Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Plumbing Date: March 9, 2012 Contractor: Russell Holland Permit status: Permit finaled | Current use: Commercial | Permit id: 10042-10002-222 | |||||
SCORE 100 Convert roof to a-2 occupancy, extend 2 stairs from 9th floor to roof, Permit type: Bldg-addition | Permit status: Cofo issued | Current use: Commercial | Permit id: 10014-10000-023 | |||||
Replacement of partial a/c system serving basement through 3rd floor. Date: March 15, 2011 Permit type: Hvac | Permit status: Permit finaled | Current use: Commercial | Permit id: 11044-10000-006 | |||||
SCORE 87 Electrical Date: November 18, 2010 Contractor: Les Hajnal Permit status: Permit expired | Current use: Public safety only | Permit id: 08041-30001-270 | |||||
Replace exiting chiiler/cooling tower with new air cooled chiller, and Date: August 25, 2010 Permit type: Hvac | Permit status: Permit finaled | Current use: Commercial | Permit id: 10044-10000-080 | |||||
Install (3) new water curtain fire sprinklers in elevator machinery ro Date: June 4, 2012 Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 12043-10000-017 | |||||
SCORE 97 New swimming on the roof deck of the hotel per engineers Permit type: Swimming-pool/spa | Permit status: Permit finaled | Current use: Commercial | Permit id: 12047-10000-007 | |||||
Fire sprinkler Date: November 21, 2012 Permit status: Permit finaled | Current use: Apartment | Permit id: 12043-10000-038 | |||||
Elevator Date: June 9, 2010 Permit status: Permit finaled | Current use: Commercial | Permit id: 10046-10000-006 | |||||
Elevator Date: July 28, 2011 Permit status: Permit finaled | Current use: Commercial | Permit id: 11046-20000-009 | |||||
Plan check for swimming pool. Date: July 16, 2012 Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 12042-10000-128 | |||||
SCORE 100 T. I. Existing historical high rise building. Ti to be done on the ro Date: February 17, 2012 Contractor: Amos Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-095 | |||||
SCORE 97 Electrical Date: July 23, 2012 Contractor: Brad Permit status: Permit finaled | Current use: Commercial | Permit id: 12041-10000-170 | |||||
SCORE 96 Fire sprinkler Date: March 13, 2012 Contractor: Behzad Permit status: Permit finaled | Current use: Commercial | Permit id: 12043-10000-007 | |||||
Add (16) new fire sprinklers below new bridge at roof of a 9-story bui Date: March 13, 2012 Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 12043-10000-007 | |||||
Install fire sprinkler system. Add 3 heads. Water curtain. 9th floor. Date: March 20, 2012 Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 12043-10000-008 | |||||
SCORE 100 Existing 9-story pluss penthouse (embassy) hotel. Plan check for potab Date: November 1, 2011 Contractor: Russell Holland Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 10042-10000-222 | |||||
Ti to install fifteen (15) sprinkler heads in the roof penthouse floor Date: November 26, 2012 Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 12043-10001-017 | |||||
SCORE 87 Fire alarm replacement for an exisitng high rise hotel. Date: November 10, 2010 Contractor: Les Hajnal Permit type: Electrical | Permit status: Permit finaled | Current use: Public safety only | Permit id: 08041-10000-270 | |||||
New service and distribution network for air conditioning in a high-ri Date: October 16, 2013 Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-122 | |||||
SCORE 100 Eliminate proposed elevator to roof and use existing elevator to roof. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 10014-10003-023 | |||||
Install ventilation system for dwp vault. Date: September 12, 2013 Permit type: Hvac | Permit status: Permit finaled | Current use: Commercial | Permit id: 13044-10000-096 | |||||
Addition of 6 sprinkler heads to the restrroms located on the roof. Date: March 20, 2014 Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-009 | |||||
SCORE 100 New conc block room enclosure for dwp vault and elect panel rooms in e Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13016-10000-084 | |||||
