SCORE 91 Install electric hook-up for qwest service box. Date: October 20, 2000 Contractor: City Electric Co Of Boulder Applicant: City Electric Co Of Boulder | Permit type: Electrical | Permit status: Cmp | Completion date: March 20, 2001 | Current use: Telecommunicati | |||||
SCORE 91 Install electric hook-up for qwest service box. Permit type: Electrical | Permit status: Cmp | Completion date: March 20, 2001 | Current use: Telecommunications, existing | Permit id: Pmt2000-04339 | |||||
SCORE 99 Tenant finish for ctx mortgage (first floor). Client: Walnut Canyon Partners Llc | Applicant: Ccm Construction Management Inc | Permit type: Building, electrical | Permit status: Co | Current use: Financial insti | |||||
SCORE 99 Installation of louvered vents on elevator shafts. Date: October 5, 2005 Contractor: Hb Electric Client: Canyon Walnut | Applicant: Hb Electric (hank Brothers) | Permit type: Electrical | Permit status: Cmp | Completion date: February 14, 2006 | Current use: Office - profes | |||||
SCORE 72 Remove trees, tree grates and r r sidewalk, curb and gutter. Date: June 29, 2004 Contractor: Burlstone Inc Client: Transporta Regional | Applicant: Burlstone, Inc. | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Tenant remodel on 4th floor Client: Financial Atlantic | Applicant: Deneuve Construction Services | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 31, 2003 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel including installation of new, non-structural interior partions and the addition of one office. Client: Canyon Walnut | Applicant: Deneuve Construction Services | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 9, 2003 | Current use: Office - profes | |||||
SCORE 73 Tenant finish to include partial first floor, entire 2nd floor. Interior demolition permit pmt2001-04236 Client: Walnut Canyon Partners Llc | Applicant: Max Construction, Inc. | Permit type: Building, electrical | Permit status: Co | Current use: Office - profes | |||||
SCORE 95 Install new submersible power unit one one existing passenger elevator in the rtd bus terminal. Date: December 12, 2002 Contractor: Thyssenkrupp Elevator Client: Transporta Regional | Applicant: Thyssenkrupp Elevator | Permit type: Elevator | Permit status: N&v | Current use: Government uses | |||||
SCORE 98 Fire alarm - 1st and 2nd floor Date: February 19, 2002 Contractor: A D K Electric Corporation Client: Walnut Canyon Partners Llc | Applicant: A D K Electric Corporation | Permit type: Fire | Permit status: Cmp | Completion date: February 25, 2002 | Current use: Office - profes | |||||
SCORE 89 Tenant finish for 3rd and 4th floor in core and shell building. Client: Canyon Walnut | Applicant: Deneuve Construction | Permit type: Building, electrical | Permit status: Co | Current use: Office - admini | |||||
SCORE 100 Installation of additional catwalk in attic space to provide access to existing hvac equipment. Client: Transporta Regional | Applicant: Blu Sky Restoration Contractors Inc | Permit type: Building | Permit status: Cmp | Completion date: March 16, 2011 | Current use: Office - admini | |||||
SCORE 66 Rtde renovate two existing public bathrooms with new wall finishes and fixtures Client: Transporta Regional | Applicant: Transporta Regional | Permit type: Building, electrical | Permit status: N&v | Current use: Government uses | |||||
SCORE 91 Removal of an existing sign, re-face with "wr starkey" & reinstall. Need row licensed contractor listed on permit before issuance. Date: June 17, 2008 Contractor: Colorado Sign Helpers Client: Canyon Walnut | Applicant: Colorado Sign Helpers | Permit type: Sign | Permit status: N&v | Current use: Financial insti | |||||
SCORE 92 Renovation of 2 restrooms -- one mens restroom & one ladies restroom on the main floor of the rtd terminal. No new fixtures. No mechanical under scope of this permit. Client: Transporta Regional | Applicant: Barth Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 17, 2008 | Current use: Government uses | |||||
SCORE 95 Sign permit - for replacement wall sign (non-electric) on commercial building for inchswbc mortgageinch. Date: March 21, 2011 Contractor: Signdealz Corp Client: Canyon Walnut | Applicant: Signdealz Corp | Permit type: Sign | Permit status: Cmp | Completion date: January 6, 2015 | Current use: Financial insti | |||||
SCORE 95 Tenant remodel of 40 square feet in suite 4 for grey mountain office. To include new lighting and mechanical upgrades. Client: Canyon Walnut | Applicant: C C M Construction Management | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 10, 2011 | Current use: Office - profes | |||||
SCORE 95 New 1 amp feeder for a ups installation. Date: April 4, 2011 Contractor: Southpaw Electric Co Client: Canyon Walnut | Applicant: Southpaw Electric Co. | Permit type: Electrical | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Office - admini | |||||
SCORE 95 Remodel of approximately 32 sf portion of a 13,237 sf suite on third floor -- demolition of interior walls, removal of a locker room bathroom area (two water closets, four showers and four lavatories) reconfigure walls to create offices and administrtive areas. Includes associated mechanical (relocate ductwork and reconfigure diffusers) and electrical. Client: Canyon Walnut | Applicant: C C M Construction Management | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 25, 2012 | Current use: Office - profes | |||||
SCORE 95 Demolition of interior partition walls and a restroom area w showers (four showers, two water closets, and four sinks) removal of interior finishes. Tenant remodel by separate permit. Date: April 7, 2011 Contractor: C C M Construction Management Client: Canyon Walnut | Applicant: C C M Construction Management | Permit type: Demolition | Permit status: Cmp | Completion date: December 10, 2012 | Current use: Office - profes | |||||
SCORE 100 Tennant finish fire alarm for faegre & benson Date: May 26, 2011 Contractor: Freedom Fire Protection Llc Client: Canyon Walnut | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Tennant finish sprinkler grey walnut Date: October 26, 2011 Contractor: Freedom Fire Protection. Llc Client: Canyon Walnut | Applicant: Freedom Fire Protection. Llc | Permit type: Fire | Permit status: Cmp | Completion date: November 10, 2011 | Current use: Office - profes | |||||
SCORE 60 Suite 201 -- tenant remodel of 2,6 sf to create professional offices, meeting rooms and reception areas. Relocate existing breakroom kitchen and add additional breakroom w kitchen. Client: Canyon Walnut | Applicant: Christopher Herr | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 8, 2013 | Current use: Office - profes | |||||
SCORE 99 Suite 201 -- interior non-structural demolition in preparation of work performed under pmt2012-04686 Date: September 26, 2012 Contractor: Ccm Construction Management Inc Client: Canyon Walnut | Applicant: Ccm Construction Management Inc | Permit type: Demolition | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Fa - sowl - add 1 h s new hall, add 1 strobe conference room, relocate 2 strobes for hallways. Date: January 15, 2013 Contractor: First Call Electric And Fire Inc Client: Canyon Walnut | Applicant: First Call Electric & Fire, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 95 Fs - tf - 2nd floor Date: January 28, 2013 Contractor: Freedom Fire Protection. Llc Client: Canyon Walnut | Applicant: Freedom Fire Protection. Llc | Permit type: Fire | Permit status: Cmp | Completion date: March 18, 2013 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel of a 7 sf portion of a 2,478 suite in the ne corner of the 2nd floor. (suite number unknown) demolition of interior walls, create a breakroom, minor alteration reconfiguration of hvac ductwork, includes associated electrical and plumbing. Client: Canyon Walnut | Applicant: C C M Construction Management | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 19, 2013 | Current use: Office - profes | |||||
SCORE 99 Interior only demolition permit for interior finishes and non-structural elements. Tenant finish under pmt2013-00415. Date: January 31, 2013 Contractor: Ccm Construction Management Inc Client: Canyon Walnut | Applicant: Ccm Construction Management Inc | Permit type: Demolition | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Fs - tf light hazard Date: February 26, 2013 Contractor: Freedom Fire Protection. Llc Client: Canyon Walnut | Applicant: Freedom Fire Protection. Llc | Permit type: Fire | Permit status: Cmp | Completion date: April 25, 2013 | Current use: Office - profes | |||||
SCORE 99 Interior, non-structural demolition. Date: March 28, 2013 Contractor: Ccm Construction Management Inc Client: Canyon Walnut | Applicant: Ccm Construction Management Inc | Permit type: Demolition | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Office - admini | |||||
SCORE 98 Electrical permit for extension of existing circuit in parking garage for new equipment. Date: April 10, 2013 Contractor: Mckusker Electric Client: Transporta Regional | Applicant: Mckusker Electric | Permit type: Electrical | Permit status: Iss | Current use: Parking garage, | |||||
SCORE 99 Suite102. Demolition and relocation of non-load bearing walls and associated ceiling work, floor and wall finishes and doors. Structural is not part of scope. Mechanical scope to include relocation of diffusers per revised space plan. Plumbing is not part of scope. Vertical grab bars to be added in first floor restroom. Client: Canyon Walnut | Applicant: Ccm Construction Management Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 31, 2013 | Current use: Office - profes | |||||
SCORE 99 Suite 202 -- (kurtz fargo) tenant remodel of approximately 9 sf to install non-loadbearing walls to create offices, breakroom and reception area. Includes associated electrical (relocated lights, outlets and switches) and mechanical (relocate diffusers and ductwork) no plumbing Client: Canyon Walnut | Applicant: Ccm Construction Management Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 15, 2013 | Current use: Office - profes | |||||
SCORE 100 Fs - sowl - inchall work to be performed shall be on the first floor and consist of relocating 2 pendent sprinklers in office 118 and relocating 2 more sprinkler in office 120inch Date: June 24, 2013 Contractor: Freedom Fire Protection Llc Client: Canyon Walnut | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 100 Fs - sowl - inchrelocate a total of 6 pendent sprinklers offices #246, 244, 243 and 262. Inch Date: August 13, 2013 Contractor: Freedom Fire Protection Llc Client: Canyon Walnut | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Cmp | Completion date: October 22, 2013 | Current use: Office - admini | |||||
SCORE 99 Tenant remodel of 1st floor east space for offices for webfilings. Client: Canyon Walnut | Applicant: Ccm Construction Management Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 4, 2014 | Current use: Office - profes | |||||
SCORE 100 Fs - tf for webfilings Date: March 28, 2014 Contractor: Freedom Fire Protection Llc Client: Canyon Walnut | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Cmp | Completion date: April 4, 2014 | Current use: Office - admini | |||||
SCORE 100 Replacement of stairway in se corner of rtd parking garage. Client: Transporta Regional | Applicant: Symmetry Builders Inc | Permit type: Building | Permit status: Cmp | Completion date: August 3, 2015 | Current use: Parking garage, | |||||
SCORE 95 Fa - es - elevator upgrade (exclusive) Date: February 12, 2015 Contractor: First Call Electric And Fire Inc Client: Transporta Regional | Applicant: First Call Electric & Fire, Inc | Permit type: Fire | Permit status: Iss | Current use: Parking garage, | |||||
SCORE 99 Replacement of 15 ton condensing unit and required refrigeration piping. Unit to be ground mounted. Date: March 16, 2015 Contractor: Walrath Heating And A C Co Inc Client: Transporta Regional | Applicant: Walrath Heating & A/c Co Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 13, 2015 | Current use: Parking garage, | |||||
SCORE 99 Suite 3 - interior remodel to improve an existing tenantfoots space. Scope of work includes associated mes. Client: Canyon Walnut | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - professional, remodel | Permit id: Pmt2016-04987 | |||||
Access mhfoots 6 and 875 on walnut & 15th for splicing fiber to 14 walnut. Job 186711. Date: December 22, 2016 Client: Canyon Walnut | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-05798 | |||||
SCORE 95 Fs - sowl - rel x10 Client: Canyon Walnut | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2016-05816 | |||||
SCORE 95 Fa - sowl - add 1 h s new hall, add 1 strobe conference room, relocate 2 strobes for hallways. Client: Canyon Walnut | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2013-00184 | |||||
SCORE 95 Fs - tf - 2nd floor Client: Canyon Walnut | Permit type: Fire | Permit status: Cmp | Completion date: March 18, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-00347 | |||||
SCORE 95 Tenant remodel of a 7 sf portion of a 2,478 suite in the ne corner of the 2nd floor. (suite number unknown) demolition of interior walls, create a breakroom, minor alteration reconfiguration of hvac ductwork, includes associated electrical and plumbing. Client: Canyon Walnut | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: March 19, 2013 | Current use: Office - professional, remodel | Permit id: Pmt2013-00415 | |||||
SCORE 95 Fs - tf light hazard Client: Canyon Walnut | Permit type: Fire | Permit status: Cmp | Completion date: April 25, 2013 | Current use: Office - professional, existing | Permit id: Pmt2013-00814 | |||||
SCORE 98 Electrical permit for extension of existing circuit in parking garage for new equipment. Client: Transporta Regional | Permit type: Electrical | Permit status: Iss | Current use: Parking garage, existing | Permit id: Pmt2013-01512 | |||||
SCORE 99 Suite102. Demolition and relocation of non-load bearing walls and associated ceiling work, floor and wall finishes and doors. Structural is not part of scope. Mechanical scope to include relocation of diffusers per revised space plan. Plumbing is not part of scope. Vertical grab bars to be added in first floor restroom. Client: Canyon Walnut | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: July 31, 2013 | Current use: Office - professional, remodel | Permit id: Pmt2013-02657 | |||||
SCORE 99 Suite 202 -- (kurtz fargo) tenant remodel of approximately 9 sf to install non-loadbearing walls to create offices, breakroom and reception area. Includes associated electrical (relocated lights, outlets and switches) and mechanical (relocate diffusers and ductwork) no plumbing Client: Canyon Walnut | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: October 15, 2013 | Current use: Office - professional, remodel | Permit id: Pmt2013-02789 | |||||
SCORE 95 Fs - sowl - inchall work to be performed shall be on the first floor and consist of relocating 2 pendent sprinklers in office 118 and relocating 2 more sprinkler in office 120inch Client: Canyon Walnut | Permit type: Fire | Permit status: Cmp | Completion date: March 2, 2016 | Current use: Office - administrative, existing | Permit id: Pmt2013-02928 | |||||
SCORE 95 Fs - sowl - inchrelocate a total of 6 pendent sprinklers offices #246, 244, 243 and 262. Inch Client: Canyon Walnut | Permit type: Fire | Permit status: Cmp | Completion date: October 22, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-03926 | |||||
