Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 Provide demolition and remodel of the fill plant at the us welding facility to include installation of a boiler, unit heaters, heat pumps and mechanical room work. 1 furnace, 8 unit heaters, ductwork, 2 boilers, 3 evap coolers, gaslines, exhaust fan, and heat pump. Construction activities may not commence until bld2016-011 has been issued. ![]() ![]() Permit type: Mechanical | Permit status: Inspections | Completion date: February 16, 2016 | Current use: Commercial | Permit id: Bld2016-01184 | |||||
SCORE 59 Install water heater, dist piping, and water lines. Construction activities may not commence until bld2016-011 has been issued. ![]() ![]() Permit type: Plumbing | Permit status: Inspections | Completion date: February 16, 2016 | Current use: Commercial | Permit id: Bld2016-01180 | |||||
SCORE 56 Manual fire alarm system. Using a fike cheetah xi- panel to perform building fire alarm, preaction and fm-2 detection and control functions. ![]() ![]() Permit type: Low voltage | Permit status: Inspections | Completion date: May 20, 2016 | Current use: Commercial | Permit id: Bld2016-03676 | |||||
SCORE 61 Fm 2 system including pre-action detection and control ![]() ![]() Permit type: Fire | Permit status: Inspections | Completion date: February 25, 2016 | Current use: Commercial | Permit id: Bld2015-09337 | |||||
SCORE 64 Removing a portion of the existing fire sprinkler system. Installing a new double interlock pre-action system throughout the area and re-connecting the existing. ![]() ![]() Permit type: Fire | Permit status: Completed | Completion date: July 21, 2015 | Current use: Commercial | Permit id: Bld2015-05228 | |||||
SCORE 64 Wall repair: to remove and save the coping cap metal. To remove and dispose of the loose or damaged wall flashing. To install new asphalt wall flashings where the damaged wall flashings were removed. To install new asphalt wall flashings up and over the parapet walls. To re-install the coping cap metal. To touch-up and repair any defects on the roof top curbs. Northeast and northwest corners: 6,856. Entire perimeter: 13,560. To remove and dispose of the loose pea gravel. To remove and save the existing coping cap metal. To install a 1 2" dens deck cover board. To install a mil xt kee fibertite membrane. To mechanically attach to the structural deck. To re-install the existing coping cap metal. A 15 year manufacturers warranty on labor and materials. A 15 year manufacturers warranty on labor and materials. ![]() ![]() Permit type: Roofing | Permit status: Completed | Completion date: May 13, 2013 | Current use: Commercial | Permit id: Bld2013-03017 | |||||
SCORE 86 Temp power to north adjacent vacant lot. ![]() ![]() Permit type: Electrical | Permit status: Reviews not require | Completion date: May 11, 2015 | Current use: Commercial | Permit id: Bld2015-03295 | |||||
SCORE 59 Interior remodel ![]() ![]() Permit status: Inspections | Completion date: March 18, 2016 | Current use: Commercial | Permit id: Bld2015-11042 | |||||
SCORE 59 Elect for remodel ![]() ![]() Permit type: Electrical | Permit status: Inspections | Completion date: March 30, 2016 | Current use: Commercial | Permit id: Bld2016-02929 | |||||
SCORE 59 Electrical work ![]() ![]() Permit type: Electrical | Permit status: Inspections | Completion date: May 13, 2016 | Current use: Commercial | Permit id: Bld2016-04609 |