-07022 | |||||
SCORE 66 Plumbing remodel ![]() Permit type: Plumbing | Permit status: Pass | Completion date: March 24, 2014 | Current use: Commercial | Permit id: Bld2013-06648 | |||||
SCORE 66 Adding sprinklers to levels 1-4 in the east wing of the church office building. Floor control valve assemblies already exist and we are attaching to them and running the sprinkler system out. ![]() ![]() Permit type: Fire | Permit status: Pass | Completion date: May 29, 2014 | Current use: Commercial | Permit id: Bld2013-06275 | |||||
SCORE 66 Church office building east wing remodel of 4 floors ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: March 28, 2014 | Current use: Commercial | Permit id: Bld2013-06002 | |||||
Int tenant improvement, mech/elec/plmbg permits reqd k. A. Int remodel only a. H. D. W. ![]() Permit type: Permit | Permit status: Pass | Completion date: May 30, 2014 | Current use: Commercial | Permit id: Bld2013-04165 | |||||
SCORE 66 Fire sprinklers nob publishing services ![]() Permit type: Fire | Permit status: Pass | Completion date: August 2, 2013 | Current use: Commercial | Permit id: Bld2013-03533 | |||||
Lds church office building - 14th floor vault & vault ante room fm-2 fire suppression system with controls for pre-action fire sprinkler system (pre-action sprinkler system is furnished and installed by others) ![]() Permit type: Fire | Permit status: Pass | Completion date: March 8, 2013 | Current use: Commercial | Permit id: Bld2013-00771 | |||||
Replacement of duct work and terminal units entire floor ![]() Permit type: Mechanical | Permit status: Accepted | Completion date: December 28, 2012 | Current use: Commercial | Permit id: Bld2012-09350 | |||||
SCORE 66 Interior remodel of the church office building 14th floor. Gc permit #bld2012-07762 ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: March 8, 2013 | Current use: Commercial | Permit id: Bld2012-09321 | |||||
14th floor to receive fire sprinkler system. We will begin our work after the control valve and flow switch that is currently installed. ![]() Permit type: Fire | Permit status: Completed | Completion date: December 27, 2012 | Current use: Commercial | Permit id: Bld2012-09111 | |||||
Interior remodel of 14th floor d. D. A. H. D. W. ![]() Permit type: Permit | Permit status: Pass | Completion date: March 8, 2013 | Current use: Commercial | Permit id: Bld2012-07762 | |||||
SCORE 66 Interior non-structural demolition, fire proofing will be included in the scope of this permit d. D. A. H. ![]() Permit type: Permit | Permit status: In progress | Completion date: October 19, 2012 | Current use: Commercial | Permit id: Bld2012-07761 | |||||
SCORE 66 Ductwork / misc. Work for 13th floor interior remodel ![]() Permit type: Mechanical | Permit status: Completed | Completion date: January 11, 2011 | Current use: Commercial | Permit id: Bld2010-06108 | |||||
Low voltage fire alarm system. ![]() Permit type: Low voltage | Permit status: Pass | Completion date: March 31, 2011 | Current use: Commercial | Permit id: Bld2010-05778 | |||||
Fire alarm system for the 13th floor interior remodel. ![]() Permit type: Fire | Permit status: Completed | Completion date: May 17, 2011 | Current use: Commercial | Permit id: Bld2010-05777 | |||||
SCORE 66 13th floor interior remodel. Fixture grand total 2, grand total of fixture units 5 and 1 floor drains. ![]() Permit type: Plumbing | Permit status: No certificate req | Completion date: January 11, 2011 | Current use: Commercial | Permit id: Bld2010-05451 | |||||
Elec work for 13th flr remodel ![]() Permit type: Electrical | Permit status: Completed | Completion date: January 11, 2011 | Current use: Commercial | Permit id: Bld2010-05084 | |||||
SCORE 66 Fire sprinkler modifications for 13th floor interior remodel. ![]() Permit type: Fire | Permit status: No certificate req | Completion date: January 11, 2011 | Current use: Commercial | Permit id: Bld2010-05000 | |||||
Install 36 vav/fan coil units for interior remodel - 13th ![]() Permit type: Mechanical | Permit status: Pass | Completion date: April 1, 2013 | Current use: Commercial | Permit id: Bld2010-04976 | |||||
Elec work for cob fire door project ![]() Permit type: Electrical | Permit status: Pass | Completion date: September 16, 2010 | Current use: Commercial | Permit id: Bld2010-04658 | |||||
SCORE 66 Interior only, non structural demo of office space. No new work excepet capping off elec, mech, & plmb. Drawings are for reference only, new work will be submitted in 4-6 weeks. Tmb ah 05/19/2010 ![]() Permit type: Permit | Permit status: Pass | Completion date: April 1, 2013 | Current use: Commercial | Permit id: Bld2010-03251 |