SCORE 99 Tenant remodel of 1st floor east space for offices for webfilings. Client: Canyon Walnut | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: April 4, 2014 | Current use: Office - professional, tenant remodel | Permit id: Pmt2013-07135 | |||||
SCORE 59 Tenant finish to include partial first floor, entire 2nd floor. Interior demolition permit pmt2001-04236 Client: Walnut Canyon Partners Llc | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - professional, tenant finish | Permit id: Pmt2001-04235 | |||||
SCORE 99 Tenant finish for ctx mortgage (first floor). Client: Walnut Canyon Partners Llc | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Financial institution, tenant finish | Permit id: Pmt2001-04910 | |||||
SCORE 95 Fs - tf for webfilings Client: Canyon Walnut | Permit type: Fire | Permit status: Cmp | Completion date: April 4, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-01345 | |||||
SCORE 95 Suite 201 -- tenant remodel of 2,6 sf to create professional offices, meeting rooms and reception areas. Relocate existing breakroom kitchen and add additional breakroom w kitchen. Client: Canyon Walnut | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: February 8, 2013 | Current use: Office - professional, tenant remodel | Permit id: Pmt2012-04686 | |||||
SCORE 72 Remove trees, tree grates and r r sidewalk, curb and gutter. Date: June 29, 2004 Contractor: Burlstone, Inc Client: Transporta Regional | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2004-02462 | |||||
SCORE 100 Installation of additional catwalk in attic space to provide access to existing hvac equipment. Client: Transporta Regional | Permit type: Building | Permit status: Cmp | Completion date: March 16, 2011 | Current use: Office - administrative, existing | Permit id: Pmt2007-02732 | |||||
Rtde renovate two existing public bathrooms with new wall finishes and fixtures Value: $9 Client: Transporta Regional | Permit type: Building, electrical, plumbing | Permit status: N&v | Current use: Government uses, tenant remodel | Permit id: Pmt2007-04874 | |||||
SCORE 95 Sign permit - for replacement wall sign (non-electric) on commercial building for inchswbc mortgageinch. Client: Canyon Walnut | Permit type: Sign | Permit status: Cmp | Completion date: January 6, 2015 | Current use: Financial institution, existing | Permit id: Pmt2011-00566 | |||||
SCORE 95 Tenant remodel of 40 square feet in suite 4 for grey mountain office. To include new lighting and mechanical upgrades. Client: Canyon Walnut | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: November 10, 2011 | Current use: Office - professional, tenant remodel | Permit id: Pmt2011-01103 | |||||
SCORE 95 New 1 amp feeder for a ups installation. Client: Canyon Walnut | Permit type: Electrical | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Office - administrative, existing | Permit id: Pmt2011-01283 | |||||
SCORE 95 Remodel of approximately 32 sf portion of a 13,237 sf suite on third floor -- demolition of interior walls, removal of a locker room bathroom area (two water closets, four showers and four lavatories) reconfigure walls to create offices and administrtive areas. Includes associated mechanical (relocate ductwork and reconfigure diffusers) and electrical. Client: Canyon Walnut | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: April 25, 2012 | Current use: Office - professional, tenant remodel | Permit id: Pmt2011-01343 | |||||
SCORE 95 Tennant finish fire alarm for faegre & benson Client: Canyon Walnut | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2011-02107 | |||||
SCORE 95 Tennant finish sprinkler grey walnut Client: Canyon Walnut | Permit type: Fire | Permit status: Cmp | Completion date: November 10, 2011 | Current use: Office - professional, existing | Permit id: Pmt2011-04625 | |||||
SCORE 95 Fa - es - elevator upgrade (exclusive) Client: Transporta Regional | Permit type: Fire | Permit status: Iss | Current use: Parking garage, existing | Permit id: Pmt2015-00471 | |||||
SCORE 99 Replacement of 15 ton condensing unit and required refrigeration piping. Unit to be ground mounted. Client: Transporta Regional | Permit type: Mechanical | Permit status: Cmp | Completion date: August 13, 2015 | Current use: Parking garage, existing | Permit id: Pmt2015-00872 | |||||
SCORE 99 Interior non-structural demolition of a portion an office suite to invetsigate systems prior to tenant remodel submittal. Rooftop units to be removed (generator and condensing unit for computer room) to be removed and not replaced. Date: May 2, 2017 Contractor: Ccm Construction Management Inc Client: Canyon Walnut | Permit type: Demolition | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2017-01791 | |||||
SCORE 89 Tenant finish for 3rd and 4th floor in core and shell building. Client: Canyon Walnut | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - administrative, tenant finish | Permit id: Pmt2000-05105 | |||||
SCORE 98 Fire alarm - 1st and 2nd floor Client: Walnut Canyon Partners Llc | Permit type: Fire | Permit status: Cmp | Completion date: February 25, 2002 | Current use: Office - professional, existing | Permit id: Pmt2002-00457 | |||||
SCORE 95 Install new submersible power unit one one existing three stop passenger elevator in the rtd bus terminal. Value: $10,736 Contractor: Thyssenkrupp Elevator Client: Transporta Regional | Permit type: Elevator | Permit status: N&v | Current use: Government uses, remodel | Permit id: Pmt2002-05280 | |||||
SCORE 95 Tenant remodel including installation of new, non-structural interior partions and the addition of one office. Client: Canyon Walnut | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 9, 2003 | Current use: Office - professional, tenant remodel | Permit id: Pmt2003-00524 | |||||
SCORE 95 Tenant remodel on 4th floor Client: Financial Atlantic | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: July 31, 2003 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2003-01603 | |||||
SCORE 99 Installation of louvered vents on elevator shafts. Client: Canyon Walnut | Permit type: Electrical | Permit status: Cmp | Completion date: February 14, 2006 | Current use: Office - professional, existing | Permit id: Pmt2005-03869 | |||||
Rtde renovate two existing public bathrooms with new wall finishes and fixtures Value: $9,896 Client: Transporta Regional | Permit type: Building, electrical, plumbing | Permit status: N&v | Current use: Government uses, tenant remodel | Permit id: Pmt2007-04874 | |||||
SCORE 91 Removal of an existing sign, re-face with inchwr starkeyinch & reinstall. Need row licensed contractor listed on permit before issuance. Client: Canyon Walnut | Permit type: Sign | Permit status: N&v | Current use: Financial institution, existing | Permit id: Pmt2008-02032 | |||||
SCORE 92 Renovation of 2 restrooms -- one menfoots restroom & one ladies restroom on the main floor of the rtd terminal. No new fixtures. No mechanical under scope of this permit. Client: Transporta Regional | Permit type: Building, electrical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: October 17, 2008 | Current use: Government uses, remodel | Permit id: Pmt2008-03846 | |||||
SCORE 99 Unit 3 west - interior, non-structural, tenant remodel, 5787 sf, to take the tenant space back to warm shell. Reference pmt2017-01791, for exploratory scope. Associated electrical covered within the scope of this permit. Hvac to remain. No plumbing fixtures existing or proposed. Client: Canyon Walnut | Permit type: Building, electrical | Permit status: Iss | Current use: Office - professional, tenant remodel | Permit id: Pmt2017-02371 | |||||
SCORE 99 Non-structural tenant remodel of 5942 square feet for kurtz fargo, 3rd floor west suite. To include relocation of the break room and associated mechanical and electrical work. No modifications to envelope or structure. Client: Canyon Walnut | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - professional, tenant remodel | Permit id: Pmt2017-03510 | |||||
SCORE 95 Remodel first floor office space. Removing interior non-structural walls and adding one partition wall. Includes electrical for moving lights and switches and outlets. Includes mechanical for relocating duct work. Client: Properties Savage | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 Sign permit for non-electric wall sign "eco-products" Date: June 23, 2006 Contractor: King Sign Llc Client: Properties Savage | Applicant: King Sign Llc | Permit type: Sign | Permit status: Cmp | Completion date: May 8, 2007 | Current use: Commercial/reta | |||||
SCORE 100 Installation of chain link fence in rear of property. Fence to be 6-feet in height, 493-feet in length. Date: May 17, 2006 Contractor: Carpenter Fence Inc Client: Properties Savage | Applicant: Carpenter Fence, Inc. | Permit type: Fence | Permit status: N&v | Current use: Existing | |||||
SCORE 95 Tenant remodel of second floor od wharhouse wholesale and office accounting and sales of environmental products. No new plumbing fixtures. Moving lights abd relocating switches and outlets. Client: Properties Savage | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 25, 2006 | Current use: Warehousing, te | |||||
SCORE 100 Fire alarm system - radio dialer Date: July 12, 2006 Contractor: Safe Systems Inc Client: Properties Savage | Applicant: Safe Systems, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: September 15, 2006 | Current use: Office - admini | |||||
SCORE 95 Partial tear off and overlay. Epdm 45mil Date: December 13, 2005 Contractor: Black Roofing Inc Client: Investors Kapalua | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Current use: Commercial/reta | |||||
SCORE 95 Remove non bearing partition walls and replace unit heater. . Change out electrical etc. Client: Thomas Surguine | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 13, 2006 | Current use: Warehousing, te | |||||
SCORE 100 New cooler addition to rudis bakery Date: May 9, 2005 Contractor: Fire Defense Inc Client: Investors Kapalua | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: October 11, 2005 | Current use: Warehousing, ex | |||||
SCORE 59 200amp service change Date: September 24, 2004 Contractor: Anything Electric Co Client: Trust Fremont | Applicant: Anything Electric Co. | Permit type: Electrical | Permit status: Cmp | Completion date: April 5, 2005 | Current use: Commercial/reta | |||||
SCORE 100 Fire sprinkler system - adding one sprinkler to new office Date: October 30, 2003 Contractor: Fire Defense Inc Client: Thomas Surguine | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: November 20, 2003 | Current use: Manufacturing, | |||||
SCORE 95 Minor remodel to the old dough room of rudis bakery, apprx 1 square foot enlargment. Client: Thomas Surguine | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 10, 2007 | Current use: Manufacturing, | |||||
SCORE 56 Electrical permit to re-route feeds to mixers to relieve breaker panels. Date: September 10, 2003 Contractor: Thomas Surguine Client: Thomas Surguine | Applicant: Thomas Surguine | Permit type: Electrical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 95 Installation of a temporary ( 24 months) modular accessory office structure. Client: Thomas Surguine | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 2, 2003 | Current use: Manufacturing, | |||||
SCORE 64 Installation of a low-pressure boiler (1. 2 million btu). Date: August 20, 2003 Contractor: Western Steel And Boiler Co Client: Thomas Surguine | Applicant: Western Steel & Boiler Co. | Permit type: Mechanical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 59 Electrical permit to remove re-wire replace existing proofbox (temperature humidity-controlled storage) for rudis bakery. Date: August 21, 2003 Contractor: Sharpley Electric Client: Thomas Surguine | Applicant: Sharpley Electric | Permit type: Electrical | Permit status: Cmp | Completion date: September 18, 2003 | Current use: Manufacturing, | |||||
SCORE 86 Fire sprinkler system - rudis Date: November 23, 2001 Contractor: Adnil Fire Protection Co Client: Thomas Surguine | Applicant: Adnil Fire Protection Co | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Manufacturing, | |||||
SCORE 84 Tenant remodel. Client: Investors Kapalua | Applicant: Walker Construction Mgmt | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 4, 2001 | Current use: Office - profes | |||||
SCORE 95 Fire sprinkler system Date: February 7, 2001 Contractor: Wyco Fire Protection Inc Client: Kapalua Investors | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 20, 2001 | Current use: Office - profes | |||||
SCORE 100 Fire sprinkler system - eco products Date: September 5, 2006 Contractor: Fire Defense Inc Client: Properties Savage | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Storage facility. Electrical by separate permit. See tec 2001-00061 for utilities, storm water and easement dedication. Client: Trust Fremont | Applicant: Kenney Bros Construction Co | Permit type: Building | Permit status: N&v | Current use: Warehousing, ne | |||||
SCORE 59 Relocation of gas piping to allow for the installation of a proposed pv system. Net increase of 1 feet in pipe length on a 2 inch medium pressure sytem. Date: March 16, 2007 Contractor: Properties Savage Client: Properties Savage | Applicant: Properties Savage | Permit type: Mechanical | Permit status: Cmp | Completion date: March 21, 2007 | Current use: Commercial/reta | |||||
SCORE 95 Installation of kw photovoltaic system, eco-products building. Tilt-up installation on a flat roof, black roofing to perform associated work related to penetrations. Client: Properties Savage | Applicant: Namaste Solar Electric Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 18, 2011 | Current use: Wholesale, exis | |||||
SCORE 100 Interior non-structural demo of commercial unit for veterinary use (building permit submittal is pendin). Includes removal of 2 bathrooms. Date: March 5, 2009 Contractor: E J C M Llc Client: Properties Savage | Applicant: E J C M, Llc | Permit type: Demolition | Permit status: Cmp | Completion date: June 29, 2009 | Current use: Service industr | |||||
SCORE 100 Tenant remodel for a veterinary examination and emergency center (4,056 sf). Includes installation of outdoor covered storage area. Client: Properties Savage | Applicant: E J C M, Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 6, 2009 | Current use: Office - profes | |||||
SCORE 100 Tennant finish fire alarm veterinary emergency center Date: May 7, 2009 Contractor: Safe Systems Inc Client: Properties Savage | Applicant: Safe Systems, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: June 26, 2009 | Current use: Hospital/instit | |||||
SCORE 95 Tennant finish sprinkler boulder vet clinic Date: June 1, 2009 Contractor: Western States Fire Protection Client: Properties Savage | Applicant: Western States Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: August 10, 2009 | Current use: Office - profes | |||||
SCORE 95 Sign permit - for inchalpenglow veterinaryinch. Two (2) signs; one (1) freestanding and one (1) wall sign inchanimal emergencyinch. Date: July 10, 2009 Contractor: 20 Communications Client: Properties Savage | Applicant: 20/ Communications | Permit type: Sign | Permit status: Cmp | Completion date: August 7, 2009 | Current use: Office - profes | |||||
SCORE 56 Test existing gas piping -- no new gas fired devices, existing only. Date: January 14, 2010 Contractor: Llc Sycamore Client: Llc Sycamore | Applicant: Llc Sycamore | Permit type: Mechanical | Permit status: N&v | Current use: Warehousing, ex | |||||