Electrical Date: July 21, 2014 Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-194 | |||||
Fire sprinkler Date: February 5, 2013 Permit status: Permit finaled | Current use: Commercial | Permit id: 13043-10000-003 | |||||
SCORE 93 New service and distribution network for air conditioning in a high-ri Date: October 16, 2013 Contractor: Miyara Electrical Inc Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-122 | |||||
SCORE 99 Install ventilation system for dwp vault. Date: September 12, 2013 Contractor: Precise Air Systems Inc Permit type: Hvac | Permit status: Permit finaled | Current use: Commercial | Permit id: 13044-10000-096 | |||||
SCORE 93 Addition of 6 sprinkler heads to the restrroms located on the roof. Date: March 20, 2014 Contractor: Fire Protection And Life Safety Inc Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-009 | |||||
SCORE 93 Electrical Date: July 21, 2014 Contractor: Miyara Electrical Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-194 | |||||
SCORE 93 Fire sprinkler Date: February 5, 2013 Contractor: Fire Protection And Life Safety Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 13043-10000-003 | |||||
SCORE 98 Date: December 8, 2017 Contractor: Kevin Permit status: Issued | Current use: Commercial | Permit id: 17046-20000-025 | |||||
SCORE 93 Date: December 8, 2017 Contractor: T R E Elevator Corp Permit status: Issued | Current use: Commercial | Permit id: 17046-20000-025 | |||||
SCORE 100 1>reconfigue on grade ada access & relocate one exit entry door 2>cha Permit status: Issued | Current use: Commercial | Permit id: 15016-10001-151 | |||||
SCORE 93 Date: July 13, 2017 Contractor: Reabak Hanan Licensed Electrical Contractor Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 17041-30000-236 | |||||
SCORE 71 Date: May 4, 2017 Contractor: Kevin Prado Permit status: Issued | Current use: Commercial | Permit id: 17046-20000-008 | |||||
SCORE 93 Date: July 21, 2014 Contractor: Miyara Electrical Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-194 | |||||
SCORE 93 Date: February 5, 2013 Contractor: Fire Protection And Life Safety Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 13043-10000-003 | |||||
SCORE 100 Date: April 26, 2017 Contractor: Edwin Rostomian Permit status: Permit finaled | Current use: Commercial | Permit id: 17042-10000-093 | |||||
SCORE 87 Date: June 5, 2017 Contractor: Henrik Babakhani Permit status: Issued | Current use: Commercial | Permit id: 17041-10000-186 | |||||
SCORE 100 2 new exterior elevators & one interior elevator equipment room at bas Permit status: Issued | Current use: Commercial | Permit id: 15016-10000-151 | |||||
SCORE 65 Remove & recompaction < Permit status: Issued | Current use: Commercial | Permit id: 17030-10000-006 | |||||
SCORE 93 New service and distribution network for air conditioning in a high-ri Date: October 16, 2013 Contractor: Miyara Electrical Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-122 | |||||
SCORE 100 Installation of one type i hood on 10th floor Date: February 28, 2017 Contractor: Russell Holland Permit status: Issued | Current use: Commercial | Permit id: 17044-10000-018 | |||||
SCORE 100 Eliminate proposed elevator to roof and use existing elevator to roof. Permit status: Permit finaled | Current use: Commercial | Permit id: 10014-10003-023 | |||||
SCORE 99 Install ventilation system for dwp vault. Date: September 12, 2013 Contractor: Precise Air Systems Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 13044-10000-096 | |||||
SCORE 99 Date: April 24, 2017 Contractor: Nicole Permit status: Issued | Current use: Apartment | Permit id: 17046-20000-007 | |||||
SCORE 93 Addition of 6 sprinkler heads to the restrroms located on the roof. Date: March 20, 2014 Contractor: Fire Protection And Life Safety Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-009 | |||||
SCORE 100 New conc block room enclosure for dwp vault and elect panel rooms in e Permit status: Permit finaled | Current use: Commercial | Permit id: 13016-10000-084 | |||||
SCORE 100 Construction of a bar and a kitchen at the enclosed a-2 occupancy area Permit status: Issued | Current use: Commercial | Permit id: 16016-10000-312 |