Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd ( no meter upgrade) 8/28/14-plan change-msp relocation-see coa-lv 08-21-2014 plan change to remove new 125a msp. Existing according to applicant. Maz the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 20, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 5, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 74 Roof mount residential solar pv for existing sfd (hra: no meter upgrade) 8 28 14-plan change-msp relocation-see coa-lv 08-21-2014: plan change to remove new 125a msp. Existing according to applicant. Maz the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 20, 2014 Contractor: Vincent Basil Balian Permit type: Residential alteration-addn | Permit status: Permit finaled | Completion date: September 5, 2014 | Permit id: Pds2014-Resalt- | |||||
Final Date: September 4, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- |