SCORE 59 Mechanical permit - test existing gas piping (no new gas fired devices, existing only). Date: February 5, 2010 Contractor: A Approved Plumbing Client: Llc Sycamore | Applicant: A Approved Plumbing | Permit type: Mechanical | Permit status: Cmp | Completion date: September 2, 2011 | Current use: Warehousing, ex | |||||
SCORE 56 Construction of a gate guard shack at fenceline leading to rear secure parking area. Solar work by separate permit. No plumbing, no mechanical -- minor electrical. Client: Properties Savage | Applicant: Kellen Schauermann | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 18, 2010 | Current use: Warehousing, ex | |||||
SCORE 86 Installation of . 86 kw photovoltaic solar energy system on pole at gate shack. Pole and shack, including structure, approved through pmt2010-02840, this permit is solar energy system install only. Date: September 9, 2010 Contractor: Simple Solar Electric Systems Client: Properties Savage | Applicant: Simple Solar Electric Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Existing | |||||
SCORE 96 Conversion of existing warehouse space to indoor recreation use, see lur2011-00064 for use review approval Client: Properties Savage | Applicant: R & M Parker Tech Center Inc | Permit type: Building, electrical | Permit status: Co | Completion date: June 8, 2012 | Current use: Amusement/recre | |||||
SCORE 70 Upsize water service from 1inch to 1 1 2inch see pmt2011-05389 for fees and releases. Date: February 1, 2012 Contractor: Macy Enterprises Inc Client: Properties Savage | Applicant: Macy Enterprises Inc | Permit type: Right-of-way | Permit status: Iss | Current use: Amusement/recre | |||||
SCORE 99 Scope of work letter to add three sprinkler heads to new bathrooms and slop sink area Date: February 16, 2012 Contractor: A B C Fire Protection Inc Client: Properties Savage | Applicant: A B C Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Amusement/recre | |||||
Place new hh at ped 3641 to intercept cbo. Access mh 8312 to pull fiber through new hh to 36 walnut job #15134 Date: December 12, 2016 Client: Properties Savage | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-05632 | |||||
SCORE 95 Interior non-structural demo of commercial unit for veterinary use (building permit submittal is pendin). Includes removal of 2 bathrooms. Date: March 5, 2009 Contractor: E J C M, Llc Client: Properties Savage | Permit type: Demolition | Permit status: Cmp | Completion date: June 29, 2009 | Current use: Service industrial, existing | Permit id: Pmt2009-00736 | |||||
SCORE 95 Tenant remodel for a veterinary examination and emergency center (4,056 sf). Includes installation of outdoor covered storage area. Client: Properties Savage | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 6, 2009 | Current use: Office - professional, tenant remodel | Permit id: Pmt2009-01080 | |||||
SCORE 95 Tennant finish fire alarm veterinary emergency center Client: Properties Savage | Permit type: Fire | Permit status: Cmp | Completion date: June 26, 2009 | Current use: Hospital/institutional, existing | Permit id: Pmt2009-01534 | |||||
SCORE 95 Tennant finish sprinkler boulder vet clinic Client: Properties Savage | Permit type: Fire | Permit status: Cmp | Completion date: August 10, 2009 | Current use: Office - professional, existing | Permit id: Pmt2009-01897 | |||||
SCORE 95 Sign permit - for inchalpenglow veterinaryinch. Two (2) signs; one (1) freestanding and one (1) wall sign inchanimal emergencyinch. Client: Properties Savage | Permit type: Sign | Permit status: Cmp | Completion date: August 7, 2009 | Current use: Office - professional, existing | Permit id: Pmt2009-02431 | |||||
SCORE 95 Fire sprinkler system Client: Kapalua Investors | Permit type: Fire | Permit status: Cmp | Completion date: March 20, 2001 | Current use: Office - professional, existing | Permit id: Pmt2001-00402 | |||||
SCORE 84 Tenant remodel. Client: Investors Kapalua | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: April 4, 2001 | Current use: Office - professional, tenant remodel | Permit id: Pmt2001-00503 | |||||
SCORE 86 Fire sprinkler system - rudifoots Client: Thomas Surguine | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Manufacturing, existing | Permit id: Pmt2001-05161 | |||||
SCORE 99 Scope of work letter to add three sprinkler heads to new bathrooms and slop sink area Client: Properties Savage | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2012-00602 | |||||
SCORE 59 Mechanical permit - test existing gas piping (no new gas fired devices, existing only). Client: Llc Sycamore | Permit type: Mechanical | Permit status: Cmp | Completion date: September 2, 2011 | Current use: Warehousing, existing | Permit id: Pmt2010-00447 | |||||
SCORE 99 Construction of a gate guard shack at fenceline leading to rear secure parking area. Solar work by separate permit. No plumbing, no mechanical -- minor electrical. Client: Properties Savage | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 18, 2010 | Current use: Warehousing, existing, shed, new | Permit id: Pmt2010-02840 | |||||
SCORE 86 Installation of . 86 kw photovoltaic solar energy system on pole at gate shack. Pole and shack, including structure, approved through pmt2010-02840, this permit is solar energy system install only. Client: Properties Savage | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Existing | Permit id: Pmt2010-03841 | |||||
SCORE 95 Fire sprinkler system - adding one sprinkler to new office Client: Thomas Surguine | Permit type: Fire | Permit status: Cmp | Completion date: November 20, 2003 | Current use: Manufacturing, existing | Permit id: Pmt2003-04687 | |||||
SCORE 95 Installation of kw photovoltaic system, eco-products building. Tilt-up installation on a flat roof, black roofing to perform associated work related to penetrations. Client: Properties Savage | Permit type: Building, electrical, flood not required, photovoltaic | Permit status: Cmp | Completion date: March 18, 2011 | Current use: Wholesale, existing | Permit id: Pmt2007-01265 | |||||
SCORE 96 Conversion of existing warehouse space to indoor recreation use, see lur2011-00064 for use review approval Client: Properties Savage | Permit type: Building, electrical, mechanical, plumbing, water | Permit status: Co | Completion date: June 8, 2012 | Current use: Amusement/recreational - indoor, tenant | Permit id: Pmt2011-05389 | |||||
SCORE 95 Fire alarm system - radio dialer Client: Properties Savage | Permit type: Fire | Permit status: Cmp | Completion date: September 15, 2006 | Current use: Office - administrative, existing | Permit id: Pmt2006-02742 | |||||
SCORE 95 Fire sprinkler system - eco products Client: Properties Savage | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2006-03713 | |||||
SCORE 95 Storage facility. Electrical by separate permit. See tec 2001-00061 for utilities, storm water and easement dedication. Value: $112,000 Contractor: Kenney Bros Construction Co Client: Trust Fremont | Permit type: Building | Permit status: N&v | Current use: Warehousing, new | Permit id: Pmt2001-05107 | |||||
SCORE 64 Installation of a low-pressure boiler (1. 2 million btu). Client: Thomas Surguine | Permit type: Mechanical | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2003-03515 | |||||
SCORE 95 Installation of a temporary (<24 months) modular accessory office structure. Client: Thomas Surguine | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 2, 2003 | Current use: Manufacturing, existing | Permit id: Pmt2003-03524 | |||||
SCORE 59 Electrical permit to remove re-wire replace existing proofbox (temperature humidity-controlled storage) for rudifoots bakery. Client: Thomas Surguine | Permit type: Electrical | Permit status: Cmp | Completion date: September 18, 2003 | Current use: Manufacturing, existing | Permit id: Pmt2003-03534 | |||||
SCORE 91 Electrical permit to re-route feeds to mixers to relieve breaker panels. Client: Thomas Surguine | Permit type: Electrical | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2003-03873 | |||||
SCORE 95 Minor remodel to the old dough room of rudifoots bakery, apprx 1 square foot enlargment. Client: Thomas Surguine | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 10, 2007 | Current use: Manufacturing, existing | Permit id: Pmt2003-04453 | |||||
SCORE 59 200amp service change Client: Trust Fremont | Permit type: Electrical | Permit status: Cmp | Completion date: April 5, 2005 | Current use: Commercial/retail, existing | Permit id: Pmt2004-03723 | |||||
SCORE 95 New cooler addition to rudifoots bakery Client: Investors Kapalua | Permit type: Fire | Permit status: Cmp | Completion date: October 11, 2005 | Current use: Warehousing, existing | Permit id: Pmt2005-01573 | |||||
SCORE 95 Partial tear off and overlay. Epdm 45mil Client: Investors Kapalua | Permit type: Roofing | Permit status: Cmp | Current use: Commercial/retail, existing | Permit id: Pmt2005-04780 | |||||
SCORE 95 Remove non bearing partition walls and replace unit heater. . Change out electrical etc. Client: Thomas Surguine | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: June 13, 2006 | Current use: Warehousing, tenant remodel | Permit id: Pmt2006-00254 | |||||
SCORE 95 Tenant remodel of second floor od wharhouse wholesale and office accounting and sales of environmental products. No new plumbing fixtures. Moving lights abd relocating switches and outlets. Client: Properties Savage | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 25, 2006 | Current use: Warehousing, tenant remodel | Permit id: Pmt2006-00855 | |||||
SCORE 95 Installation of chain link fence in rear of property. Fence to be 6-feet in height, 493-feet in length. Client: Properties Savage | Permit type: Fence | Permit status: N&v | Current use: Existing | Permit id: Pmt2006-01893 | |||||
SCORE 95 Sign permit for non-electric wall sign incheco-productsinch Client: Properties Savage | Permit type: Sign | Permit status: Cmp | Completion date: May 8, 2007 | Current use: Commercial/retail, existing | Permit id: Pmt2006-02493 | |||||
SCORE 95 Remodel first floor office space. Removing interior non-structural walls and adding one partition wall. Includes electrical for moving lights and switches and outlets. Includes mechanical for relocating duct work. Client: Properties Savage | Permit type: Building, electrical, mechanical | Permit status: N&v | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2006-02981 | |||||
SCORE 83 Relocation of gas piping to allow for the installation of a proposed pv system. Net increase of 1 feet in pipe length on a 2 inch medium pressure sytem. Client: Properties Savage | Permit type: Mechanical | Permit status: Cmp | Completion date: March 21, 2007 | Current use: Commercial/retail, existing | Permit id: Pmt2007-00922 | |||||
SCORE 63 Test existing gas piping -- no new gas fired devices, existing only. Value: $200 Contractor: J And L Plumbing, Inc Client: Llc Sycamore | Permit type: Mechanical | Permit status: N&v | Current use: Warehousing, existing | Permit id: Pmt2010-00152 | |||||
SCORE 95 Replace rooftop 5 ton, 130,0 btu hvac system with new same size unit. Date: January 8, 2003 Contractor: Control Service Center Inc Client: William Reynolds | Applicant: Control Service Center Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Research & deve | |||||
SCORE 95 Interior tenant remodel including non-structural wall demolition. Client: William Reynolds | Applicant: Rincon Development Inc | Permit type: Building | Permit status: Cmp | Completion date: April 19, 2002 | Current use: Office - profes | |||||
SCORE 95 New nonilluminated wall sign "optical perspectives". Date: April 17, 2001 Contractor: King Sign Llc Client: William Reynolds | Applicant: King Sign Llc | Permit type: Sign | Permit status: N&v | Current use: Office - profes | |||||
SCORE 56 Paint new face on existing sign. Date: March 21, 2001 Contractor: Richard Homeier Client: William Reynolds | Applicant: Richard Homeier | Permit type: Sign | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 Add one hand sink to an existing tenant space. Date: April 28, 2009 Contractor: Rincon Development Inc Client: Gardens Walnut | Applicant: Rincon Development, Inc. | Permit type: Plumbing | Permit status: Cmp | Completion date: May 4, 2009 | Current use: Commercial/reta | |||||
Paint new face on existing sign. Client: William Reynolds | Permit type: Sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2001-01046 | |||||
SCORE 95 Add one hand sink to an existing tenant space. Client: Gardens Walnut | Permit type: Plumbing | Permit status: Cmp | Completion date: May 4, 2009 | Current use: Commercial/retail, existing | Permit id: Pmt2009-01421 | |||||
Paint new face on existing sign. Client: William Reynolds | Permit type: Sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2001-01046 | |||||
SCORE 95 Interior tenant remodel including non-structural wall demolition. Client: William Reynolds | Permit type: Building | Permit status: Cmp | Completion date: April 19, 2002 | Current use: Office - professional, remodel | Permit id: Pmt2002-01315 | |||||
SCORE 82 Interior tenant remodel - construct two new ada compliant dressing rooms, creating a stock room out of existing space, add ada ansi compliant wall signage, and update finishes. Scope also includes removal of a breakroom sink and addition of a light switch. Includes associated mep. Change of scope to include new light fixtures 2 21 17 Client: Gardens Walnut | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 16, 2017 | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2017-00287 | |||||
Paint new face on existing sign. Client: William Reynolds | Permit type: Sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2001-01046 | |||||
SCORE 95 New nonilluminated wall sign inchoptical perspectivesinch. Value: $400 Contractor: King Sign Llc Client: William Reynolds | Permit type: Sign | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2001-01447 | |||||
SCORE 95 Replace rooftop 5 ton, 130,0 btu hvac system with new same size unit. Client: William Reynolds | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Research & development, existing | Permit id: Pmt2003-00066 | |||||
SCORE 59 Fire alarm system - general air Date: March 1, 2006 Contractor: Rocky Mountain Security Svcs Inc Client: Llc Gea | Applicant: Rocky Mountain Security Svcs Inc | Permit type: Fire | Permit status: Cmp | Current use: Commercial/reta | |||||
SCORE 95 Remodel of existing building for existing user, general air service, to remove interior partion walls and install 2 overhead doors for use as storage. Client: Llc Gea | Applicant: Colorado Choice Builders | Permit type: Building | Permit status: Cmp | Completion date: February 11, 2007 | Current use: Warehousing, te | |||||
SCORE 95 Install new illuminated wall sign. Date: April 24, 2001 Contractor: King Sign Llc Client: U S Government | Applicant: King Sign Llc | Permit type: Sign | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 Installation of two new windows per engineers specifications; synthetic stucco application on east and north walls. Client: Llc Gea | Applicant: Colorado Choice Builders | Permit type: Building | Permit status: Cmp | Completion date: March 24, 2004 | Current use: Warehousing, ex | |||||
SCORE 56 Interior non-structural demolition. Date: August 29, 2007 Contractor: David Hershman Client: S U | Applicant: David Hershman | Permit type: Demolition | Permit status: Cls | Current use: Government uses | |||||
SCORE 95 Rocky mountain rescue. Tenant remodel. Client: Of Board | Applicant: Boulder County Architect Div | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 10, 2008 | Current use: Government uses | |||||
SCORE 56 Erection of a training & test tower for rocky mountain rescue -- affiliated with bcso. Tower has been donated to rmr, valuation is for foundation elements for tower. (fees waived per intergovernmental agreeement) Client: Of Board | Applicant: Of Board | Permit type: Building | Permit status: Cmp | Completion date: July 14, 2008 | Current use: Alteration | |||||
SCORE 95 Install new illuminated wall sign. Client: U S Government | Permit type: Sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2001-01452 | |||||
SCORE 95 Remodel of existing building for existing user, general air service, to remove interior partion walls and install 2 overhead doors for use as storage. Client: Llc Gea | Permit type: Building | Permit status: Cmp | Completion date: February 11, 2007 | Current use: Warehousing, tenant remodel | Permit id: Pmt2005-01437 | |||||
Erection of a training & test tower for rocky mountain rescue -- affiliated with bcso. Tower has been donated to rmr, valuation is for foundation elements for tower. (fees waived per intergovernmental agreeement) Date: January 25, 2008 Value: $600 Client: Of Board | Permit type: Building | Permit status: Cmp | Completion date: July 14, 2008 | Current use: Alteration | Permit id: Pmt2008-00054 | |||||
Interior non-structural demolition. Date: August 29, 2007 Client: S U | Permit type: Demolition | Permit status: Cls | Current use: Government uses, existing | Permit id: Pmt2007-03775 | |||||
SCORE 95 Installation of two new windows per engineerfoots specifications; synthetic stucco application on east and north walls. Client: Llc Gea | Permit type: Building | Permit status: Cmp | Completion date: March 24, 2004 | Current use: Warehousing, existing | Permit id: Pmt2003-04007 | |||||
SCORE 59 Fire alarm system - general air Client: Llc Gea | Permit type: Fire | Permit status: Cmp | Current use: Commercial/retail, existing | Permit id: Pmt2006-00695 | |||||
SCORE 95 Rocky mountain rescue. Tenant remodel. Client: Of Board | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: March 10, 2008 | Current use: Government uses, tenant remodel | Permit id: Pmt2007-04452 | |||||
SCORE 95 Total tear-off & re-roof of apartment building. Approx. 1 squares epdm Date: June 1, 2006 Contractor: S C Holley Construction Inc Client: Of City | Applicant: S C Holley Construction Inc | Permit type: Roofing | Permit status: Cmp | Completion date: December 28, 2006 | Current use: Multifamily dwe | |||||
SCORE 95 Date: September 10, 2004 Contractor: C C M Construction Management Client: Of City | Applicant: C C M Construction Management | Permit status: N&v | |||||
SCORE 95 Replace boilers in mechanical room. Date: October 15, 2004 Contractor: C C M Construction Management Client: Of City | Applicant: C C M Construction Management | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: December 21, 2004 | Current use: Multifamily dwe | |||||
SCORE 100 Elevator modernization, install new controls and new fixtures for (2) 5-stop passenger elevators in a 5-story apartment building. Date: August 12, 2003 Contractor: Elevators Unlimited Inc Client: Of City | Applicant: Elevators Unlimited, Inc. | Permit type: Elevator | Permit status: Cmp | Completion date: January 22, 2004 | Current use: Multifamily dwe | |||||
SCORE 100 Provide a 1 amp service for a usam box in the right of way. For row permit, see pmt2001-02870. Date: July 23, 2001 Contractor: Mc Kusker Electric Client: City Of Boulder | Applicant: Mc Kusker Electric | Permit type: Electrical | Permit status: Cmp | Completion date: August 16, 2001 | Current use: Telecommunicati | |||||
SCORE 95 Install (usam) cabinet for electrical permit see pmt2001-03183 Date: July 10, 2001 Contractor: Qwest Client: Of City | Applicant: Qwest | Permit type: Right-of-way | Permit status: Wty | |||||
SCORE 95 Installation of kitchen counter gfi outlet in kitchens of 33 apartment units. Date: December 5, 2005 Contractor: Rollys Electric Inc Client: Of City | Applicant: Rollys Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: December 21, 2005 | Current use: Multifamily dwe | |||||
SCORE 95 Replace herman nelson unit ventilator and associated condensing unit. Date: July 2, 2007 Contractor: Timberline Mechanical Systems Client: Of City | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: July 11, 2007 | Current use: Multifamily dwe | |||||
SCORE 79 Remodel of kitchen in multi unit building. 153 sf Client: Of City | Applicant: Independent Home Living Contractors | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 29, 2008 | Current use: Multifamily dwe | |||||
SCORE 100 Bore 74foot from mh on s. Side of walnut & 20th to existing box. Place conduit to new cool ped. Bore 136foot to power pole in easement Date: October 23, 2009 Contractor: Qwest Comm Centurylink Client: Of City | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 99 Remove existing roofing and re-roof with mil. Epdm membrane. Flat roof, 44 squares. Date: January 26, 2010 Contractor: Alpine Roofing Co Inc Client: Of City | Applicant: Alpine Roofing Co Inc | Permit type: Roofing | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Multifamily dwe | |||||
SCORE 99 Total tear off and reroof of existing multifamily dwelling. Mil epdm membrane, 98 squares, . 25 12 pitch as represented on application. Date: February 12, 2010 Contractor: Alpine Roofing Co Inc Client: Of City | Applicant: Alpine Roofing Co Inc | Permit type: Roofing | Permit status: Cmp | Completion date: April 15, 2011 | Current use: Multifamily dwe | |||||
SCORE 95 Installation of a 75. 6 kw tilt-up grid-tie photovoltaic system. Date: December 15, 2010 Contractor: Hendricks Fine Homes Llc Client: Of City | Applicant: Hendricks Fine Homes Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 8, 2011 | Current use: Multifamily dwe | |||||
SCORE 82 Replacement comfort cooling and unit heater. Date: October 11, 2010 Contractor: U. S. Engineering Company Client: Of City | Applicant: U. S. Engineering Company | Permit type: Mechanical | Permit status: Cmp | Completion date: June 10, 2011 | Current use: Multifamily dwe | |||||
SCORE 99 Replacement of two water heaters and installation of sidearm heat exchangers. Date: October 13, 2010 Contractor: Johnson Controls Inc Client: Of City | Applicant: Johnson Controls, Inc. | Permit type: Mechanical | Permit status: Cmp | Completion date: October 26, 2010 | Current use: Multifamily dwe | |||||
SCORE 100 New radio dialer for walnut place Date: May 19, 2011 Contractor: Safe Systems Inc Client: Of City | Applicant: Safe Systems, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: August 25, 2011 | Current use: Office - profes | |||||
SCORE 95 Installation of two replacement water heaters (standard efficiency) in the first floor mechanical room. 300,0 btu each. Date: August 25, 2011 Contractor: U S Engineering Company Client: Of City | Applicant: U S Engineering Company | Permit type: Mechanical | Permit status: Cmp | Completion date: September 2, 2011 | Current use: Multifamily dwe | |||||
SCORE 77 Remove existing roofing on apartment building and re-roof with dimensional shingles adn tpo on low slope areas. 26 squares total, 5:12 and 1 4:12 roof pitches. Date: April 26, 2013 Contractor: Lallier Construction Inc Client: Of City | Applicant: Lallier Construction Inc | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 95 10foot spot repair of water service line in parking lot on west side of building. Date: April 29, 2015 Contractor: The Elite Pipe Md Client: Of City | Applicant: The Elite Pipe Md | Permit type: Water | Permit status: Act | Current use: Multifamily dwe | |||||
SCORE 95 Remodel of 95 units (14,2 sq. Ft. Total) and common spaces (5,2 sq. Ft. Total). Scope of work includes windows doors siding. Scope of work also includes associated meps to include ventilation make-up air exhaust. Any sitework, signage, walls, and fire sprinkling work under separate permit if necessary. Client: Of City | Applicant: Palace Construction Co Inc | Permit type: Building, electrical | Permit status: Def | Current use: Multifamily dwe | |||||
SCORE 95 Fs - sowl - add 6 upright unit 213 Client: Communitie Boulder | Permit type: Fire | Permit status: Cmp | Completion date: October 13, 2016 | Current use: Multifamily dwellings, existing | Permit id: Pmt2016-00734 | |||||
SCORE 95 Fs - sowl - add 6 spks to unit 313 Client: Communitie Boulder | Permit type: Fire | Permit status: Cmp | Completion date: October 13, 2016 | Current use: Multifamily dwellings, existing | Permit id: Pmt2016-00735 | |||||
SCORE 95 Fs - sowl - add 6 spks to unit 315 Client: Communitie Boulder | Permit type: Fire | Permit status: Cmp | Completion date: October 17, 2016 | Current use: Multifamily dwellings, existing | Permit id: Pmt2016-00736 | |||||
SCORE 76 Fa - es - new lf system for existing multistory residence Client: Communitie Boulder | Permit type: Fire | Permit status: Cmp | Completion date: October 13, 2016 | Current use: Multifamily dwellings, existing | Permit id: Pmt2016-01046 | |||||
SCORE 99 New 1inch irrigation tap, meter & pit. See pmt2015-03574 Date: May 20, 2016 Contractor: R And D Pipeline Construction, Inc Client: Communitie Boulder | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-02231 | |||||
Bore 74foot from mh on s. Side of walnut & 20th to existing box. Place conduit to new cool ped. Bore 136foot to power pole in easement Date: October 23, 2009 Client: Of City | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2009-04068 | |||||
SCORE 77 Remove existing roofing on apartment building and re-roof with dimensional shingles adn tpo on low slope areas. 26 squares total, 5:12 and 1 4:12 roof pitches. Client: Of City | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2013-01764 | |||||
SCORE 100 Provide a 1 amp service for a usam box in the right of way. For row permit, see pmt2001-02870. Client: City Of Boulder | Permit type: Electrical | Permit status: Cmp | Completion date: August 16, 2001 | Current use: Telecommunications, existing | Permit id: Pmt2001-03183 | |||||
SCORE 95 Contractor: C C M Construction Management Client: Of City | Permit status: N&v | Permit id: Pmt2004-03546 | |||||
SCORE 99 Remove existing roofing and re-roof with mil. Epdm membrane. Flat roof, 44 squares. Client: Of City | Permit type: Roofing | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-00288 | |||||
SCORE 99 Total tear off and reroof of existing multifamily dwelling. Mil epdm membrane, 98 squares, . 25 12 pitch as represented on application. Client: Of City | Permit type: Roofing | Permit status: Cmp | Completion date: April 15, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-00537 | |||||
SCORE 95 Installation of a 75. 6 kw tilt-up grid-tie photovoltaic system. Client: Of City | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 8, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-01742 | |||||
SCORE 82 Replacement comfort cooling and unit heater. Client: Of City | Permit type: Mechanical | Permit status: Cmp | Completion date: June 10, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-04421 | |||||
SCORE 97 Replacement of two water heaters and installation of sidearm heat exchangers. Client: Of City | Permit type: Mechanical | Permit status: Cmp | Completion date: October 26, 2010 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-04487 | |||||
SCORE 79 Remodel of kitchen in multi unit building. 153 sf Client: Of City | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: February 29, 2008 | Current use: Multifamily dwellings, remodel | Permit id: Pmt2008-00285 | |||||
SCORE 95 New radio dialer for walnut place Client: Of City | Permit type: Fire | Permit status: Cmp | Completion date: August 25, 2011 | Current use: Office - professional, existing | Permit id: Pmt2011-02011 | |||||
SCORE 95 Installation of two replacement water heaters (standard efficiency) in the first floor mechanical room. 300,0 btu each. Client: Of City | Permit type: Mechanical | Permit status: Cmp | Completion date: September 2, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-03660 | |||||
SCORE 95 Remodel of 95 units (14,2 sq. Ft. Total) and common spaces (5,2 sq. Ft. Total). Scope of work includes windows doors siding. Scope of work also includes associated meps to include ventilation make-up air exhaust. Any sitework, signage, walls, and fire sprinkling work under separate permit if necessary. -change of scope-11 19 15-electrical design change, change in number of distribution panels. Client: Of City | Permit type: Building, electrical, mechanical, plumbing, water, wastewater, flood accessory/remodel, siding | Permit status: Iss | Current use: Multifamily dwellings, remodel | Permit id: Pmt2015-03574 | |||||
SCORE 95 Elevator modernization, install new controls and new fixtures for (2) 5-stop passenger elevators in a 5-story apartment building. Client: Of City | Permit type: Elevator | Permit status: Cmp | Completion date: January 22, 2004 | Current use: Multifamily dwellings, existing | Permit id: Pmt2003-03296 | |||||
SCORE 95 Replace boilers in mechanical room. Client: Of City | Permit type: Electrical, mechanical, flood accessory/remodel | Permit status: Cmp | Completion date: December 21, 2004 | Current use: Multifamily dwellings, existing | Permit id: Pmt2004-03548 | |||||
SCORE 95 Installation of kitchen counter gfi outlet in kitchens of 33 apartment units. Client: Of City | Permit type: Electrical | Permit status: Cmp | Completion date: December 21, 2005 | Current use: Multifamily dwellings, existing | Permit id: Pmt2005-04687 | |||||
SCORE 95 Total tear-off & re-roof of apartment building. Approx. 1 squares epdm Client: Of City | Permit type: Roofing | Permit status: Cmp | Completion date: December 28, 2006 | Current use: Multifamily dwellings, existing | Permit id: Pmt2006-02107 | |||||
SCORE 95 Replace herman nelson unit ventilator and associated condensing unit. Client: Of City | Permit type: Mechanical | Permit status: Cmp | Completion date: July 11, 2007 | Current use: Multifamily dwellings, existing | Permit id: Pmt2007-02721 | |||||
SCORE 95 10foot spot repair of water service line in parking lot on west side of building. Contractor: The Elite Pipe Md Client: Of City | Permit type: Water | Permit status: Act | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-01594 | |||||
SCORE 95 Install new wall sign for plaza juarez. Date: August 2, 2001 Contractor: Supersign Inc Client: William Reynolds | Applicant: Supersign, Inc. | Permit type: Sign | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 98 Interior non-strucutural demolition of non-loadbearing wall elements, carpet, flooring and finish work. No occupancy allowed until separate tenant finish permit is obtained. Date: May 2, 2012 Contractor: Alex Cassidy Client: Gardens Walnut | Applicant: Alex Cassidy | Permit type: Demolition | Permit status: Cmp | Completion date: December 17, 2012 | Current use: Commercial/reta | |||||
SCORE 95 Mechanical permit for replacement rtu for commercial building. New unit in same location, using same penetrations, and at a reduced weight than exiting rtu. Date: July 17, 2015 Contractor: Control Service Center Inc Client: Gardens Walnut | Applicant: Control Service Center Inc | Permit type: Mechanical | Permit status: Iss | Current use: Commercial/reta | |||||
SCORE 95 Install new wall sign for plaza juarez. Client: William Reynolds | Permit type: Sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2001-03224 | |||||
SCORE 95 Interior non-strucutural demolition of non-loadbearing wall elements, carpet, flooring and finish work. No occupancy allowed until separate tenant finish permit is obtained. Date: May 3, 2012 Contractor: Rincon Development, Inc Client: Gardens Walnut | Permit type: Demolition | Permit status: Cmp | Completion date: December 17, 2012 | Current use: Commercial/retail, existing | Permit id: Pmt2012-02124 | |||||
SCORE 95 Mechanical permit for replacement rtu for commercial building. New unit in same location, using same penetrations, and at a reduced weight than exiting rtu. Client: Gardens Walnut | Permit type: Mechanical | Permit status: Iss | Current use: Commercial/retail, existing | Permit id: Pmt2015-02962 | |||||
SCORE 95 Install new wall sign for consolidated electrical distributors Date: January 28, 2002 Contractor: King Sign Llc Client: Kreizelperry Partnership The | Applicant: King Sign Llc | Permit type: Electrical, sign | Permit status: N&v | Current use: Warehousing, ex | |||||
SCORE 95 Remodel of commercial tenant space. 7211 sf. Comvert warehouse to pridemark paramedic services station. Office and garages. New bathrooms. Moving from another location in existing building. Client: Partnershi Kreizelperry | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 4, 2007 | Current use: Service industr | |||||
SCORE 95 Install new wall sign for consolidated electrical distributors Client: Kreizel Perry Partnership The | Permit type: Electrical, sign | Permit status: N&v | Current use: Warehousing, existing | Permit id: Pmt2002-00058 | |||||
SCORE 95 Remodel of commercial tenant space. 7211 sf. Comvert warehouse to pridemark paramedic services station. Office and garages. New bathrooms. Moving from another location in existing building. Client: Partnershi Kreizel Perry | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: June 4, 2007 | Current use: Service industrial, tenant remodel | Permit id: Pmt2007-00390 | |||||
SCORE 88 Replace existing sign with new freestanding sign "gustave larson". Date: December 9, 2004 Contractor: Flatirons Sign Company Client: Partnershi Kreizelperry | Applicant: Flatirons Sign Company | Permit type: Sign | Permit status: Cmp | Completion date: July 18, 2007 | |||||
SCORE 95 Fire sprinkler system - spot gym - storage area Date: October 15, 2003 Contractor: Karmichael And Company Client: Partnershi Kreizelperry | Applicant: Karmichael And Company | Permit type: Fire, flood not requ | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 97 Installation of two hot water heater and associated water piping. Date: October 13, 2003 Contractor: J And L Plumbing Inc Client: Partnershi Kreizelperry | Applicant: J & L Plumbing, Inc. | Permit type: Mechanical, plumbing | Permit status: Cmp | Completion date: December 4, 2003 | Current use: Manufacturing, | |||||
SCORE 56 Replacement of a refrigeration system (58k btu, 7. 5 hp) for the existing warehouse cooler at twisted pine brewery. (a. K. A. 3201 walnut) Date: October 6, 2003 Contractor: Northstar Refrigeration Llc Client: Partnershi Kreizelperry | Applicant: Northstar Refrigeration, Llc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 3, 2007 | Current use: Manufacturing, | |||||
SCORE 56 Interior remodel configure a milling room (h-3) within the existing brewery (f-1). Electrical work by separate permit. Client: Partnershi Kreizelperry | Applicant: Twisted Pine Brewing | Permit type: Building | Permit status: Cmp | Completion date: November 5, 2003 | Current use: Manufacturing, | |||||
SCORE 96 Electrical permit only to install outlets and switches for brewery equipment, pumps, and refrigeration equipment. No change to electrical service. Date: September 11, 2003 Contractor: Electricians Inc Of Boulder Client: Partnershi Kreizelperry | Applicant: Electricians Inc Of Boulder | Permit type: Electrical | Permit status: Cmp | Completion date: February 6, 2004 | Current use: Manufacturing, | |||||
SCORE 95 Install demising wall to separate one existing space into 2 separate spaces. Handicap access will need to be provided to each tenant space when tenant remodel occures for each space. Client: Partnershi Kreizelperry | Applicant: Coast To Coast Development | Permit type: Building | Permit status: Cmp | Completion date: November 19, 2003 | Current use: Commercial/reta | |||||
SCORE 95 Interior non-structural demolition including window openings. Date: June 3, 2002 Contractor: Coast To Coast Development Client: Partnershi Kreizelperry | Applicant: Coast To Coast Development | Permit type: Demolition | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 95 Interior non-structural demolition of office walls in a warehouse. See pmt 2002-05544 for build back plans. Date: February 8, 2002 Contractor: Coast To Coast Development Client: Partnershi Kreizelperry | Applicant: Coast To Coast Development | Permit type: Demolition | Permit status: N&v | Current use: Warehousing, ex | |||||
SCORE 95 Install demising wall to separate one existing space into 2 separate spaces. Handicap access will need to be provided to each tenant space when tenant remodel occures for each space. Client: Partnershi Kreizel Perry | Permit type: Building | Permit status: Cmp | Completion date: November 19, 2003 | Current use: Commercial/retail, remodel | Permit id: Pmt2003-03252 | |||||
SCORE 95 Fire sprinkler system - spot gym - storage area Client: Partnershi Kreizel Perry | Permit type: Fire, flood not required | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2003-04455 | |||||
SCORE 96 Electrical permit only to install outlets and switches for brewery equipment, pumps, and refrigeration equipment. No change to electrical service. Client: Partnershi Kreizel Perry | Permit type: Electrical | Permit status: Cmp | Completion date: February 6, 2004 | Current use: Manufacturing, existing | Permit id: Pmt2003-03894 | |||||
SCORE 68 Interior remodel configure a milling room (h-3) within the existing brewery (f-1). Electrical work by separate permit. Client: Partnershi Kreizel Perry | Permit type: Building | Permit status: Cmp | Completion date: November 5, 2003 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2003-03963 | |||||
SCORE 56 Replacement of a refrigeration system (58k btu, 7. 5 hp) for the existing warehouse cooler at twisted pine brewery. (a. K. A. 3201 walnut) Client: Partnershi Kreizel Perry | Permit type: Mechanical | Permit status: Cmp | Completion date: August 3, 2007 | Current use: Manufacturing, existing | Permit id: Pmt2003-04327 | |||||
SCORE 63 Installation of two hot water heater and associated water piping. Client: Partnershi Kreizel Perry | Permit type: Mechanical, plumbing | Permit status: Cmp | Completion date: December 4, 2003 | Current use: Manufacturing, existing | Permit id: Pmt2003-04435 | |||||
SCORE 88 Replace existing sign with new freestanding sign inchgustave larsoninch. Client: Partnershi Kreizel Perry | Permit type: Sign | Permit status: Cmp | Completion date: July 18, 2007 | Permit id: Pmt2004-04659 | |||||
SCORE 95 Minor tenant remodel including the construction of one new wall, removal of two wall and the addition of two switches amd two plugs. Client: Partnershi Kreizelperry | Applicant: Coast To Coast Development | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 20, 2002 | Current use: Office - admini | |||||
SCORE 95 Minor tenant remodel including the construction of one new wall, removal of two wall and the addition of two switches amd two plugs. Client: Partnershi Kreizel Perry | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 20, 2002 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2002-00729 | |||||
SCORE 95 Remove all below grid walls in 4 retail spaces, create on space with a shipping receiving room in the back. Leave all bathrooms in place, no change in hvac units. See pmt 2002-0104 for interior, nonstructural demo permit. Client: William Reynolds | Applicant: Rincon Development, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 Interior non-structural demo in four spaces. See pmt 2002-01439 for build back plans. Date: April 16, 2002 Contractor: Rincon Development Inc Client: William Reynolds | Applicant: Rincon Development Inc | Permit type: Demolition | Permit status: Cmp | Completion date: May 24, 2002 | Current use: Commercial/reta | |||||
SCORE 95 Install two new 2-ton 17. 2 seer rooftop units (above boulder piano gallery). Units are like for like, utilizing same curb. Date: April 14, 2014 Contractor: Control Service Center Inc Client: Gardens Walnut | Applicant: Control Service Center Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 30, 2014 | Current use: Commercial/reta | |||||
SCORE 95 Install two new 2-ton 17. 2 seer rooftop units (above boulder piano gallery). Units are like for like, utilizing same curb. Client: Gardens Walnut | Permit type: Mechanical | Permit status: Cmp | Completion date: April 30, 2014 | Current use: Commercial/retail, existing | Permit id: Pmt2014-01644 | |||||
SCORE 95 Remove all below grid walls in 4 retail spaces, create on space with a shipping receiving room in the back. Leave all bathrooms in place, no change in hvac units. See pmt 2002-0104 for interior, nonstructural demo permit. Client: William Reynolds | Permit type: Building, electrical, mechanical | Permit status: N&v | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2002-01439 | |||||
SCORE 95 Interior, non-structural demo. See pmt 2002-02838 for build back plans. Date: July 5, 2002 Contractor: Rincon Development Inc Client: William Reynolds | Applicant: Rincon Development Inc | Permit type: Demolition | Permit status: Cmp | Completion date: March 5, 2008 | Current use: Commercial/reta | |||||
SCORE 95 Interior tenant remodel for proposed personal service use. See pmt 2002-02839 for demo permit. Client: William Reynolds | Applicant: Rincon Development Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 26, 2002 | Current use: Commercial/reta | |||||
SCORE 95 Erect temporary wall nonelectric banner Date: April 18, 2002 Contractor: Supersign Inc Client: William Reynolds | Applicant: Supersign, Inc. | Permit type: Sign | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 93 Existing tenant, demolition of one interior wall & addition of doorway Client: Gardens Walnut | Applicant: Layne Mitchell | Permit type: Building | Permit status: Cmp | Completion date: May 17, 2007 | Current use: Commercial/reta | |||||
SCORE 95 Tenant remodel of 8 sf to create a tattoo shop -- add 6 handsinks & one mop sink. No mechanical work, electrical work to include the addition of several outlets & circuits. Existing lighting to be utilized. Client: Gardens Walnut | Applicant: Pine Construction Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 3, 2010 | Current use: Personal servic | |||||
SCORE 95 Tenant remodel of 8 sf to create a tattoo shop -- add 6 handsinks & one mop sink. No mechanical work, electrical work to include the addition of several outlets & circuits. Existing lighting to be utilized. Client: Gardens Walnut | Permit type: Building, electrical, plumbing, flood not required | Permit status: Cmp | Completion date: May 3, 2010 | Current use: Personal service, tenant remodel | Permit id: Pmt2010-00684 | |||||
SCORE 95 Erect temporary wall nonelectric banner Client: William Reynolds | Permit type: Sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2002-01478 | |||||
SCORE 95 Interior tenant remodel for proposed personal service use. See pmt 2002-02839 for demo permit. Client: William Reynolds | Permit type: Building, electrical, mechanical, plumbing, flood not required | Permit status: Cmp | Completion date: August 26, 2002 | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2002-02838 | |||||
SCORE 95 Existing tenant, demolition of one interior wall & addition of doorway Client: Gardens Walnut | Permit type: Building | Permit status: Cmp | Completion date: May 17, 2007 | Current use: Commercial/retail, existing | Permit id: Pmt2006-04817 | |||||
SCORE 56 Installation of seasonal tent to cover outdoor grill and portable bar in fountain court of st. Julien hotel, to be operated in compliance with adr2006-00079. Date: July 6, 2006 Contractor: St. Juliens Partnership Client: Of City, St. Juliens Partnership | Applicant: St. Juliens Partnership | Permit type: Flood accessory/remo | Permit status: Cls | Current use: Motel/hotel/bed | |||||
SCORE 56 New trellis structure installed at entrance to existing restaurant. Electric sign to be installed under seperate permit. Client: Of City | Applicant: Bruce Porcelli | Permit type: Building | Permit status: N&v | Current use: Restaurant, rem | |||||
SCORE 75 Installation of tent for wedding event at st. Julien hotel. Tent to be x with marquee entry canopy 9x total. Tent to be installed on 06 10 2006 and removed 06 12 2006. Date: June 5, 2006 Contractor: Distinctive Tent Rentals Inc Client: Of City | Applicant: Distinctive Tent Rentals, Inc. | Permit type: Temporary event | Permit status: Cls | Current use: Motel/hotel/bed | |||||
SCORE 95 1) add three outlets amp, 208v, single phase, 2) add junction box for future signage in parking garage, 3) add power for coffee equipment in restaurant & bar area. Date: May 24, 2006 Contractor: Accent Electrical Services Corp Client: Of City | Applicant: Accent Electrical Services Corp | Permit type: Electrical | Permit status: Cmp | Completion date: June 2, 2006 | Current use: Motel/hotel/bed | |||||
SCORE 78 Plumbing permit to add floor drain infront of ice machines on first floor. By the dock deliver doors on east side inside. Date: May 18, 2006 Contractor: R K Mechanical Inc Client: Of City | Applicant: R K Mechanical Inc | Permit type: Plumbing | Permit status: Cmp | Completion date: September 2, 2009 | Current use: Motel/hotel/bed | |||||
SCORE 98 Sign permit for three signs. 1 blade sign "spa at st. Julians", 1 blade sign "jills", and 1 awningtrellis sign "jills" Date: June 23, 2006 Contractor: Arapahoe Sign Arts Inc Client: Of City | Applicant: Arapahoe Sign Arts, Inc. | Permit type: Electrical, flood fe | Permit status: Cmp | Completion date: April 28, 2008 | Current use: Commercial/reta | |||||
SCORE 78 Installation of two new outdoor hose bibs adjacent to front entry of st. Julien hotel. Date: January 9, 2006 Contractor: R K Mechanical Inc Client: St Julien Hotel | Applicant: R K Mechanical Inc | Permit type: Plumbing | Permit status: Cmp | Completion date: March 27, 2006 | Current use: Motel/hotel/bed | |||||
SCORE 75 Installation of tent for event at st. Julien hotel. Tent to be x 80. Tent to be set up on aug. 1, and dismantled on aug. 7, 2006. See conditions of adr2006-00117. Date: July 31, 2006 Contractor: Distinctive Tent Rentals Inc Client: Of City | Applicant: Distinctive Tent Rentals, Inc. | Permit type: Temporary event | Permit status: Cls | Current use: Motel/hotel/bed | |||||
SCORE 95 Add 12 outlets in main floor. Kitchen Date: November 16, 2005 Contractor: Accent Electrical Services Corp Client: Of City | Applicant: Accent Electrical Services Corp | Permit type: Electrical | Permit status: Cmp | Completion date: June 2, 2006 | Current use: Motel/hotel/bed | |||||
SCORE 75 Install temporary tent on patio. September 24 to september 29. Date: September 15, 2005 Contractor: Distinctive Tent Rentals Inc Client: Of City | Applicant: Distinctive Tent Rentals, Inc. | Permit type: Temporary event | Permit status: N&v | Current use: Motel/hotel/bed | |||||
SCORE 88 New hotel and parking garage (see tec 2002-00021 for easement dedications). This is a 4 story structure with 2 levels of underground parking, 1st floor contains ballroom, conference rooms, restaurant, pool spa and exercise area, office spaces and incidental rooms, an atrium and 6 elevators. 2nd, 3rd and 4th floors contain a total of 2 guest rooms and incidental rooms and areas. Client: Julien St | Applicant: G E Johnson Const Company Inc | Permit type: Building, electrical | Permit status: Co | Current use: Motel/hotel/bed | |||||
SCORE 95 St julien hotel- hood system Date: November 30, 2005 Contractor: Cintas Corporation Dba Client: Of City | Applicant: Cintas Corporation Dba | Permit type: Fire | Permit status: Cmp | Completion date: February 6, 2006 | Current use: Motel/hotel/bed | |||||
SCORE 56 Temporary tent for international map trade associatoin conference from 9-15-06 until 9-23-06 Date: September 13, 2006 Contractor: Meghan Mclaughlin Client: Of City | Applicant: Meghan Mclaughlin | Permit type: Temporary event | Permit status: Cls | Current use: Motel/hotel/bed | |||||
SCORE 56 Installation of ft x ft tent for a temporary event 10-3-2006 through 10-7-2006. Tent not be be utilized prior to 10: a. M. (see conditions of adr2006-00117.) anticipated use from 10: a. M. Until 3: p. M. Contractor license (d-8 category pending) Date: October 2, 2006 Contractor: Meghan Mc Laughlin Client: Julien St | Applicant: Meghan Mc Laughlin | Permit type: Temporary event | Permit status: N&v | Current use: Motel/hotel/bed | |||||
SCORE 95 Fire sprinkler system - st. Julien, os&y & check valve Date: February 5, 2007 Contractor: Simplex Grinnell Client: Julien St | Applicant: Simplex Grinnell | Permit type: Fire | Permit status: Cmp | Completion date: March 20, 2007 | Current use: Motel/hotel/bed | |||||
SCORE 89 Electrical repair and subpanel replacement for fire system compressor in parking garage. Date: February 12, 2007 Contractor: Fil Llc Dba Ion Electric Client: Julien St | Applicant: Fil, Llc Dba Ion Electric | Permit type: Electrical | Permit status: N&v | Current use: Parking garage, | |||||
SCORE 88 Add tent to top of parking structure. See adr2006-00117. 7-31-2007 to 8-5-2007 Date: July 30, 2007 Contractor: Julien St Client: Julien St | Applicant: Julien St | Permit type: Temporary event | Permit status: Cls | Current use: Motel/hotel/bed | |||||
SCORE 88 Add tent to top of parking structure. See adr2006-00117. 9 23-2007 9-29-2007 Date: September 21, 2007 Contractor: Julien St Client: Julien St | Applicant: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: April 8, 2011 | Current use: Motel/hotel/bed | |||||
SCORE 95 Tennant finish fire alarm st. Gillian Date: October 10, 2007 Contractor: Simplex Grinnell Client: Of City | Applicant: Simplex Grinnell | Permit type: Fire | Permit status: Cmp | Completion date: April 4, 2008 | Current use: Motel/hotel/bed | |||||
SCORE 93 Construction of a glass & wood wine cooler room storage area. 5 cubic feet Client: Julien St | Applicant: Milo Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 13, 2008 | Current use: Motel/hotel/bed | |||||
SCORE 87 Installation of x tent for event in the st. Julien hotel courtyard. Tent to be set-up on 5 13 08 for event on 5 14 2008, removed on 5 15 2008. Date: May 8, 2008 Contractor: Pro Em Distinctive Events Client: Julien St | Applicant: Pro Em Distinctive Events | Permit type: Temporary event | Permit status: Cmp | Completion date: March 2, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 88 Erection of a x 85 tent -- sunday 6 15 2008 thru saturday 6 21 2008. Date: June 13, 2008 Contractor: Julien St Client: Julien St | Applicant: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: March 2, 2012 | |||||
SCORE 100 Erection of a x 75 tent -- aug 5 to aug 10, 2008 Date: August 1, 2008 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: N&v | |||||
SCORE 88 Erection of a 50foot x 75foot tent -- tent to be set-up june 14th 2009, use of tent to be on june 17th - june 19th, tent to be disassembled june 20th, 2009. Tent use will not occur past 10: pm. Date: June 9, 2009 Contractor: Julien St Client: Julien St | Applicant: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 88 Erection of a 40foot x 40foot tent -- tent to be set-up june 14th 2009, use of tent to be on june 17th - june 19th, tent to be disassembled june 20th, 2009. Tent use will not occur past 10: pm. Date: June 9, 2009 Contractor: Julien St Client: Julien St | Applicant: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 75 Erection of a meter x meter tent -- to be set-up july 9th 2009, use of tent to be on july 13th - july 16th, tent to be disassembled july 17th, 2009. Tent use will not occur past 10: pm. Date: June 23, 2009 Contractor: Distinctive Tent Rentals Inc Client: Julien St | Applicant: Distinctive Tent Rentals, Inc. | Permit type: Temporary event | Permit status: N&v | Current use: Motel/hotel/bed | |||||
SCORE 100 Erection of a 60foot x 60foot tent -- to be set-up july 9th 2009, use of tent to be on july 13th - july 16th, tent to be disassembled july 17th, 2009. Tent use will not occur past 10: pm. This permit replaces pmt2009-02371. Date: July 2, 2009 Contractor: Mountain View Tent Company Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 100 Set up of 50foot x 75foot tent for staging of performers and dining tables as approved through adr2006-00117. To be set up august 2nd and taken down august 8th. Tent use not to occur past 10: pm. Date: July 16, 2009 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: September 14, 2009 | Current use: Amusement/recre | |||||
SCORE 100 Set up of 40foot x 40foot tent for set-up october 9th, use october 10th and taken down october 11th. Tent use not to occur past 10: pm. Date: October 8, 2009 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 100 Tent to be located on east pad and used for breakfast and lunch april 19 - april 22. Date: April 7, 2010 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 100 Installation of a 40foot x 40foot open sided tent structure & 50foot x 70foot tent with two sides in plaza area -- erected june 15, 20 and to be taken down june 18, 2010. For daytime use only - no amplified sound. Date: June 4, 2010 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 56 Installation of railing for patio seating enclosure at jillfoots restaurant per approval under rev2010-00010 Date: July 2, 2010 Contractor: Mclean Forge And Welding Client: Julien St | Applicant: Mclean Forge & Welding | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Proposed new sign on northeast corner windows inchjillfoots restaurantinch. Revised sign includes double line of text, so 32inch height allowed (bottom of j exceeds 24inch, but was found to be acceptable under this provision as it is part of the logo). Date: July 29, 2010 Contractor: Adcon Inc Client: Julien St | Applicant: Adcon, Inc. | Permit type: Sign | Permit status: Cmp | Completion date: March 7, 2013 | Current use: Restaurant, exi | |||||
SCORE 100 Placement of a 50foot x 75foot tent on the civic pad from august 8th through august 16th. Event not to occur later than pm. Date: July 29, 2010 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Commercial/reta | |||||
SCORE 95 Scope of work letter for the st. Julien hotel garage install of new fdc routed from the existing riser room in the st. Julien garage. Date: January 5, 2011 Contractor: Simplex Grinnell Lp Client: Of City | Applicant: Simplex Grinnell Lp | Permit type: Fire | Permit status: Iss | Current use: Motel/hotel/bed | |||||
SCORE 100 Placement of a side walled tent with three entrance exits to be used for daytime meals only. April 16th - 21st. Date: March 29, 2011 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Amusement/recre | |||||
SCORE 95 Tennant finish fire alarm for the st. Julien hotel elevator addition Date: June 1, 2011 Contractor: Simplex Grinnell Lp Client: Of City | Applicant: Simplex Grinnell Lp | Permit type: Fire | Permit status: Cmp | Completion date: June 16, 2011 | Current use: Motel/hotel/bed | |||||
SCORE 100 Placement of a 40foot x 40foot tent on lawn area to be in place from june 19-25, 2011 Date: June 8, 2011 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Existing | |||||
SCORE 100 Placement of a 50foot x 75foot temporary tent on the civic pad, in compilance with adr2010-00038. Tent set up to take place on august 8th, tear down on august 14th Date: July 18, 2011 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 100 Placement of a 40foot x 40foot temporary tent on the st. Julien lawn, in compilance with adr2010-00038. Tent set up to take place on august 7th, tear down on august 9th Date: July 18, 2011 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: December 10, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 100 Trench 23foot from manhole to building. Place 2foot conuit for fiber run. Date: August 8, 2011 Contractor: Qwest Comm Centurylink Client: Of City | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | Current use: Motel/hotel/bed | |||||
SCORE 100 Placement of a 60foot x 75foot temorary tent structure to be set up september 17th through 21st on the civic pad at the st. Julien hotel. Date: August 29, 2011 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Existing | |||||
SCORE 100 Temporary tent, 40foot x 40foot at st. Julien hotel in conjunction with the cu leeds - meeting of the minds conference. Tent to be installed 9 20 11 and removed 9 23 11 and will be operated per the terms of approval for adr2006-00117. Date: September 16, 2011 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 100 Erection of a x tent on the civic pad -- april 19, 2012 through april 28, 2012. (events to occur april 20th, and april 24 through april 27.) see adr2010-00038 for permanent minor modification for tent use. Date: April 5, 2012 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 100 Installation of a 40foot x 40foot tent (no sides to be on for the event) in the lawn area june 12, 2012 through friday june 15, 2012. Date: May 30, 2012 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: June 21, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 100 Installation of a 40foot x 40foot tent (no sides to be on for the event) in the lawn area wednesday june 20, 2012 through friday june 22, 2012. Date: May 30, 2012 Contractor: Mountain View Tent Company Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: N&v | Current use: Motel/hotel/bed | |||||
SCORE 100 Installation of a 60foot x 70foot tent in the pavillion area (concrete pad) -- set up sunday, june 10, 2012. Additional work in tent area (a c units and power generators) require additional permits (electrical and mechanical) that will require separate review. Date: June 5, 2012 Contractor: Mountain View Tent Company Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 67 Installation of temporary a c units, generator, and lighting for tents associated with pmt2012-01564. A c units to be on flat bed trailer. To be set up 6 10, and removed by 6 17. Date: June 8, 2012 Contractor: Technical And Electrical Services Llc Client: Julien St | Applicant: Technical & Electrical Services Llc | Permit type: Electrical, mechanic | Permit status: Iss | Current use: Motel/hotel/bed | |||||
SCORE 100 Set up of a 50foot x 75foot tent on the civic pad at the st. Julien hotel from august 5th through august 11th. Date: July 17, 2012 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: August 7, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 100 Set up of a 50foot x 45foot tent canopy on the civic pad at the st. Julien hotel from july 18th through july 21st. Date: July 17, 2012 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 100 Erection of a 40foot x 40foot tent (open sided) for a social event to be erected on the lawn area of the st julien -- event to be july 28, 2012 to july 31, 2012. See adr2010-00038 for supplemental information. Date: July 24, 2012 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: December 10, 2012 | Current use: Motel/hotel/bed | |||||
SCORE 95 Installation of an exhaust fan and ducting to vent a commercial iron located in the laundry room of the st. Julian hotel. Electrical under separate permit. Date: May 2, 2013 Contractor: Timberline Mechanical Systems Client: Julien St | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 100 Erection of a 85foot x 80foot tent (enclosed) for a social event to be erected on the conference pavillion of the st julien -- event to be may 30, 2013 to june 7, 2013. See adr2010-00038 for supplemental information. Date: May 21, 2013 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 100 Erection of a 40foot x 40foot tent (open sided) for a social event to be erected on the conference pavillion of the st julien -- event to be june 5th to june 7th, 2013. See adr2010-00038 for supplemental information. Date: May 21, 2013 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: June 10, 2013 | Current use: Motel/hotel/bed | |||||
SCORE 100 Erection of a 40foot x 40foot tent (open sided) for a social event to be erected on the conference pavillion of the st julien -- event to be june 12, 2013 - june 15, 2013. See adr2010-00038 for supplemental information. Date: May 21, 2013 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 100 Erection of a 40foot x 60foot tent (enclosed) for a social event to be erected on the conference pavillion of the st julien -- event to be june 27, 2013 - july 2, 2013. See adr2010-00038 for supplemental information. Date: May 24, 2013 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 67 At the st. Julien hotel concrete pad, installation of generator, and temporary interior lighting for tents associated with one or more of the following permits pmt2013-02252, -02253, -02255 and -02320. To be set up 6 3, and removed by 6 13. Date: May 31, 2013 Contractor: Technical And Electrical Services Llc Client: Julien St | Applicant: Technical & Electrical Services Llc | Permit type: Electrical | Permit status: Cmp | Completion date: June 6, 2013 | Current use: Motel/hotel/bed | |||||
SCORE 91 Erection of a 40foot x 100foot tent (enclosed) for a social event to be erected on the conference pavillion of the st julien -- event to beaugust 3, 2013. See adr2010-00038 for supplemental information. Date: July 3, 2013 Contractor: Event Rents Inc Client: Julien St | Applicant: Event Rents Inc | Permit type: Temporary event | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 100 Installation of 50foot x 75foot temporary tent for fmqb lunch and reception events august 4th - august 11th. Date: July 30, 2013 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Existing | |||||
SCORE 100 Installation of 30foot x 75foot temporary tent on the south lawn at the st. Julien tent set up on 8 18, tear down on 8 21. No electrical. Date: August 14, 2013 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 100 Erection of a 40foot x 60foot tent (open sided) for a social event to be erected on the conference pavillion pad of the st julien hotel premises -- event to be sept 28, 2013 - sept 29, 2013. See adr2006-00117 for supplemental information. Date: September 27, 2013 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 56 Installation of a 60footx75foot temporary tent with walls. Tent to be installed on the civic pad at st. Julien hotel. Setup date is sunday 10 6 and teardown is monday 10 14. Reference adr2010-00038 and adr2006-00117 Date: October 2, 2013 Contractor: St Julien Hotel Client: Julien St | Applicant: St Julien Hotel | Permit type: Temporary event | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 100 Installation of a 40foot x 40foot temporary event tent. Please refer to flame retardant documentation and site plan for location - tent will be open-air. Date: June 2, 2014 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Iss | Current use: Motel/hotel/bed | |||||
SCORE 59 Installation of a 50foot x75foot temporary tent with removable walls. Tent to be installed on the civic pad on the south east side of the st. Julien hotel. Setup date is sunday 8 3 and teardown is sunday 8 10. Hours of use to be between 10am and 6:15pm. Date: July 18, 2014 Contractor: St Julien Partners Gunbarrel Client: Julien St | Applicant: St Julien Partners Gunbarrel | Permit type: Temporary event | Permit status: Cmp | Completion date: August 6, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 100 Installation of a 40footx60foot temporary tent on the civic pad area on the se side of the st. Julien hotel. Setup date is saturday 9 and teardown is tuesday 9 23. Date: September 17, 2014 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: September 23, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 59 Erect 40footx40foot tent for temporary event. Tent will be used on 10 01 14 from 5pm-7pm and set up on 9 30 14 and taken down on 10 02 14. No heaters to be placed in tent. Reference adr2010-00038 Date: September 29, 2014 Contractor: St Julien Partners Gunbarrel Client: Julien St | Applicant: St Julien Partners Gunbarrel | Permit type: Temporary event | Permit status: Cmp | Completion date: October 1, 2014 | Current use: Motel/hotel/bed | |||||
SCORE 100 Erect 40footx40foot tent for temporary event. Tent will be used on 6 15 15 through 6 19 15 from 7am-7pm during meal times. Tent to be set up on 6 14 15 and taken down on 6 20 15. No heaters to be placed in tent. Reference adr2010-00038 Date: June 12, 2015 Contractor: Mountain View Tent Company Client: Julien St | Applicant: Mountain View Tent Company | Permit type: Temporary event | Permit status: Cmp | Completion date: June 19, 2015 | Current use: Existing | |||||
SCORE 59 Installation of a 50foot x 75foot temporary tent with removable walls that will be opened during event times. Tent to be installed on the civic pad at the se corner of the st julien hotel. Setup on 8 2 15 and teardown on 8 9 15. Date: July 29, 2015 Contractor: Tim Gumm Client: Julien St | Applicant: Tim Gumm | Permit type: Temporary event | Permit status: Cmp | Completion date: August 4, 2015 | Current use: Motel/hotel/bed | |||||
SCORE 59 Installation of a 40foot x 40foot temporary tent with removable walls that will be opened during event times. Tent to be installed on the st julien hotel lawn. Setup on 8 11 15 and teardown on 8 12 15. Date: July 29, 2015 Contractor: Tim Gumm Client: Julien St | Applicant: Tim Gumm | Permit type: Temporary event | Permit status: Iss | Current use: Motel/hotel/bed | |||||
SCORE 100 Installation of a 40footx40foot temporary tent with removable walls that will be opened during event times. Tent to be installed on sthe st julien hotel lawn. Setup date is wednesday 6 22 and teardown is friday 6 24. Reference adr2010-00038 Date: June 17, 2016 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2016-02844 | |||||
SCORE 100 Installation of a 40footx40foot temporary tent with removable walls that will be opened during event times. Tent to be installed on sthe st julien hotel lawn. Setup date is monday 8 8 2016 and teardown is tuesday 8 9 2016. Reference adr2010-00038. Date: June 17, 2016 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2016-02845 | |||||
SCORE 100 Installation of a 50foot x75foot temporary tent with removable walls. Tent to be installed on the civic pad on the south east side of the st. Julien hotel. Setup date is sunday 8 7 and teardown is sunday 8 14. Hours of use to be between 10am and 6:15pm. Refernece adr2010-00038 Date: June 17, 2016 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2016-02846 | |||||
SCORE 88 Remove and replace trees along streets. 17 trees in total. Date: July 8, 2016 Contractor: James Martin Associates Client: R Name | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-03137 | |||||
SCORE 100 Instalation of a 30-ft x 75-ft and 10-ft x 20-ft temporary tent for an event. Tent to be up from 9 16 2016 - 9 20 2016 Date: September 15, 2016 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2016-04323 | |||||
Erection of a 50foot x 75foot tent -- tent to be set-up june 14th 2009, use of tent to be on june 17th - june 19th, tent to be disassembled june 20th, 2009. Tent use will not occur past 10: pm. Date: June 9, 2009 Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2009-02083 | |||||
Erection of a 40foot x 40foot tent -- tent to be set-up june 14th 2009, use of tent to be on june 17th - june 19th, tent to be disassembled june 20th, 2009. Tent use will not occur past 10: pm. Date: June 9, 2009 Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: July 26, 2012 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2009-02084 | |||||
SCORE 95 Installation of an exhaust fan and ducting to vent a commercial iron located in the laundry room of the st. Julian hotel. Electrical under separate permit. Client: Julien St | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2014 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2013-01492 | |||||
SCORE 67 At the st. Julien hotel concrete pad, installation of generator, and temporary interior lighting for tents associated with one or more of the following permits pmt2013-02252, -02253, -02255 and -02320. To be set up 6 3, and removed by 6 13. Client: Julien St | Permit type: Electrical | Permit status: Cmp | Completion date: June 6, 2013 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2013-02463 | |||||
Installation of a 60footx75foot temporary tent with walls. Tent to be installed on the civic pad at st. Julien hotel. Setup date is sunday 10 6 and teardown is monday 10 14. Reference adr2010-00038 and adr2006-00117 Date: October 2, 2013 Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2013-05121 | |||||
SCORE 100 Installation of a 50foot x75foot temporary tent with removable walls. Tent to be installed on the civic pad on the south east side of the st. Julien hotel. Setup date is sunday 8 3 and teardown is sunday 8 10. Hours of use to be between 10am and 6:15pm. Date: July 18, 2014 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: August 6, 2014 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2014-03369 | |||||
SCORE 100 Erect 40footx40foot tent for temporary event. Tent will be used on 10 01 14 from 5pm-7pm and set up on 9 30 14 and taken down on 10 02 14. No heaters to be placed in tent. Reference adr2010-00038 Date: September 29, 2014 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: October 1, 2014 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2014-04482 | |||||
SCORE 67 Installation of temporary a c units, generator, and lighting for tents associated with pmt2012-01564. A c units to be on flat bed trailer. To be set up 6 10, and removed by 6 17. Client: Julien St | Permit type: Electrical, mechanical | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2012-02817 | |||||
SCORE 78 Install temporary tent on patio. September 24 to september 29. Date: September 15, 2005 Contractor: Distinctive Tent Rentals, Inc Client: Of City | Permit type: Temporary event | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2005-03592 | |||||
SCORE 100 Proposed new sign on northeast corner windows inchjillfoots restaurantinch. Revised sign includes double line of text, so 32inch height allowed (bottom of j exceeds 24inch, but was found to be acceptable under this provision as it is part of the logo). Client: Julien St | Permit type: Sign | Permit status: Cmp | Completion date: March 7, 2013 | Current use: Restaurant, existing | Permit id: Pmt2010-02687 | |||||
Erection of a x 85 tent -- sunday 6 15 2008 thru saturday 6 21 2008. Date: June 13, 2008 Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: March 2, 2012 | Permit id: Pmt2008-02435 | |||||
Add tent to top of parking structure. See adr2006-00117. 7-31-2007 to 8-5-2007 Date: July 30, 2007 Client: Julien St | Permit type: Temporary event | Permit status: Cls | Current use: Motel/hotel/bed & breakfast | Permit id: Pmt2007-03194 | |||||
Add tent to top of parking structure. See adr2006-00117. 9 23-2007 9-29-2007 Date: September 21, 2007 Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: April 8, 2011 | Current use: Motel/hotel/bed & breakfast | Permit id: Pmt2007-04147 | |||||
SCORE 95 Scope of work letter for the st. Julien hotel garage install of new fdc routed from the existing riser room in the st. Julien garage. Client: Of City | Permit type: Fire | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2011-00011 | |||||
SCORE 95 Tennant finish fire alarm for the st. Julien hotel elevator addition Client: Of City | Permit type: Fire | Permit status: Cmp | Completion date: June 16, 2011 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2011-02196 | |||||
Trench 23foot from manhole to building. Place 2foot conuit for fiber run. Date: August 8, 2011 Client: Of City | Permit type: Right-of-way | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2011-03344 | |||||
Installation of a 50foot x 75foot temporary tent with removable walls that will be opened during event times. Tent to be installed on the civic pad at the se corner of the st julien hotel. Setup on 8 2 15 and teardown on 8 9 15. Date: July 29, 2015 Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: August 4, 2015 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2015-03153 | |||||
Installation of a 40foot x 40foot temporary tent with removable walls that will be opened during event times. Tent to be installed on the st julien hotel lawn. Setup on 8 11 15 and teardown on 8 12 15. Date: July 29, 2015 Client: Julien St | Permit type: Temporary event | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2015-03156 | |||||
SCORE 100 Installation of a 40foot x 40foot temp. Tent on the st. Julien hotel lawn. Event will be held from 9 23 (setup) through 9 25 from the hours of 12 noon to 9: p. M. See adr2010-00038 Date: September 21, 2015 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: September 28, 2015 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2015-04082 | |||||
SCORE 100 Installation of 40foot x 40foot temporary tent for event on the st. Julien hotel lawn. Setup to be wednesday 10 14 15 and teardown to be saturday 10 17 15. Date: October 12, 2015 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: October 19, 2015 | Current use: Existing | Permit id: Pmt2015-04500 | |||||
SCORE 73 Replace expansion tanks located in boiler room Client: Julien St | Permit type: Mechanical | Permit status: Cmp | Completion date: December 16, 2015 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2015-05296 | |||||
Installation of seasonal tent to cover outdoor grill and portable bar in fountain court of st. Julien hotel, to be operated in compliance with adr2006-00079. Date: July 17, 2006 Client: Of City | Permit type: Flood accessory/remodel, temporary event | Permit status: Cls | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2006-02680 | |||||
Temporary tent for international map trade associatoin conference from 9-15-06 until 9-23-06 Date: September 13, 2006 Client: Of City | Permit type: Temporary event | Permit status: Cls | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2006-03876 | |||||
Installation of ft x ft tent for a temporary event 10-3-2006 through 10-7-2006. Tent not be be utilized prior to 10: a. M. (see conditions of adr2006-00117.) anticipated use from 10: a. M. Until 3: p. M. Contractor license (d-8 category pending) Date: October 2, 2006 Client: Julien St | Permit type: Temporary event | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2006-04260 | |||||
SCORE 100 Installation of a 35foot x45foot temporary tent with removable walls. Tent to be installed on the st. Julien hotel lawn area. Setup date is 5 18 2017 and teardown is 5 20 2017. Refernece adr2010-00038 Date: May 17, 2017 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-02111 | |||||
SCORE 100 Repair street light feed in sidewalk. Job 12456986-27 Date: February 10, 2017 Contractor: Xcel Energy Client: Julien St | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-00418 | |||||
SCORE 100 Installation of a 40foot x 40foot temporary tent with removable walls. Tent to be installed on the st. Julien hotel lawn area. Setup date is 5 31 2017 and teardown is 6 02 2017. Refernece adr2010-00038 Date: May 17, 2017 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-02112 | |||||
SCORE 100 Installation of a 40foot x 40foot temporary tent with removable walls. Tent to be installed on the st. Julien hotel lawn area. Setup date is 6 14 2017 and teardown is 6 16 2017. Refernece adr2010-00038 Date: May 17, 2017 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-02113 | |||||
SCORE 88 New hotel and parking garage (see tec 2002-00021 for easement dedications). This is a 4 story structure with 2 levels of underground parking, 1st floor contains ballroom, conference rooms, restaurant, pool spa and exercise area, office spaces and incidental rooms, an atrium and 6 elevators. 2nd, 3rd and 4th floors contain a total of 2 guest rooms and incidental rooms and areas. Client: Julien St | Permit type: Building, electrical, mechanical, plumbing, water, wastewater, sitework | Permit status: Co | Current use: Motel/hotel/bed & breakfast, new, garage | Permit id: Pmt2002-02091 | |||||
SCORE 95 Add 12 outlets in main floor. Kitchen Client: Of City | Permit type: Electrical | Permit status: Cmp | Completion date: June 2, 2006 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2005-04449 | |||||
SCORE 95 St julien hotel- hood system Client: Of City | Permit type: Fire | Permit status: Cmp | Completion date: February 6, 2006 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2005-04590 | |||||
SCORE 78 Installation of two new outdoor hose bibs adjacent to front entry of st. Julien hotel. Client: St Julien Hotel | Permit type: Plumbing | Permit status: Cmp | Completion date: March 27, 2006 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2006-00085 | |||||
SCORE 95 Sign permit for three signs. 1 blade sign inchspa at st. Juliansinch, 1 blade sign inchjillfootsinch, and 1 awning trellis sign inchjillfootsinch Client: Of City | Permit type: Electrical, flood fence flood permit, sign | Permit status: Cmp | Completion date: April 28, 2008 | Current use: Commercial/retail, existing | Permit id: Pmt2006-01679 | |||||
SCORE 78 Plumbing permit to add floor drain infront of ice machines on first floor. By the dock deliver doors on east side inside. Client: Of City | Permit type: Plumbing | Permit status: Cmp | Completion date: September 2, 2009 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2006-01855 | |||||
SCORE 95 1) add three outlets amp, 208v, single phase, 2) add junction box for future signage in parking garage, 3) add power for coffee equipment in restaurant & bar area. Client: Of City | Permit type: Electrical | Permit status: Cmp | Completion date: June 2, 2006 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2006-01996 | |||||
SCORE 78 Installation of tent for wedding event at st. Julien hotel. Tent to be 30foot x 50foot with marquee entry canopy 9footx60foot total. Tent to be installed on 06 10 2006 and removed 06 12 2006. Date: June 5, 2006 Contractor: Distinctive Tent Rentals, Inc Client: Of City | Permit type: Temporary event | Permit status: Cls | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2006-02182 | |||||
SCORE 95 New trellis structure installed at entrance to existing restaurant. Electric sign to be installed under seperate permit. Client: Of City | Permit type: Building | Permit status: N&v | Current use: Restaurant, remodel | Permit id: Pmt2006-02440 | |||||
SCORE 78 Installation of tent for event at st. Julien hotel. Tent to be 50foot x 80foot. Tent to be set up on aug. 1, and dismantled on aug. 7, 2006. See conditions of adr2006-00117. Date: July 31, 2006 Contractor: Distinctive Tent Rentals, Inc Client: Of City | Permit type: Temporary event | Permit status: Cls | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2006-03062 | |||||
SCORE 95 Fire sprinkler system - st. Julien, os&y & check valve Client: Julien St | Permit type: Fire | Permit status: Cmp | Completion date: March 20, 2007 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2007-00306 | |||||
SCORE 88 Electrical repair and subpanel replacement for fire system compressor in parking garage. Client: Julien St | Permit type: Electrical | Permit status: N&v | Current use: Parking garage, existing | Permit id: Pmt2007-00442 | |||||
SCORE 95 Tennant finish fire alarm st. Gillian Client: Of City | Permit type: Fire | Permit status: Cmp | Completion date: April 4, 2008 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2007-04437 | |||||
SCORE 93 Construction of a glass & wood wine cooler room storage area. 5 cubic feet Client: Julien St | Permit type: Building, electrical, flood accessory/remodel | Permit status: Cmp | Completion date: February 13, 2008 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2008-00120 | |||||
Erection of a 80foot x 85foot tent -- sunday 6 15 2008 thru saturday 6 21 2008. Date: June 13, 2008 Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: March 2, 2012 | Permit id: Pmt2008-02435 | |||||
SCORE 100 Erection of a 50foot x 75foot tent -- aug 5 to aug 10, 2008 Date: August 6, 2008 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: N&v | Permit id: Pmt2008-03296 | |||||
SCORE 78 Erection of a meter x meter tent -- to be set-up july 9th 2009, use of tent to be on july 13th - july 16th, tent to be disassembled july 17th, 2009. Tent use will not occur past 10: pm. Contractor: Distinctive Tent Rentals, Inc Client: Julien St | Permit type: Temporary event | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2009-02371 | |||||
SCORE 100 Installation of a 30foot x 75foot tent and a 10foot x 40foot temporary tent with removable walls that will be open during the event. Tents will be installed on the st. Julien lawn. Setuo to be monday 8 7 17 and teardown to be 8 9 17. Date: July 28, 2017 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: August 9, 2017 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-03221 | |||||
SCORE 100 Installation of a 50foot x 75foot temporary tent with removable walls that will be open during the event. Tents will be installed on the civic pad on the se corner of the st. Julien hotel property. Setup to be monday 8 5 17 and teardown to be 8 13 17. Date: July 28, 2017 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: August 9, 2017 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-03222 | |||||
SCORE 100 Installation of a 40foot x 40foot temporary tent with removable walls that will be open during event times. Tent to be installed on the st. Julien lawn. Setuo date is sunday 9 17 17 and teardown is wednesday 9 20 17. Date: September 18, 2017 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: September 25, 2017 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-03979 | |||||
SCORE 100 Installation of a 40foot x 40foot temporary tent with removable walls that will be open during event times. Tent to be installed on the st. Julien lawn. Setup date is wednesday 10 11 17 and teardown is saturday 10 14 17. Date: October 10, 2017 Contractor: Mountain View Tent Company Client: Julien St | Permit type: Temporary event | Permit status: Cmp | Completion date: October 31, 2017 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-04417 | |||||
SCORE 100 Repair conduit in road 15x6 traffic control 3-5 days Date: July 10, 2006 Contractor: Qwest Comm Centurylink Client: Authority Housing | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Elevator permit to repair 25 pound passenger elevator, 5 stories. Date: May 31, 2006 Contractor: Elevators Unlimited Inc Client: Properties Canyon | Applicant: Elevators Unlimited, Inc. | Permit type: Elevator | Permit status: Cls | Current use: Government uses | |||||
SCORE 95 Mechanical permit to replace water heater in unit a. Date: May 3, 2006 Contractor: Precision Plumbing And Heating Client: Pensionfor Alecta | Applicant: Precision Plumbing & Heating | Permit type: Mechanical | Permit status: Cmp | Completion date: May 10, 2006 | Current use: Office - admini | |||||
SCORE 100 Demolish and re-build roof-top concrete recreation deck. Applicant: Repairs Unlimited, Inc. | Permit type: Building | Permit status: Cmp | Completion date: December 6, 2005 | Current use: Deck, alteratio | |||||
SCORE 86 Repair existing 2 x 5 handhold Date: February 11, 2003 Contractor: Utilx Corporation Client: Authority Housing | Applicant: Utilx Corporation | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Install 36,0 btu comfort cooling unit in community room. Date: June 14, 2002 Contractor: Control Service Center Inc Client: Authority Housing | Applicant: Control Service Center Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Current use: Multifamily dwe | |||||
SCORE 95 Fire sprinkler system - elevator pits Date: February 16, 2007 Contractor: Integrated Safety Services Client: Authority Housing | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: May 20, 2008 | Current use: Multifamily dwe | |||||
SCORE 95 Fire alarm 7 walnut canyon pointe Date: February 28, 2007 Contractor: Integrated Safety Services Client: Authority Housing | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: May 20, 2008 | Current use: Townhomes, exis | |||||
SCORE 93 Installation of several outlets for an ice-melt system for the gutters. Date: September 30, 2008 Contractor: Power Generation Applicant: Power Generation | Permit type: Electrical | Permit status: Cmp | Completion date: December 12, 2008 | Current use: Multifamily dwe | |||||
SCORE 93 Pv installation on senior apartment building (boulder housing partners). Flush mounted, grid-tied, and 58. 8 kw. Date: August 13, 2010 Contractor: Standard Renewable Energy Client: Authority Housing | Applicant: Standard Renewable Energy | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 6, 2012 | Current use: Multifamily dwe | |||||
SCORE 95 Roofing permit - for re-roof of multi-family residential building with versico mechanically fastened 60-mil tpo at pitch of 1 4 inch per foot. Date: August 30, 2010 Contractor: Black Roofing Inc Client: Hiroshi Nakata | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 71 Siding permit - for replacement of cedar siding with new housewrap, 3 8-inch insulation and james harde cement siding and trim for canyon pointe apartments. Date: September 29, 2010 Contractor: Mountain View Corporation Inc Client: Authority Housing | Applicant: Mountain View Corporation, Inc | Permit type: Siding | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Multifamily dwe | |||||
SCORE 95 Replacement of domestic hot water heater for multi-unit dwelling. Date: October 26, 2010 Contractor: Timberline Mechanical Systems Client: Authority Housing | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2014 | Current use: Multifamily dwe | |||||
SCORE 95 Set dumpster in street for 4 months Date: November 1, 2010 Contractor: Coburn Development Inc Client: Authority Housing | Applicant: Coburn Development Inc | Permit type: Right-of-way | Permit status: N&v | |||||
SCORE 95 Installation of a replacement rtu -- evaporative cooler & duct heater, minor ductwork modifications. Replacement unit is substantially the same size as the existing unit (perhaps a little smaller) and weighs approximately the same. Unit to be located at least ten feet from edge of rooftop edge. Date: November 23, 2010 Contractor: Timberline Mechanical Systems Client: Authority Housing | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: January 19, 2011 | Current use: Multifamily dwe | |||||
SCORE 95 Remove existing roofing and re-roof condo building with versico mechanically fastened mil tpo. 11 squares, flat roof. Date: April 1, 2011 Contractor: Black Roofing Inc Client: Real Alecta | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Multifamily dwe | |||||
SCORE 100 Replace gutter heat tape for apartment building Date: July 11, 2012 Contractor: Crystal Electric Inc Client: Authority Housing | Applicant: Crystal Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: October 1, 2012 | Current use: Multifamily dwe | |||||
SCORE 59 Installation of exterior snowmelt system for in-property sidewalk on north side of building and for building entry loading zone on north side of building. Scope of work to include installation of hydronic piping encased in concrete and hook-up to existing boiler. Date: June 2, 2015 Contractor: Landgraf Plumbing And Heating Inc Client: Authority Housing | Applicant: Landgraf Plumbing & Heating, Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 3, 2015 | Current use: Multifamily dwe | |||||
SCORE 99 Occupy parking area spaces Date: July 2, 2015 Contractor: Ccm Construction Management Inc Client: Authority Housing | Applicant: Ccm Construction Management Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Replace gutter heat tape for apartment building Client: Authority Housing | Permit type: Electrical | Permit status: Cmp | Completion date: October 1, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-03327 | |||||
SCORE 93 Pv installation on senior apartment building (boulder housing partners). Flush mounted, grid-tied, and 58. 8 kw. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 6, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-03247 | |||||
SCORE 95 Roofing permit - for re-roof of multi-family residential building with versico mechanically fastened 60-mil tpo at pitch of 1 4 inch per foot. Client: Hiroshi Nakata | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-03700 | |||||
SCORE 71 Siding permit - for replacement of cedar siding with new housewrap, 3 8-inch insulation and james harde cement siding and trim for canyon pointe apartments. Client: Authority Housing | Permit type: Siding | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-04233 | |||||
SCORE 95 Replacement of domestic hot water heater for multi-unit dwelling. Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-04658 | |||||
SCORE 95 Installation of a replacement rtu -- evaporative cooler & duct heater, minor ductwork modifications. Replacement unit is substantially the same size as the existing unit (perhaps a little smaller) and weighs approximately the same. Unit to be located at least ten feet from edge of rooftop edge. Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Completion date: January 19, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-05219 | |||||
SCORE 95 Remove existing roofing and re-roof condo building with versico mechanically fastened mil tpo. 11 squares, flat roof. Client: Real Alecta | Permit type: Roofing | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-01277 | |||||
SCORE 71 Installation of exterior snowmelt system for in-property sidewalk on north side of building and for building entry loading zone on north side of building. Scope of work to include installation of hydronic piping encased in concrete and hook-up to existing boiler. Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Completion date: August 3, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-02138 | |||||
Repair conduit in road 15x6 traffic control 3-5 days Date: July 10, 2006 Client: Authority Housing | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2006-02685 | |||||
SCORE 72 Remove and replace 2 square feet of sidewalk Date: May 31, 2017 Contractor: Anaya Concrete Corp Client: Authority Housing | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-02274 | |||||
U g cable replacement with a new 50foot bore with two pot holes job# 12416683 Date: March 10, 2017 Client: Authority Housing | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-00808 | |||||
SCORE 95 Install 36,0 btu comfort cooling unit in community room. Client: Authority Housing | Permit type: Electrical, mechanical | Permit status: Cmp | Current use: Multifamily dwellings, existing | Permit id: Pmt2002-02507 | |||||
SCORE 86 Repair existing 2foot x 5foot handhold Date: February 11, 2003 Contractor: Utilx Corporation Client: Authority Housing | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2003-00474 | |||||
SCORE 99 Demolish and re-build roof-top concrete recreation deck. Permit type: Building | Permit status: Cmp | Completion date: December 6, 2005 | Current use: Deck, alteration | Permit id: Pmt2005-02503 | |||||
SCORE 95 Mechanical permit to replace water heater in unit a. Client: Pensionfor Alecta | Permit type: Mechanical | Permit status: Cmp | Completion date: May 10, 2006 | Current use: Office - administrative, existing | Permit id: Pmt2006-01636 | |||||
SCORE 95 Elevator permit to repair 25 pound passenger elevator, 5 stories. Client: Properties Canyon | Permit type: Elevator | Permit status: Cls | Current use: Government uses, existing | Permit id: Pmt2006-01882 | |||||
Repair conduit in road 15footx6foot traffic control 3-5 days Date: July 10, 2006 Client: Authority Housing | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2006-02685 | |||||
SCORE 95 Fire sprinkler system - elevator pits Client: Authority Housing | Permit type: Fire | Permit status: Cmp | Completion date: May 20, 2008 | Current use: Multifamily dwellings, existing | Permit id: Pmt2007-00462 | |||||
SCORE 95 Fire alarm 7 walnut canyon pointe Client: Authority Housing | Permit type: Fire | Permit status: Cmp | Completion date: May 20, 2008 | Current use: Townhomes, existing | Permit id: Pmt2007-00609 | |||||
SCORE 93 Installation of several outlets for an ice-melt system for the gutters. Permit type: Electrical | Permit status: Cmp | Completion date: December 12, 2008 | Current use: Multifamily dwellings, existing | Permit id: Pmt2008-04334 | |||||
SCORE 95 Set dumpster in street for 4 months Contractor: Coburn Development Inc Client: Authority Housing | Permit type: Right-of-way | Permit status: N&v | Permit id: Pmt2010-04771 | |||||
SCORE 95 Installation of a new s. F. Hanging sign for partyland ("major tenant") along the south facade of the walnut gardens shopping center. Date: July 3, 2002 Contractor: Supersign Inc Client: William Reynolds | Applicant: Supersign, Inc. | Permit type: Electrical, sign | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 Installation of a new s. F. Hanging sign for partyland (inchmajor tenantinch) along the south facade of the walnut gardens shopping center. Client: William Reynolds | Permit type: Electrical, sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2002-02517 |